Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Expedited Date: June 4, 2012 Applicant: Na Na Na | Permit status: Permit issued | Permit id: Ehop1290162 | |||||
Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: October 16, 2012 Applicant: David Brown | Permit type: Gas fitting | Permit status: Permit issued | Permit id: Pc14713508 | |||||
Replace 6 antennas, install 1 microwave dish on chimney, install 1 cabinet on existing steel platform. Date: November 28, 2012 Client: Westchester Corporation | Applicant: Westchester Corporation; Brad Fleegle | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1200330 | |||||
Hand auger up to five soil borings, 8 inches in diameter to a depth of 7. 5 feet to analyze soils and perform infiltration testing related to design of stormwater retrofits. The soil borings will be abandoned in accordance with the well permit conditions and all spoils from the borings will be protected so they wont migrate off-site in case of precipitation or other causes. Date: July 18, 2012 Client: Westchester Corporation | Applicant: Westchester Corporation; Limnotech | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200372 | |||||
Hand auger five soil borings to depth of 7. 5 feet to analyze soils and perform infiltration testing related to bio retention stormwater retrofit. The holes will be 8 inches in diameter to be abandon in accordance with the well permit conditions, and all soils will be protected so they will not migrate on/off site in case of precipatation or other causes. Date: March 26, 2012 Client: Westchester Corporation | Applicant: Westchester Corporation; Limnotech | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200148 | |||||
Emergency repair and waterproofing of 2 below grade parking garages Date: June 20, 2012 Client: Westchester Corporation | Applicant: The Westchester; Blackburn Architects | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1210379 | |||||
Interior renovations to 3 bathrooms and the kitchen of unit #532 to include plumbing and electrical work. Date: October 1, 2012 Client: Westchester Corporation | Applicant: Charles Robbins; Colin Clark | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1215047 | |||||
Refinish all wood floors, retile kitchen floor. Replacement in kind of kitchen cabinets, appliances and countertops. New base trim and crown moulding for entire unit. Patch plaster as needed. Paint entire unit. #109b Date: August 20, 2012 Client: Westchester Corporation | Applicant: Erik Schawrz; Cathie Harrison | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1212933 | |||||
Plumbing and gas Date: February 13, 2012 Client: Westchester Corporation | Permit status: Completed | Permit id: P1203132 | |||||
Convert one unit co-op to 2 units add party wall for load change to creat a new unit on 7th floor. Date: October 10, 2013 Client: Westchester Corporation | Applicant: Roshawn Dennies Consulting | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1308363 | |||||
Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: November 3, 2013 Client: Alexander Esfahani | Applicant: Alexander Esfahani | Permit type: Building | Permit status: Permit issued | Permit id: Pc22547910 | |||||
Replacement or repair of not more than existing outlets and not more than existing lighting fixtures for a residential, commercial or industrial project. Date: December 3, 2013 Applicant: Jayson Jolivette | Permit type: Electrical - general | Permit status: Completed | Permit id: Pc48343972 | |||||
Installation of not more than new outlets and not more than new lighting fixtures for a residential, commercial or industrial project. Date: November 3, 2013 Client: Alexander Esfahani | Applicant: Alexander Esfahani | Permit type: Electrical - general | Permit status: Permit issued | Permit id: Pc56198219 | |||||
Remove and replace 6 existing antennas. As per plans, as per code. Date: June 14, 2013 Client: Westchester Corporation | Applicant: Jim Calabrese | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1300151 | |||||
Plumbing and gas Date: June 6, 2013 Client: Westchester Corporation | Applicant: Harry W. Troxler | Permit status: Completed | Permit id: P1305443 | |||||
Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: June 5, 2013 Applicant: David Brown | Permit type: Gas fitting | Permit status: Permit issued | Permit id: Pc52585796 | |||||
Replacement of not more than 1 plumbing fixture, on a residential, commercial or industrial project. Date: September 11, 2013 Applicant: Sarah Voll | Permit type: Plumbing | Permit status: Permit issued | Permit id: Pc24947443 | |||||
Plumbing and gas Date: September 26, 2014 Client: Westchester Corporation | Applicant: David L. Hahn | Permit status: Completed | Permit id: P1408929 | |||||
Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: December 10, 2014 Applicant: Philip Brown | Permit type: Gas fitting | Permit status: Completed | Permit id: Pc88259338 | |||||
The electrical (heavy-up) postcard can be issued only to licensed contractors -- to upgrade 1 existing electrical system to a maximum of 2 amps. This electrical postcard permit does not authorize the erection of electrical service and/or meter boxes in public space. Date: October 29, 2014 Applicant: John Holt | Permit type: Electrical - heavy u | Permit status: Permit issued | Permit id: Pc30926994 | |||||
