Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
796 sqft detached finished garage w electrical for existing sfd. Date: April 22, 2015 Value: $31,091 Permit type: Building : 43 - res | Permit status: In review | Permit id: Pds2015-Resacc- | |||||
796 sqft detached finished garage w/ electrical for existing sfd. Date: April 22, 2015 Value: $31,091 Permit type: New residential acc structure | Permit status: Completed | Completion date: December 22, 2015 | Permit id: Pds2015-Resacc- | |||||
SCORE 99 796 sqft detached finished garage w electrical for existing sfd. Permit type: New residential acc structure | Permit status: Completed | Completion date: December 22, 2015 | Permit id: Pds2015-Resacc- | |||||
Final Date: December 18, 2015 Permit status: Pass | Permit id: Pds2015-Resacc- | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 23, 2014 Contractor: Daniel Sullivan Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: January 14, 2015 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 23, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 14, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 23, 2014 Contractor: Sullivan Solar Power Of California Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 14, 2015 | Permit id: Pds2014-Resalt- | |||||
Final Date: January 12, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Patrick Schmit Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: January 21, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Solar West Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 21, 2015 | Permit id: Pds2014-Resalt- | |||||
Final Date: January 19, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Patrick Schmit Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: January 21, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Solar West Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 21, 2015 | Permit id: Pds2014-Resalt- | |||||
Final Date: January 19, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Pete S Rive Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: January 9, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Solarcity Corporation Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 9, 2015 | Permit id: Pds2014-Resalt- | |||||
Final Date: January 8, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 17, 2014 Contractor: Tony Hickman Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: November 14, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 86 396 sf partial garage conversion to habitable and minor interior remodel to include 3 lf of interior partition with misc electrical and plumbing. 225a electrical service upgrade. Permit type: Building : 43 - res | Permit status: Permit finaled | Completion date: February 25, 2015 | Permit id: Pds2014-Resalt- | |||||
Existing residential main electrical service upgrade - 225 amps - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Date: December 17, 2014 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2014-Resalt- | |||||
SCORE 96 396 sf partial garage conversion to habitable and minor interior remodel to include 3 lf of interior partition with misc electrical and plumbing. 225a electrical service upgrade. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 25, 2015 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 27, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 14, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 27, 2014 Contractor: 3 Solar Energy Inc Permit type: Residential alteration-addn | Permit status: Issued invalid expired | Completion date: November 14, 2014 | Permit id: Pds2014-Resalt- | |||||
Final Date: February 24, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Final Date: November 12, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
5 pedestrian bridges within trail easement for "horse creek ridge"; see pds2014-cmaspc-000044 for all clearances. Bridge #1 = 3 sqft bridge #2 = 368 sqft bridge #3 = 4 sqft bridge #4 = 5 sqft bridge #5 = 344 sqft Date: October 8, 2014 Value: $277,070 Permit type: Other : 3311 - com - | Permit status: In review | Permit id: Pds2014-Cmaspc- | |||||
SCORE 96 5 pedestrian bridges within trail easement for "horse creek ridge"; see pds2014-cmaspc-000044 for all clearances. Bridge #1 = 3 sqft bridge #2 = 368 sqft bridge #3 = 4 sqft bridge #4 = 5 sqft bridge #5 = 344 sqft Permit type: Commercial multi-bldg parent | Permit status: Pc invalid expired | Permit id: Pds2014-Cmaspc- | |||||
SCORE 86 Ground mount residential solar pv with 400amp panel upgrade for existing sfd Date: October 1, 2014 Contractor: Phong Huynh Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: January 13, 2015 | Permit id: Pds2014-Resalt- | |||||
Ground mount residential solar pv with 400amp panel upgrade for existing sfd Date: October 1, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 13, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 96 Ground mount residential solar pv with 400amp panel upgrade for existing sfd Date: October 1, 2014 Contractor: Built Green California Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 13, 2015 | Permit id: Pds2014-Resalt- | |||||
Final Date: January 9, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Rough electric Date: November 6, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
2 office trailers 1 14 q ft and 2 - 9 sq ft (for existing project to replace aquaduct water pipes - s d county water authority Date: September 18, 2014 Permit type: Building : 11 - com | Permit status: Permit expired | Permit id: Pds2014-Compri- | |||||
