Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 4 sq ft addition to sfd - master bedroom and bathroom. Misc electrical and plumbing. 9-14-05 - reduction of 16 sq ft from addition. Vam. 09 20 05 - plan change-moving location of the proposed bathroom to a place where was closet and closet to a place where was proposed bathroom... Ok per mco Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1004-20 | Parcel: 501-142-12-00 | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 10, 2016 Contractor: Kbi Electric Incdba Repower San Marcos Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2016-Resalt- |