Modify an existing telecom facility by installing remaining antennas and equipment as per plans. Date: December 1, 2014 Client: Winchester Corporation | Applicant: Jim Calabrese | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1400179 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilctjpbtknz%2bi6wl8pagaaux Date: November 13, 2014 Client: Don Buchanan | Applicant: Steve Jaffe; Don Buchanan; Steve Jaffe | Permit type: Electrical | Permit status: Completed | Permit id: E63001050 | |||||
In addition to original permit b1200722 work. New scope includes upgrading existing fixtures and finishes in two existing bathrooms and removal of an interior partotion Date: January 6, 2012 Client: Avra Michelson | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1203612 | |||||
Plumbing and gas Date: December 5, 2012 Client: Westchester Corporation | Applicant: Darel J. Coutts | Permit status: Permit issued | Permit id: P1301480 | |||||
Electrical Date: January 12, 2012 Client: Westchester Corporation | Applicant: Steven H Jaffe | Permit status: Completed | Permit id: E1202546 | |||||
Interior renovation to include kitchen, laundry room, butlers pantry, bathrooms, and electrical Date: May 31, 2013 Client: Hutt | Applicant: Daniel Harrison | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1307271 | |||||
Plumbing and gas Date: July 31, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1306833 | |||||
New washer / dryer - extend existing front foyer of 702/703b into corridor - new gas line from existing gas line to new dryer - demolish existing non-bearing interior partitions in order to join two units. New kitchen. Date: April 30, 2013 Client: C. Tucker And Jane H. Battle | Applicant: Michael Finn | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1306279 | |||||
Kitchen and bathroom renovation. Replace fixtures in kind. Date: May 6, 2013 Client: Bueno | Applicant: Miller | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1306512 | |||||
Plumbing and gas Date: December 4, 2013 Client: Westchester Corporation | Applicant: Jerone Scott | Permit status: Completed | Permit id: P1401663 | |||||
Plumbing and gas Date: July 31, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1306834 | |||||
Plumbing and gas Date: May 1, 2013 Client: Westchester Corporation | Applicant: David L. Hahn | Permit status: Completed | Permit id: P1304675 | |||||
Electrical Date: July 11, 2013 Client: Westchester Corporation | Applicant: Anthony L. Cusimano | Permit status: Completed | Permit id: E1306696 | |||||
Electrical Date: July 1, 2013 Client: Westchester Corporation | Applicant: Hee Yeol Hwang | Permit status: Completed | Permit id: E1306471 | |||||
Electrical Date: October 15, 2013 Client: Westchester Corporation | Applicant: Steven H Jaffe | Permit status: Completed | Permit id: E1400415 | |||||
Plumbing and gas Date: June 25, 2013 Client: Westchester Corporation | Applicant: Joseph Lee | Permit status: Permit issued | Permit id: P1305926 | |||||
Combine co-op units 747 and 748 and interior renovation. Date: April 8, 2013 Client: Reifelkinney | Applicant: Tanya Hill | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1305073 | |||||
Alter & repair existing kitchen. New washing machine. Repair existing bath. New gypsumboard ceiling and lighting. Existing building plumbing to remain. Existing hvac to remain. Two new exterior wall exhaust vents. Alter and repair existing non structural interior partitions. Work only in unit 622-b Date: July 22, 2014 Client: Mary Blakeslee | Applicant: Michael Finn | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1409888 | |||||
Apartment renovation, interior only, including new kitchen, new hallway closet at entry and new linen closet. Date: February 21, 2014 Client: Tom Ainora | Applicant: Phillip Eagleburger | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1404470 | |||||
In addition to original permit b1200722 work. New scope includes upgrading existing fixtures and finishes in two existing bathrooms and removal of an interior partotion Date: January 6, 2012 Client: Avra Michelson | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1203612 | |||||
In addition to original permit b1200722 work. New scope includes upgrading existing fixtures and finishes in two existing bathrooms and removal of an interior partotion Date: January 6, 2012 Client: Avra Michelson | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1203612 | |||||
In addition to original permit b1200722 work. New scope includes upgrading existing fixtures and finishes in two existing bathrooms and removal of an interior partotion Date: January 6, 2012 Client: Avra Michelson | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1203612 | |||||
SCORE 93 Electrical Date: November 14, 2012 Contractor: Francis J Griffith Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1301079 | |||||
SCORE 74 Electrical Date: May 25, 2012 Contractor: James A. Williams; James A. Williams Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1206304 | |||||
SCORE 96 Electrical Date: July 25, 2012 Contractor: Ralph E. Jackson Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1207992 | |||||
Plumbing and gas Date: February 13, 2012 Client: Westchester Corporation | Permit status: Completed | Permit id: P1203132 | |||||