SCORE 72 2 office trailers 1 14 q ft and 2 - 9 sq ft (for existing project to replace aquaduct water pipes - s d county water authority Date: September 18, 2014 Contractor: L H Woods And Sons Inc Permit type: New primary comm structure | Permit status: Issued expired | Permit id: Pds2014-Compri- | |||||
Combo frame Date: October 8, 2014 Permit status: Pass | Permit id: Pds2014-Compri- | |||||
444 sf addition of sfd (bath and sitting rm) Date: August 1, 2014 Value: $60,090 Permit type: Building : 43 - res | Permit status: Permit expired | Permit id: Pds2014-Resalt- | |||||
444 sf addition of sfd (bath and sitting rm) Date: August 1, 2014 Value: $60,090 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 29, 2016 | Permit id: Pds2014-Resalt- | |||||
Ground mount residential solar pv for existing sfd Date: April 29, 2016 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 444 sf addition of sfd (bath and sitting rm) Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 29, 2016 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Ground mount residential solar pv for existing sfd Date: April 29, 2016 Contractor: Solaire Energy Systems Inc Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2016-Resalt- | |||||
Final Date: May 9, 2016 Permit status: Fail | Permit id: Pds2016-Resalt- | |||||
Final Date: September 10, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Stormwater insp Date: December 16, 2014 Permit status: Monitor | Permit id: Pds2014-Resalt- | |||||
SCORE 96 New agg well meter Date: April 25, 2014 Contractor: Paul Stehly Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: February 24, 2015 | Permit id: Pds2014-Resalt- | |||||
New agg well meter Date: April 25, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 24, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 New agg well meter Date: April 25, 2014 Contractor: Stehly Brothers Drilling Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 24, 2015 | Permit id: Pds2014-Resalt- | |||||
Final Date: February 20, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
SCORE 96 New 100a agg meter Date: April 25, 2014 Contractor: Paul Stehly Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: May 29, 2014 | Permit id: Pds2014-Resalt- | |||||
New 100a agg meter Date: April 25, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 29, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 New 100a agg meter Date: April 25, 2014 Contractor: Stehly Brothers Drilling Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 29, 2014 | Permit id: Pds2014-Resalt- | |||||
Final Date: May 22, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
SCORE 86 Ground mount residential solar pv for existing sfd Date: February 21, 2014 Contractor: Betty Gomez Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: March 28, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 79 Panel upgrade 200a Date: November 22, 2013 Contractor: George Montello Permit type: Electrical : 80 - ac | Permit status: Permit issued | Permit id: Pds2013-Resalt- | |||||
SCORE 100 Panel upgrade 200a Date: November 22, 2013 Contractor: A S I Hastings Inc Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2013-Resalt- | |||||
SCORE 100 Ground mount residential solar pv for existing sfd Date: February 13, 2014 Contractor: A S I Hastings Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 28, 2014 | Permit id: Pds2014-Resalt- | |||||
Final Date: March 26, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
5 sqft detached aluminum patio cover for existing sfd Date: June 4, 2014 Value: $11,550 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: September 4, 2014 | Permit id: Pds2014-Resacc- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 13, 2013 Contractor: Tara S Morales Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: January 14, 2014 | Permit id: Pds2013-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 13, 2013 Contractor: Solarcity Corporation Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 14, 2014 | Permit id: Pds2013-Resalt- | |||||
SCORE 89 5 sqft detached aluminum patio cover for existing sfd Permit type: New residential acc structure | Permit status: Completed | Completion date: September 4, 2014 | Permit id: Pds2014-Resacc- | |||||
Final Date: August 3, 2005 Permit status: Pass | Permit id: Pds2004-1004-20 | |||||
Final Date: September 3, 2014 Permit status: Pass | Permit id: Pds2014-Resacc- | |||||
Final Date: July 26, 2007 Permit status: Pass | Permit id: Pds2007-1023-20 | |||||
Fico-- covert barn to 10 sqft 2nd dwelling unit and 408 sqft asbuilt addition to main sfd (includes spiral staircase and fireplace) non-fico 448 sqft new proposed addition to main sfd and convert existing 327 sqft carport to garage with 65 sqft addition w 200amp service. Date: December 10, 2013 Value: $219,921 Permit type: Building : 1014 - re | Permit status: Permit issued | Permit id: Pds2013-Resacc- | |||||
Fico-- covert barn to 10 sqft 2nd dwelling unit and 408 sqft asbuilt addition to main sfd (includes spiral staircase and fireplace) non-fico 448 sqft new proposed addition to main sfd and convert existing 327 sqft carport to garage with 65 sqft addition w 200amp service. 6-29-16 courtesy permit renewal per chris heidenreich. Must call for inspection within 1 days to keep permit active. Cdc Date: December 10, 2013 Value: $219,921 Permit type: New residential acc structure | Permit status: Issued | Permit id: Pds2013-Resacc- | |||||
