Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 The csx virginia avenue tunnel reconstruction project is located in southeast dc between south capitol street, se and 14th street, se and, for the most part, underneath virginia avenue, se. It replaces the existing 3,8 ft tunnel with two new 4,1 ft tunnels between 2nd street, se and the proposed 12th street, se. In consultation with the st. Paul aump church, csx will install a dc shpo approved interpretive panel within public space on the north side of the st. Paul aump church at 4 i street se. Date: July 18, 2016 Contractor: Csx Transportation Inc Permit type: Fixture; sign-free standing, mega projects; csx tunnel | Permit status: Assigned | Expiration date: July 31, 2017 | |||||
SCORE 56 Install a new driveway for the st. Paul aump church as a virginia avenue tunnel community betterment. Date: July 27, 2016 Contractor: N A Clark Parsons A Joint Venture Client: Clarkparsons, A Joint Venture | Permit type: Paving; driveway(s) new- commercial, over head work; pole removal (single or first one), over head work; streetlight(s) installation, mega projects; csx tunnel | Permit status: Assigned | Expiration date: July 31, 2017 | |||||
SCORE 61 Install a new driveway for the st. Paul aump church as a virginia avenue tunnel community betterment. Date: July 27, 2016 Contractor: Clark Parsons, A Joint Venture Client: Clark Parsons, A Joint Venture | Permit type: Paving; driveway(s) new- commercial, over head work; pole removal (single or first one), over head work; streetlight(s) installation, mega projects; csx tunnel | Permit status: Cancel/withdrawn | Expiration date: July 31, 2017 | |||||
SCORE 61 Paving; driveway(s) new- commercial, over head work; pole removal (single or first one), over head work; streetlight(s) installation, mega projects; csx tunnel Contractor: Clark Parsons, A Joint Venture Permit status: 3 | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 90 The csx virginia avenue tunnel reconstruction project is located in southeast dc between south capitol street, se and 14th street, se and, for the most part, underneath virginia avenue, se. It replaces the existing 3,8 ft tunnel with two new 4,1 ft tunnels between 2nd street, se and the proposed 12th street, se. In consultation with the st. Paul aump church, csx will install a dc shpo approved interpretive panel within public space on the north side of the st. Paul aump church at 4 i street se. Date: July 18, 2016 Contractor: Csx Transportation, Inc Permit type: Fixture; sign-free standing, mega projects; csx tunnel | Permit status: Issued | Expiration date: July 31, 2017 | Permit id: Pa180674 | |||||
SCORE 61 Paving; driveway(s) new- commercial, over head work; pole removal (single or first one), over head work; streetlight(s) installation, mega projects; csx tunnel Contractor: Clark Parsons, A Joint Venture Permit status: 3 | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 68 Construction staging area Date: April 26, 2013 Contractor: Karen Mills Permit status: Permit expired | Expiration date: May 22, 2013 | Permit id: Pa10094451 | |||||
SCORE 56 Other reserved parking Date: June 15, 2014 Contractor: Bruce Darconte Permit status: Permit expired | Expiration date: June 22, 2014 | Permit id: Pa10140700 |