SCORE 59 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: March 25, 2013 Contractor: Kinney Reifel Client: Kinney Reifel | Permit type: Building | Permit status: Permit issued | Permit id: Pc96904913 | |||||
SCORE 92 Electrical Date: May 24, 2013 Contractor: Leo Halperin Client: Westchester Corporation | Permit status: Completed | Permit id: E1305542 | |||||
SCORE 96 Electrical Date: May 7, 2013 Contractor: Richard J Sheler Client: Westchester Corporation | Permit status: Completed | Permit id: E1305106 | |||||
SCORE 96 Electrical Date: December 13, 2013 Contractor: Ralph E. Jackson Client: Westchester Corporation | Permit status: Completed | Permit id: E1401979 | |||||
SCORE 96 Plumbing and gas Date: June 6, 2013 Contractor: Harry W. Troxler Client: Westchester Corporation | Permit status: Completed | Permit id: P1305443 | |||||
SCORE 96 Plumbing and gas Date: October 8, 2013 Contractor: Joseph M Magnolia Client: Westchester Corporation | Permit status: Completed | Permit id: P1400221 | |||||
SCORE 92 Plumbing and gas Date: September 13, 2013 Contractor: Richard G. Finfrock Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1307899 | |||||
SCORE 96 Plumbing and gas Date: September 26, 2014 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Completed | Permit id: P1408929 | |||||
SCORE 96 Electrical Date: July 2, 2014 Contractor: Frederick T Patterson Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1406871 | |||||
SCORE 96 Plumbing and gas Date: May 13, 2014 Contractor: Jerome B. Treadwell Client: Westchester Corporation | Permit status: Completed | Permit id: P1405494 | |||||
SCORE 93 Plumbing and gas Date: January 20, 2015 Contractor: Joseph Magnolia Client: Westchester Corporation | Permit status: Completed | Permit id: P1502783 | |||||
SCORE 100 Electrical Date: July 8, 2015 Contractor: Ralph Threatt Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1507292 | |||||
SCORE 96 Plumbing and gas Date: June 1, 2015 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1506228 | |||||
SCORE 96 Plumbing and gas Date: May 26, 2015 Contractor: James K. Beck Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1506073 | |||||
SCORE 96 Plumbing and gas Date: January 12, 2015 Contractor: Joseph M Magnolia Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1502572 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilckxtoyumi5beiri%2fcldtol Date: August 13, 2015 Contractor: James Humphrey James Humphrey Dennis Misal Client: James Humphrey | Permit type: Electrical | Permit status: Permit issued | Permit id: E51964216 | |||||
SCORE 56 Replace 6 antennas, install 1 microwave dish on chimney, install 1 cabinet on existing steel platform. Date: November 28, 2012 Contractor: Westchester Corporation Brad Fleegle Client: Westchester Corporation | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1200330 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilctjpbtknz%2bi6wl8pagaaux Date: November 13, 2014 Contractor: Steve Jaffe Don Buchanan Steve Jaffe Client: Don Buchanan | Permit type: Electrical | Permit status: Completed | Permit id: E63001050 | |||||
SCORE 96 Electrical Date: July 25, 2012 Contractor: Ralph E. Jackson Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1207992 | |||||
SCORE 64 Electrical Date: May 25, 2012 Contractor: James A. Williams James A. Williams Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1206304 | |||||
SCORE 93 Electrical Date: November 14, 2012 Contractor: Francis J Griffith Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1301079 | |||||
Plumbing and gas Date: February 13, 2012 Client: Westchester Corporation | Permit status: Completed | Permit id: P1203132 | |||||
SCORE 59 Hand auger five soil borings to depth of 7. 5 feet to analyze soils and perform infiltration testing related to bio retention stormwater retrofit. The holes will be 8 inches in diameter to be abandon in accordance with the well permit conditions, and all soils will be protected so they will not migrate on/off site in case of precipatation or other causes. Date: March 26, 2012 Contractor: Westchester Corporation Limnotech Client: Westchester Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200148 | |||||
SCORE 59 Hand auger up to five soil borings, 8 inches in diameter to a depth of 7. 5 feet to analyze soils and perform infiltration testing related to design of stormwater retrofits. The soil borings will be abandoned in accordance with the well permit conditions and all spoils from the borings will be protected so they wont migrate off-site in case of precipitation or other causes. Date: July 18, 2012 Contractor: Westchester Corporation Limnotech Client: Westchester Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200372 | |||||
SCORE 92 Electrical Date: May 24, 2013 Contractor: Leo Halperin Client: Westchester Corporation | Permit status: Completed | Permit id: E1305542 | |||||
SCORE 96 Electrical Date: May 7, 2013 Contractor: Richard J Sheler Client: Westchester Corporation | Permit status: Completed | Permit id: E1305106 | |||||
SCORE 96 Electrical Date: December 13, 2013 Contractor: Ralph E. Jackson Client: Westchester Corporation | Permit status: Completed | Permit id: E1401979 | |||||
SCORE 92 Plumbing and gas Date: September 13, 2013 Contractor: Richard G. Finfrock Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1307899 | |||||
SCORE 96 Plumbing and gas Date: June 6, 2013 Contractor: Harry W. Troxler Client: Westchester Corporation | Permit status: Completed | Permit id: P1305443 | |||||
