Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Romero used mh lot 4 Date: October 8, 2010 Permit status: Closed | Permit id: 10-05144 | |||||
SCORE 70 Romero used mh lot 4 Client: Romero Used Mh Lot 4 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05144 | Parcel: 6075 | |||||
SCORE 100 Romero used mh lot 4 Client: Romero Used Mh Lot 4 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05144 | Parcel: 6075 | |||||
September 11, 20 2:40:42 pm kneel. Romero - used mh lot 4 location: hendersonville rd to airport rd to wellington mhp on right.; october 8, 20 11:20:42 am kneel. Romero - used mh lot 4; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach ski Permit type: Permits - historical | Permit status: Closed | Permit id: 10-05144 | Parcel: 6075 | |||||
Romero used mh lot 4 Date: October 8, 2010 Value: $2,700 Permit type: Historical | Permit status: Closed | Permit id: 10-05144 | |||||
September 11, 20 2:40:42 pm kneel. Romero - used mh lot 4 location: hendersonville rd to airport rd to wellington mhp on right.; october 8, 20 11:20:42 am kneel. Romero - used mh lot 4; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach ski Date: October 8, 2010 Permit type: Permits - historical | Permit status: Closed | Permit id: 10-05144 | Parcel: 6075 |