Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Installation of a retaining wall and fence. Date: December 22, 2015 Value: $300 Client: Taylor Park Condo Association | Permit type: Fixture; retaining w | |||||
SCORE 87 Install temporary rental fence around perimeter of property. Date: May 1, 2012 Contractor: Timothy Chamberlain Permit type: Fixture; fence to 42" (open design) | Permit status: Cancel/withdrawn | Expiration date: May 30, 2012 | |||||
SCORE 82 Repair/re point existing retaining wall , install new concrete slab Date: July 26, 2012 Contractor: Kealee Construction Permit type: Paving; driveway(s) new -residential, paving; leadwalk w/steps, fixture; repair retaining wall (no change) | Permit status: Cancel/withdrawn | Expiration date: January 21, 2013 | |||||
SCORE 82 Repair existing leadwalk with steps with flagstone. Date: August 1, 2012 Contractor: Kealee Construction Permit type: Paving; leadwalk w/steps | Permit status: Approved (pending payment | Expiration date: September 29, 2012 | |||||
SCORE 95 Make necessay excavation to install 15 of service conduit also abandon service conduit and miscellaneous equipment to 4024 14th street, n. W. This construction permit requires a separate occupancy permit. The attached plans and condition are apart of this permit. If steel plates are used at this job site an additional permit is needed. Wr #3370259 tcp #3 cut #27554 robert c. Brown (202) 388-2602(grb) rcbrown@pepco. Com (s placide) Date: December 19, 2012 Contractor: Pepco Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: May 4, 2013 | Permit id: Pa77999 | |||||
SCORE 81 Installation of a retaining wall and fence. Date: December 22, 2015 Contractor: Taylor Park Condo Association Permit type: Fixture; retaining wall w/open fence combo to 42" | Permit status: Cancel/withdrawn | Expiration date: July 1, 2016 | |||||
SCORE 81 Installation of a retaining wall and fence Date: September 9, 2016 Contractor: Taylor Park Condo Association Permit type: Fixture; retaining wall w/open fence combo to 42" | Permit status: Approved (pending payment | Expiration date: January 19, 2017 | |||||
SCORE 82 Repair re point existing retaining wall , install new concrete slab Date: July 26, 2012 Contractor: Kealee Construction Permit type: Paving; driveway(s) new -residential, paving; leadwalk w/steps, fixture; repair retaining wall (no change) | Permit status: Cancel/withdrawn | Expiration date: January 21, 2013 | |||||
SCORE 87 Construction staging area Contractor: Timothy Chamberlain Permit status: Notpaid | Expiration date: June 15, 2012 | Permit id: 0 | |||||
SCORE 87 Construction staging area Contractor: Timothy Chamberlain Permit status: Rejected | Expiration date: July 2, 2012 | Permit id: 0 | |||||
SCORE 81 Fixture; retaining wall w open fence combo to 42" Contractor: Taylor Park Condo Association Permit status: 3 | Expiration date: July 1, 2016 | Permit id: 0 | |||||
SCORE 82 Paving; leadwalk w steps Contractor: Kealee Construction Permit status: 3 | Expiration date: September 29, 2012 | Permit id: 0 | |||||
SCORE 87 Fixture; fence to 42" (open design) Contractor: Timothy Chamberlain Permit status: 3 | Expiration date: May 30, 2012 | Permit id: 0 | |||||
SCORE 82 Paving; driveway(s) new -residential, paving; leadwalk w steps, fixture; repair retaining wall (no change) Contractor: Kealee Construction Permit status: 3 | Expiration date: January 21, 2013 | Permit id: 0 | |||||
SCORE 87 Install temporary rental fence around perimeter of property. Contractor: Timothy Chamberlain Permit status: Cancel/withdrawn | Expiration date: May 30, 2012 | Permit id: 0 | |||||
SCORE 82 Repair existing leadwalk with steps with flagstone. Contractor: Kealee Construction Permit status: Cancel/withdrawn | Expiration date: September 29, 2012 | Permit id: 0 | |||||
SCORE 82 Repair re point existing retaining wall , install new concrete slab Contractor: Kealee Construction Permit status: Cancel/withdrawn | Expiration date: January 21, 2013 | Permit id: 0 | |||||
SCORE 82 Repair existing leadwalk with steps with flagstone. Date: August 1, 2012 Contractor: Kealee Construction Permit type: Paving; leadwalk w/steps | Permit status: Cancel/withdrawn | Expiration date: September 29, 2012 | Permit id: 0 | |||||