SCORE 96 Plumbing and gas Date: October 8, 2013 Contractor: Joseph M Magnolia Client: Westchester Corporation | Permit status: Completed | Permit id: P1400221 | |||||
SCORE 59 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: March 25, 2013 Contractor: Kinney Reifel Client: Kinney Reifel | Permit type: Building | Permit status: Permit issued | Permit id: Pc94655942 | |||||
SCORE 96 Electrical Date: July 2, 2014 Contractor: Frederick T Patterson Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1406871 | |||||
SCORE 56 Emergency repair and waterproofing of 2 below grade parking garages Date: June 20, 2012 Contractor: The Westchester Blackburn Architects Client: Westchester Corporation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1210379 | |||||
SCORE 56 Interior renovations to 3 bathrooms and the kitchen of unit #532 to include plumbing and electrical work. Date: October 1, 2012 Contractor: Charles Robbins Colin Clark Client: Westchester Corporation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1215047 | |||||
SCORE 96 Plumbing and gas Date: September 26, 2014 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Completed | Permit id: P1408929 | |||||
SCORE 96 Plumbing and gas Date: May 13, 2014 Contractor: Jerome B. Treadwell Client: Westchester Corporation | Permit status: Completed | Permit id: P1405494 | |||||
SCORE 56 Remove six 6 antennas, replace with six 6 antennas, to keep total of 15 antennas. No ground work. Date: September 28, 2016 Client: . The Westchester Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1600162 | |||||
SCORE 96 Plumbing and gas Date: September 26, 2014 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Completed | Permit id: P1408929 | |||||
SCORE 96 Plumbing and gas Date: May 13, 2014 Contractor: Jerome B. Treadwell Client: Westchester Corporation | Permit status: Completed | Permit id: P1405494 | |||||
SCORE 96 Plumbing and gas Date: November 17, 2016 Contractor: Joseph M Magnolia Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1701339 | |||||
SCORE 100 Remove and replace 6 existing antennas. As per plans, as per code. Date: June 14, 2013 Contractor: Jim Calabrese Client: Westchester Corporation | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1300151 | |||||
SCORE 59 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: November 3, 2013 Contractor: Alexander Esfahani Client: Alexander Esfahani | Permit type: Building | Permit status: Permit issued | Permit id: Pc22547910 | |||||
SCORE 93 Replacement or repair of not more than existing outlets and not more than existing lighting fixtures for a residential, commercial or industrial project. Date: December 3, 2013 Contractor: Jayson Jolivette Permit type: Electrical - general | Permit status: Completed | Permit id: Pc48343972 | |||||
SCORE 93 Installation of not more than new outlets and not more than new lighting fixtures for a residential, commercial or industrial project. Date: October 1, 2013 Contractor: Keith Harpster Permit type: Electrical - general | Permit status: Permit issued | Permit id: Pc32989506 | |||||
SCORE 59 Installation of not more than new outlets and not more than new lighting fixtures for a residential, commercial or industrial project. Date: November 3, 2013 Contractor: Alexander Esfahani Client: Alexander Esfahani | Permit type: Electrical - general | Permit status: Permit issued | Permit id: Pc56198219 | |||||
SCORE 56 Replacement of not more than 1 plumbing fixture, on a residential, commercial or industrial project. Date: September 11, 2013 Contractor: Sarah Voll Permit type: Plumbing | Permit status: Permit issued | Permit id: Pc24947443 | |||||
SCORE 100 Modify an existing telecom facility by installing remaining antennas and equipment as per plans. Date: December 1, 2014 Contractor: Jim Calabrese Client: Winchester Corporation | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1400179 | |||||
SCORE 100 Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: December 10, 2014 Contractor: Philip Brown Permit type: Gas fitting | Permit status: Completed | Permit id: Pc88259338 | |||||
SCORE 56 Interior renovations to 3 bathrooms and the kitchen of unit #532 to include plumbing and electrical work. Date: October 1, 2012 Contractor: Charles Robbins; Colin Clark Client: Westchester Corporation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1215047 | |||||
SCORE 56 Emergency repair and waterproofing of 2 below grade parking garages Date: June 20, 2012 Contractor: The Westchester; Blackburn Architects Client: Westchester Corporation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1210379 | |||||
SCORE 56 Replace 6 antennas, install 1 microwave dish on chimney, install 1 cabinet on existing steel platform. Date: November 28, 2012 Contractor: Westchester Corporation; Brad Fleegle Client: Westchester Corporation | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1200330 | |||||
SCORE 59 Hand auger up to five soil borings, 8 inches in diameter to a depth of 7. 5 feet to analyze soils and perform infiltration testing related to design of stormwater retrofits. The soil borings will be abandoned in accordance with the well permit conditions and all spoils from the borings will be protected so they wont migrate off-site in case of precipitation or other causes. Date: July 18, 2012 Contractor: Westchester Corporation; Limnotech Client: Westchester Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200372 | |||||
