Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr project proposes to drill 1 boring, ssi-9, to complete infiltration tests located on the north side of kenyon st. Nw. The borings will be 12 feet deep and 6 inches diameter. The boring will remain for up to 1 week and will be backfilled with bentonite slurry upon completion. The work area will not impact traffic, sidewalks, trees or parkign meters. Date: July 26, 2013 Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: February 9, 2014 | Permit id: Pa85101 | |||||
SCORE 56 Paving; sidewalk(s), fixture; wall, free standing (exception over 30"), fixture; repair in kind only Date: May 30, 2007 Contractor: Rene L Majors Permit type: Paving; sidewalk(s), fixture; wall, free standing (exception over 30"), fixture; repair in kind only | Permit status: Permit expired | Expiration date: June 30, 2007 | Permit id: Pa27319 | |||||
SCORE 100 Dccr project proposes to drill 1 boring, ssi-9, to complete infiltration tests located on the north side of kenyon st. Nw. The borings will be 12 feet deep and 6 inches diameter. The boring will remain for up to 1 week and will be backfilled with bentonite slurry upon completion. The work area will not impact traffic, sidewalks, trees or parkign meters. Date: July 26, 2013 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: February 9, 2014 | Permit id: Pa85101 | |||||
SCORE 79 Dccr project proposes to excavate two shallow pits (nebbv-25 and 26) for the purpose of utility location along the north and south side ofkenyon st. Nw, feet east of park place nw. The pits will be approximately 1 foot in diameter and less than feet deep. The pit will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 3 days and will require the full work time of 7am -7pm. The work zone will not impact sidewalks, parking meters and trees. Date: May 24, 2013 Contractor: Insight Llc Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: December 6, 2013 | Permit id: Pa83098 | |||||
SCORE 82 Construction staging area Date: June 27, 2013 Contractor: Dennis Showalter Insight Llc Permit status: Permit expired | Expiration date: July 25, 2013 | Permit id: Pa10103298 | |||||
SCORE 99 Construction staging area Date: August 29, 2013 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: September 28, 2013 | Permit id: Pa10111545 |