Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: December 23, 2016 Contractor: H V A C Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 9, 2016 Contractor: Integrity Solar Electric Corp Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 30, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: February 14, 2017 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: November 28, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 9, 2016 Contractor: Integrity Solar Electric Corp Permit type: Res roof mt solar pv | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 93 Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: December 23, 2016 Contractor: H V A C Permit type: Mechanical - hra electric heat pump/ac r&r | Permit status: Issued | Permit id: Pds2016-Resalt- |