SCORE 100 Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: October 16, 2012 Contractor: David Brown Permit type: Gas fitting | Permit status: Permit issued | Permit id: Pc14713508 | |||||
SCORE 96 Electrical Date: July 25, 2012 Contractor: Ralph E. Jackson Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1207992 | |||||
SCORE 74 Electrical Date: May 25, 2012 Contractor: James A. Williams; James A. Williams Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1206304 | |||||
SCORE 93 Electrical Date: November 14, 2012 Contractor: Francis J Griffith Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1301079 | |||||
Plumbing and gas Date: February 13, 2012 Client: Westchester Corporation | Permit status: Completed | Permit id: P1203132 | |||||
SCORE 92 Electrical Date: May 24, 2013 Contractor: Leo Halperin Client: Westchester Corporation | Permit status: Completed | Permit id: E1305542 | |||||
SCORE 96 Electrical Date: May 7, 2013 Contractor: Richard J Sheler Client: Westchester Corporation | Permit status: Completed | Permit id: E1305106 | |||||
SCORE 96 Electrical Date: December 13, 2013 Contractor: Ralph E. Jackson Client: Westchester Corporation | Permit status: Completed | Permit id: E1401979 | |||||
SCORE 92 Plumbing and gas Date: September 13, 2013 Contractor: Richard G. Finfrock Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1307899 | |||||
SCORE 96 Plumbing and gas Date: June 6, 2013 Contractor: Harry W. Troxler Client: Westchester Corporation | Permit status: Completed | Permit id: P1305443 | |||||
SCORE 96 Plumbing and gas Date: October 8, 2013 Contractor: Joseph M Magnolia Client: Westchester Corporation | Permit status: Completed | Permit id: P1400221 | |||||
SCORE 100 Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: July 15, 2014 Contractor: Philip Brown Permit type: Gas fitting | Permit status: Permit issued | Permit id: Pc70939378 | |||||
SCORE 96 Electrical Date: July 2, 2014 Contractor: Frederick T Patterson Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1406871 | |||||
SCORE 96 Plumbing and gas Date: September 26, 2014 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Completed | Permit id: P1408929 | |||||
SCORE 96 Plumbing and gas Date: May 13, 2014 Contractor: Jerome B. Treadwell Client: Westchester Corporation | Permit status: Completed | Permit id: P1405494 | |||||
SCORE 91 901 6th st. Sw 39 watson pl. Nw 1054 31st st. Nw 411 h st. Ne 1148 g st. Se new jersey ave ? E. St. Nw 15th ? C st. Se 1387 h st. Ne 13th st. ? H st. Nw Date: June 29, 2015 Contractor: Pepco Pepco Client: Pepco Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500544 | |||||
SCORE 100 Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: January 26, 2015 Contractor: David Brown Permit type: Gas fitting | Permit status: Completed | Permit id: Pc86233382 | |||||
SCORE 100 Electrical Date: July 8, 2015 Contractor: Ralph Threatt Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1507292 | |||||
SCORE 96 Plumbing and gas Date: January 12, 2015 Contractor: Joseph M Magnolia Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1502572 | |||||
SCORE 96 Plumbing and gas Date: June 1, 2015 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1506228 | |||||
SCORE 96 Plumbing and gas Date: May 26, 2015 Contractor: James K. Beck Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1506073 | |||||
SCORE 93 Plumbing and gas Date: January 20, 2015 Contractor: Joseph Magnolia Client: Westchester Corporation | Permit status: Completed | Permit id: P1502783 | |||||
SCORE 56 Interior project: kitchen - level 2 alteration - replace kitchen appliances and cabinets bathroom - level 2 alteration - replace toilet and sink Date: May 13, 2016 Contractor: Barbara Block; Keith Bigenho Client: Barbara Block | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1608185 | |||||
SCORE 56 Remove six 6 antennas, replace with six 6 antennas, to keep total of 15 antennas. No ground work. Date: September 28, 2016 Client: . The Westchester Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1600162 | |||||
SCORE 56 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: August 3, 2016 Contractor: Nora Boustany Permit type: Building | Permit status: Permit issued | Permit id: Pc92666603 | |||||
SCORE 56 Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: September 9, 2016 Contractor: Leslie Moorman Permit type: Gas fitting | Permit status: Permit issued | Permit id: Pc86969414 | |||||
SCORE 93 Installation of not more than 1 new plumbing fixture, on a residential, commercial or industrial project. Date: June 9, 2016 Contractor: Gregory Lapitsky Permit type: Plumbing | Permit status: Permit issued | Permit id: Pc99091255 | |||||
SCORE 96 Plumbing and gas Date: November 17, 2016 Contractor: Joseph M Magnolia Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1701339 | |||||
SCORE 82 Removal of non load bearing partitions, shelving, cabinets, plumbing fixtures, radiator Date: May 25, 2017 Contractor: Jesse Tarr Client: Westchester Corporation | Permit type: Demolition | Permit status: Permit issued | Permit id: D1700519 | |||||
SCORE 82 A: replace doors, cabinets, shelving, and non load bearing partitions e: replace electric fireplace p: replace toilets, sinks, and one tub Date: May 25, 2017 Contractor: Jesse Tarr Client: Westchester Corporation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1708820 | |||||