SCORE 95 Make necessary excavation to install 14 of service conduit and miscellaneous equipment to 4024 14th street, nw, as indicated on the approved attached prints. Wr #3370259; cut #27554; tcp #3; ward 4; robert brown/202-388-2602/rcbrown@pepco. Com (racm) Date: August 3, 2012 Contractor: Pepco Holdings Inc Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: November 12, 2012 | Permit id: Pa74218 | |||||
SCORE 81 Installation of a retaining wall and fence Date: July 11, 2017 Contractor: Taylor Park Condo Association Permit type: Fixture; retaining wall w/open fence combo to 42" | Permit status: Permit expired | Expiration date: August 30, 2017 | Permit id: Pa183526-R1 | |||||
SCORE 81 Installation of a retaining wall and fence Contractor: Taylor Park Condo Association Permit type: Fixture; retaining wall w/open fence combo to 42" | Permit status: Issued | Expiration date: December 28, 2017 | Permit id: Pa183526-R3 | |||||
SCORE 87 Fixture; fence to 42" (open design) Contractor: Timothy Chamberlain Permit status: 3 | Expiration date: May 30, 2012 | Permit id: 0 | |||||
SCORE 82 Paving; driveway(s) new -residential, paving; leadwalk w steps, fixture; repair retaining wall (no change) Contractor: Kealee Construction Permit status: 3 | Expiration date: January 21, 2013 | Permit id: 0 | |||||
SCORE 82 Paving; leadwalk w steps Contractor: Kealee Construction Permit status: 3 | Expiration date: September 29, 2012 | Permit id: 0 | |||||
SCORE 95 Make necessary excavation to install 14 of service conduit and miscellaneous equipment to 4024 14th street, nw, as indicated on the approved attached prints. Wr #3370259; cut #27554; tcp #3; ward 4; robert brown 202-388-2602 rcbrown@pepco. Com (racm) Date: September 5, 2012 Contractor: Pepco Holdings Inc Permit status: Permit expired | Expiration date: November 12, 2012 | Permit id: Pa74218 | |||||
SCORE 95 Make necessay excavation to install 15 of service conduit also abandon service conduit and miscellaneous equipment to 4024 14th street, n. W. This construction permit requires a separate occupancy permit. The attached plans and condition are apart of this permit. If steel plates are used at this job site an additional permit is needed. Wr #3370259 tcp #3 cut #27554 robert c. Brown (202) 388-2602(grb) rcbrown@pepco. Com (s placide) Date: January 18, 2013 Contractor: Pepco Permit status: Permit expired | Expiration date: May 4, 2013 | Permit id: Pa77999 | |||||
SCORE 81 Fixture; retaining wall w open fence combo to 42" Contractor: Taylor Park Condo Association Permit status: 3 | Expiration date: July 1, 2016 | Permit id: 0 | |||||
SCORE 87 Construction staging area Contractor: Timothy Chamberlain Permit status: Rejected | Expiration date: July 2, 2012 | Permit id: 0 | |||||
SCORE 87 Construction staging area Contractor: Timothy Chamberlain Permit status: Notpaid | Expiration date: June 15, 2012 | Permit id: 0 | |||||
SCORE 87 Install temporary rental fence around perimeter of property. Contractor: Timothy Chamberlain Permit status: Cancel/withdrawn | Expiration date: May 30, 2012 | Permit id: 0 | |||||
SCORE 82 Repair re point existing retaining wall , install new concrete slab Contractor: Kealee Construction Permit status: Cancel/withdrawn | Expiration date: January 21, 2013 | Permit id: 0 | |||||
SCORE 82 Repair existing leadwalk with steps with flagstone. Contractor: Kealee Construction Permit status: Cancel/withdrawn | Expiration date: September 29, 2012 | Permit id: 0 | |||||
SCORE 81 Fixture; retaining wall w open fence combo to 42" Date: March 10, 2017 Contractor: Taylor Park Condo Association Permit status: Permit expired | Expiration date: July 1, 2017 | Permit id: Pa183526 | |||||
SCORE 56 Moving storage container Date: September 30, 2015 Contractor: Brooke Cutler Permit status: Permit expired | Expiration date: October 19, 2015 | Permit id: Pa10213183 | |||||
SCORE 56 Moving truck Date: March 13, 2017 Contractor: Ellie Schafer Permit status: Permit expired | Expiration date: March 28, 2017 | Permit id: Pa10380065 | |||||
SCORE 62 Moving truck Date: December 30, 2016 Contractor: Matthew Pennington Permit status: Permit expired | Expiration date: January 6, 2017 | Permit id: Pa10359514 | |||||
SCORE 59 Moving truck Date: April 8, 2017 Contractor: Robert Koepke Permit status: Permit expired | Expiration date: April 27, 2017 | Permit id: Pa10394682 | |||||
SCORE 81 Construction staging area Date: August 30, 2017 Contractor: Taylor Park Condo Association Permit status: Permit expired | Expiration date: September 17, 2017 | Permit id: Pa10456408 |