SCORE 56 Complete bathroom renovation including moving bathroom door after the closet area, relocating sink to new location, replacing sunken tub with free standing tub, adding shower stall Date: May 16, 2017 Contractor: Alberto Andretta Client: Alberto Andretta | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1708361 | |||||
SCORE 96 Electrical Date: January 24, 2017 Contractor: James G Holt Client: Westchester Corporation | Permit status: Completed | Permit id: E1703093 | |||||
SCORE 59 Hand auger five soil borings to depth of 7. 5 feet to analyze soils and perform infiltration testing related to bio retention stormwater retrofit. The holes will be 8 inches in diameter to be abandon in accordance with the well permit conditions, and all soils will be protected so they will not migrate on/off site in case of precipatation or other causes. Date: March 26, 2012 Contractor: Westchester Corporation; Limnotech Client: Westchester Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200148 | |||||
SCORE 100 Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: June 5, 2013 Contractor: David Brown Permit type: Gas fitting | Permit status: Permit issued | Permit id: Pc52585796 | |||||
SCORE 89 The electrical (heavy-up) postcard can be issued only to licensed contractors -- to upgrade 1 existing electrical system to a maximum of 2 amps. This electrical postcard permit does not authorize the erection of electrical service and/or meter boxes in public space. Date: October 29, 2014 Contractor: John Holt Permit type: Electrical - heavy up | Permit status: Permit issued | Permit id: Pc30926994 | |||||
SCORE 100 Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project. Date: October 18, 2014 Contractor: David Brown Permit type: Gas fitting | Permit status: Permit issued | Permit id: Pc79932957 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilctjpbtknz%2bi6wl8pagaaux Date: November 13, 2014 Contractor: Steve Jaffe; Don Buchanan; Steve Jaffe Client: Don Buchanan | Permit type: Electrical | Permit status: Completed | Permit id: E63001050 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc%2b9hzc7q7opevd%2fmrhvytd Date: March 17, 2015 Contractor: Steve Jaffe; Mary Blakeslee; Steve Jaffe Client: Mary Blakeslee | Permit type: Electrical | Permit status: Completed | Permit id: E42682376 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilckxtoyumi5beiri%2fcldtol Date: August 13, 2015 Contractor: James Humphrey; James Humphrey; Dennis Misal Client: James Humphrey | Permit type: Electrical | Permit status: Permit issued | Permit id: E51964216 | |||||
SCORE 100 Replace 9 existing with 9 new antennas. No ground work. Please note that the site is still operating within the dcra requirement of 5 antennas per sector/mount, therefore no op review is required. As per plans, as per code. Date: October 14, 2015 Contractor: Jim Calabrese Client: Westchester Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1500232 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeiledwgjmbzfwrohook8e58qd Date: May 24, 2016 Contractor: Mrs. Block; Mrs. Block; Richard Stockslager Client: Mrs. Block | Permit type: Electrical | Permit status: Permit issued | Permit id: E51911942 | |||||
SCORE 56 Remove six 6 antennas, replace with six 6 antennas, to keep total of 15 antennas. No ground work. Date: September 28, 2016 Client: . The Westchester Corporation | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1600162 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/eservices. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile6zvdbbtmtvma43u8avmwd Date: August 23, 2016 Contractor: Orlando Catana; Shelly Madden; Orlando Catana Client: Shelly Madden | Permit type: Electrical | Permit status: Permit issued | Permit id: E39073366 | |||||
Electrical Date: July 11, 2017 Client: Westchester Corporation | Permit status: Permit issued | Permit id: E1708155 | |||||
Plumbing and gas Date: July 11, 2017 Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1707364 | |||||
SCORE 56 Refinish all wood floors, retile kitchen floor. Replacement in kind of kitchen cabinets, appliances and countertops. New base trim and crown moulding for entire unit. Patch plaster as needed. Paint entire unit. #109b Date: August 20, 2012 Contractor: Erik Schawrz Cathie Harrison Client: Westchester Corporation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1212933 | |||||
SCORE 56 Refinish all wood floors, retile kitchen floor. Replacement in kind of kitchen cabinets, appliances and countertops. New base trim and crown moulding for entire unit. Patch plaster as needed. Paint entire unit. #109b Date: August 20, 2012 Contractor: Erik Schawrz; Cathie Harrison Client: Westchester Corporation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1212933 | |||||
SCORE 96 Expedited Date: June 4, 2012 Contractor: Na Na Na Permit status: Permit issued | Permit id: Ehop1290162 | |||||
SCORE 96 Expedited Date: June 4, 2012 Contractor: Na Na Na Permit status: Permit issued | Permit id: Ehop1290162 | |||||
SCORE 99 Combine co-op units 747 and 748 and interior renovation. Date: April 8, 2013 Contractor: Tanya Hill Client: Reifelkinney | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1305073 | |||||
SCORE 96 Electrical Date: July 30, 2013 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1307198 | |||||
Plumbing and gas Date: July 31, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1306833 | |||||
SCORE 96 Electrical Date: July 30, 2013 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1307198 | |||||
Plumbing and gas Date: July 31, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1306833 | |||||
SCORE 100 Interior renovation to include kitchen, laundry room, butlers pantry, bathrooms, and electrical Date: May 31, 2013 Contractor: Daniel Harrison Client: Hutt | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1307271 | |||||
SCORE 96 Electrical Date: July 30, 2013 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1307198 | |||||
Plumbing and gas Date: July 31, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1306833 | |||||
SCORE 96 New washer / dryer - extend existing front foyer of 702/703b into corridor - new gas line from existing gas line to new dryer - demolish existing non-bearing interior partitions in order to join two units. New kitchen. Date: April 30, 2013 Contractor: Michael Finn Client: C. Tucker And Jane H. Battle | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1306279 | |||||
SCORE 96 Electrical Date: October 15, 2013 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1400415 | |||||
SCORE 56 Convert one unit co-op to 2 units add party wall for load change to creat a new unit on 7th floor. Date: October 10, 2013 Contractor: Roshawn Dennies Consulting Client: Westchester Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1308363 | |||||
SCORE 96 Electrical Date: October 15, 2013 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1400415 | |||||
SCORE 89 Electrical Date: July 11, 2013 Contractor: Anthony L. Cusimano Client: Westchester Corporation | Permit status: Completed | Permit id: E1306696 | |||||
SCORE 89 Electrical Date: July 11, 2013 Contractor: Anthony L. Cusimano Client: Westchester Corporation | Permit status: Completed | Permit id: E1306696 | |||||
SCORE 89 Electrical Date: July 11, 2013 Contractor: Anthony L. Cusimano Client: Westchester Corporation | Permit status: Completed | Permit id: E1306696 | |||||
SCORE 96 Electrical Date: October 15, 2013 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1400415 | |||||
SCORE 96 Electrical Date: October 15, 2013 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1400415 | |||||
SCORE 96 Electrical Date: July 1, 2013 Contractor: Hee Yeol Hwang Client: Westchester Corporation | Permit status: Completed | Permit id: E1306471 | |||||
SCORE 96 Electrical Date: July 1, 2013 Contractor: Hee Yeol Hwang Client: Westchester Corporation | Permit status: Completed | Permit id: E1306471 | |||||
SCORE 96 Electrical Date: July 1, 2013 Contractor: Hee Yeol Hwang Client: Westchester Corporation | Permit status: Completed | Permit id: E1306471 | |||||
Plumbing and gas Date: December 4, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1401663 | |||||
Plumbing and gas Date: December 4, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1401663 | |||||
Plumbing and gas Date: July 31, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1306834 | |||||
Plumbing and gas Date: July 31, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1306834 | |||||
Plumbing and gas Date: July 31, 2013 Client: Westchester Corporation | Permit status: Completed | Permit id: P1306834 | |||||
SCORE 98 Plumbing and gas Date: June 25, 2013 Contractor: Joseph Lee Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1305926 | |||||
SCORE 98 Plumbing and gas Date: June 25, 2013 Contractor: Joseph Lee Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1305926 | |||||
SCORE 97 Kitchen and bathroom renovation. Replace fixtures in kind. Date: May 6, 2013 Contractor: Miller Client: Bueno | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1306512 | |||||
SCORE 98 Plumbing and gas Date: June 25, 2013 Contractor: Joseph Lee Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1305926 | |||||
SCORE 96 Plumbing and gas Date: May 1, 2013 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Completed | Permit id: P1304675 | |||||
SCORE 96 Plumbing and gas Date: May 1, 2013 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Completed | Permit id: P1304675 | |||||
SCORE 96 Plumbing and gas Date: May 1, 2013 Contractor: David L. Hahn Client: Westchester Corporation | Permit status: Completed | Permit id: P1304675 | |||||
SCORE 82 Apartment renovation, interior only, including new kitchen, new hallway closet at entry and new linen closet. Date: February 21, 2014 Contractor: Phillip Eagleburger Client: Tom Ainora | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1404470 | |||||
SCORE 96 Alter & repair existing kitchen. New washing machine. Repair existing bath. New gypsumboard ceiling and lighting. Existing building plumbing to remain. Existing hvac to remain. Two new exterior wall exhaust vents. Alter and repair existing non structural interior partitions. Work only in unit 622-b Date: July 22, 2014 Contractor: Michael Finn Client: Mary Blakeslee | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1409888 | |||||
SCORE 63 Apartment renovation, interior only, including new kitchen, new bathroom, new closets in bedroom, and custom built-ins throughout. Date: April 3, 2015 Contractor: Allison Wood Client: James Humphrey | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1505380 | |||||
SCORE 72 Kitchen: pull and replace existing cabinetry, countertops, plumbing fixtures, and appliances master bath: expand into existing hall powder room. Build shower in existing bath tub location and frame in wall. Laundry: pull and replace existing cabinetry and appliances Date: June 1, 2015 Contractor: Orli Perez The Permit Lady Client: Gretchen Handwerger | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1508254 | |||||
SCORE 96 Plumbing and gas Date: July 7, 2015 Contractor: Percy O. Jackson Client: Westchester Corporation | Permit status: Completed | Permit id: P1507302 | |||||
SCORE 89 Work in unit b only. Bathroom renovation, including: remove bath tub, and install new shower. Install shower valve and shower head. Install recessed light over the shower. Install new faucet and new toilet. Install new tile. Install new range in the kitchen. Date: May 22, 2015 Contractor: Maciej Zelma Client: Louis Rabil | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1508038 | |||||
SCORE 96 Plumbing and gas Date: July 7, 2015 Contractor: Percy O. Jackson Client: Westchester Corporation | Permit status: Completed | Permit id: P1507302 | |||||
SCORE 96 Plumbing and gas Date: May 18, 2015 Contractor: Jay W Lipp Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1505889 | |||||
SCORE 96 Plumbing and gas Date: May 18, 2015 Contractor: Jay W Lipp Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1505889 | |||||
SCORE 56 Demolition of existing sfd bathroom located in one condo unit #749b on the 7th floor of building. Replace fixtures- to include sink, toilet, and tub- with new shower, sink, and toilet. New tile and paint and move electrical light. Date: February 18, 2016 Contractor: Maria Zablah Client: Enrique Ekias | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1604778 | |||||
SCORE 96 Expedited Date: May 26, 2016 Contractor: Na Na Na Permit status: Permit issued | Permit id: Ehop1690702 | |||||
SCORE 96 Expedited Date: May 26, 2016 Contractor: Na Na Na Permit status: Permit issued | Permit id: Ehop1690702 | |||||
SCORE 96 Expedited Date: May 26, 2016 Contractor: Na Na Na Permit status: Permit issued | Permit id: Ehop1690702 | |||||
SCORE 59 Demo a little wall opening to connnect aptos to be approx 48. Date: April 25, 2016 Contractor: Shopy And Brenda Burnham Client: Shopy And Brenda Burnham | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600534 | |||||
SCORE 88 Plumbing and gas Date: December 5, 2012 Contractor: Darel J. Coutts Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1301480 | |||||
SCORE 96 Electrical Date: January 12, 2012 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1202546 | |||||
SCORE 88 Plumbing and gas Date: June 3, 2016 Contractor: John C. Myers Client: Westchester Corporation | Permit status: Completed | Permit id: P1606669 | |||||
SCORE 96 Electrical Date: January 12, 2012 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1202546 | |||||
SCORE 88 Plumbing and gas Date: December 5, 2012 Contractor: Darel J. Coutts Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1301480 | |||||
SCORE 88 Plumbing and gas Date: June 3, 2016 Contractor: John C. Myers Client: Westchester Corporation | Permit status: Completed | Permit id: P1606669 | |||||
SCORE 96 Electrical Date: January 12, 2012 Contractor: Steven H Jaffe Client: Westchester Corporation | Permit status: Completed | Permit id: E1202546 | |||||
SCORE 88 Plumbing and gas Date: December 5, 2012 Contractor: Darel J. Coutts Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1301480 | |||||
SCORE 88 Plumbing and gas Date: June 3, 2016 Contractor: John C. Myers Client: Westchester Corporation | Permit status: Completed | Permit id: P1606669 | |||||
SCORE 96 Expedited Date: June 1, 2016 Contractor: Na Na Na Permit status: Permit issued | Permit id: Ehop1690713 | |||||
SCORE 96 Expedited Date: June 1, 2016 Contractor: Na Na Na Permit status: Permit issued | Permit id: Ehop1690713 | |||||
SCORE 96 Expedited Date: June 1, 2016 Contractor: Na Na Na Permit status: Permit issued | Permit id: Ehop1690713 | |||||
Plumbing and gas Date: August 12, 2016 Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1608649 | |||||
Plumbing and gas Date: August 12, 2016 Client: Westchester Corporation | Permit status: Permit issued | Permit id: P1608649 | |||||
SCORE 100 Plumbing and gas Date: August 12, 2016 Contractor: Jerone Scott Client: Westchester Corporation | Permit status: Completed | Permit id: P1608649 | |||||
SCORE 100 Plumbing and gas Date: August 12, 2016 Contractor: Jerone Scott Client: Westchester Corporation | Permit status: Completed | Permit id: P1608649 | |||||
SCORE 56 Update kitchen cabinets, countertop, bathroom tile, toilet, and vanity. Install new dual washer/ dryer(ventless) Date: August 3, 2016 Contractor: Shelly Madden Client: Shelly Madden | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1611315 | |||||
SCORE 72 Kitchen: pull and replace existing cabinetry, countertops, plumbing fixtures, and appliances master bath: expand into existing hall powder room. Build shower in existing bath tub location and frame in wall. Laundry: pull and replace existing cabinetry and appliances Date: June 1, 2015 Contractor: Orli Perez The Permit Lady Client: Gretchen Handwerger | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1508254 |