Fico-- covert barn to 10 sqft 2nd dwelling unit and 408 sqft asbuilt addition to main sfd (includes spiral staircase and fireplace) non-fico 448 sqft new proposed addition to main sfd and convert existing 327 sqft carport to garage with 65 sqft addition w 200amp service. 6-29-16 courtesy permit renewal per chris heidenreich. Must call for inspection within 1 days to keep permit active. Cdc 9 26 2017 - permit renewed at 25%. Must call for a valid inspection showing progress within 1 days to keep permit active -rm Date: December 10, 2013 Value: $219,921 Permit type: New residential acc structure | Permit status: Issued | Permit id: Pds2013-Resacc- | |||||
Rough frame Date: January 9, 2017 Permit status: Fail | Permit id: Pds2013-Resacc- | |||||
Stormwater insp Date: July 18, 2016 Permit status: Monitor | Permit id: Pds2013-Resacc- | |||||
Stormwater insp Date: December 23, 2015 Permit status: Monitor | Permit id: Pds2013-Resacc- | |||||
Stormwater insp Date: December 24, 2014 Permit status: Monitor | Permit id: Pds2013-Resacc- | |||||
Roof mount residential solar pv for existing sfd (on 2nd du) per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 9, 2013 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: April 16, 2014 | Permit id: Pds2013-Resalt- | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (on 2nd du) per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 9, 2013 Contractor: Pacific Sun Technologies Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 16, 2014 | Permit id: Pds2013-Resalt- | |||||
Final Date: April 10, 2014 Permit status: Pass | Permit id: Pds2013-Resalt- | |||||
6 sqft detached 2nd dwelling unit with 1 amps Date: December 3, 2013 Value: $81,204 Permit type: Building : 1014 - re | Permit status: Permit finaled | Completion date: June 10, 2014 | Permit id: Pds2013-Resacc- | |||||
Final Date: June 6, 2014 Permit status: Pass | Permit id: Pds2013-Resacc- | |||||
SCORE 86 735 sqft 2nd dwelling unit (m h 433a - spa 112-1f) and 262 sqft as-built addition to main sfd 10 31 14-one time 6 months plan check extension. Plan check is valid until 4 29 2015--lv 02. 06. 2014: plan change to add as-built addition to main sfd, sqft change to 2nd d. U.... Lhg Permit type: Building : 1014 - re | Permit status: Permit finaled | Completion date: April 23, 2015 | Permit id: Pds2013-Resacc- | |||||
735 sqft 2nd dwelling unit (m/h 433a - spa 112-1f) and 262 sqft as-built addition to main sfd 10/31/14-one time 6 months plan check extension. Plan check is valid until 4/29/2015--lv 02. 06. 2014 plan change to add as-built addition to main sfd, sqft change to 2nd d. U.... Lhg Date: October 29, 2013 Value: $110,068 Permit type: New residential acc structure | Permit status: Completed | Completion date: April 23, 2015 | Permit id: Pds2013-Resacc- | |||||
SCORE 96 735 sqft 2nd dwelling unit (m h 433a - spa 112-1f) and 262 sqft as-built addition to main sfd 10 31 14-one time 6 months plan check extension. Plan check is valid until 4 29 2015--lv 02. 06. 2014 plan change to add as-built addition to main sfd, sqft change to 2nd d. U.... Lhg Permit type: New residential acc structure | Permit status: Completed | Completion date: April 23, 2015 | Permit id: Pds2013-Resacc- | |||||
Final Date: April 21, 2015 Permit status: Pass | Permit id: Pds2013-Resacc- | |||||
Stormwater insp Date: November 10, 2014 Permit status: Monitor | Permit id: Pds2013-Resacc- | |||||
4011 sq ft sfd w ac, fs, 632 att fin fs garage . 778 sq ft of decks and 422 sq ft open courtyard. Detached 2nd dwelling unit 1198 sq ft w ac, fswith att 284 sq ft fin garage 2 amp service for main house and 1 amp for 2nd dwelling. . Address for 2nd d. U. Is 318 villa del cielo dr 1-15-2014 - plan change increased size of house by converted proposed garage workshop to habitable space see c of a van Date: October 11, 2013 Value: $764,105 Permit type: Building : 10 - res | Permit status: Permit expired | Permit id: Pds2013-Respri- | |||||
4011 sq ft sfd w ac, fs, 632 att fin fs garage . 303 sq ft of decks and 422 sq ft open courtyard. Detached 2nd dwelling unit 1198 sq ft w/ac, fswith att 284 sq ft fin garage, lower patio roofs, 2 amp service for main house and 1 amp for 2nd dwelling. . 11-03-15 plan change decreased sqft of deck... See coa tlh 10-09-15 plan change structural only... See coa tlh 09-10-15 one-time only courtesy renewal per c. H... Must call for a valid inspection within 1 days... Tlh 1-15-2014 - plan change increased size of house by converted proposed garage/workshop to habitable space see c of a van address for 2nd d. U. Is 318 villa del cielo dr Date: October 11, 2013 Value: $749,855 Permit type: New primary residential sfd-mh | Permit status: Issued | Permit id: Pds2013-Respri- | |||||
4011 sq ft sfd w ac, fs, 632 att fin fs garage . 303 sq ft of decks and 422 sq ft open courtyard. Detached 2nd dwelling unit 1198 sq ft w ac, fswith att 284 sq ft fin garage, lower patio roofs, 2 amp service for main house and 1 amp for 2nd dwelling. . 11-03-15 plan change decreased sqft of deck... See coa tlh 10-09-15 plan change structural only... See coa tlh 09-10-15 one-time only courtesy renewal per c. H... Must call for a valid inspection within 1 days... Tlh 1-15-2014 - plan change increased size of house by converted proposed garage workshop to habitable space see c of a van address for 2nd d. U. Is 318 villa del cielo dr Date: October 11, 2013 Value: $749,855 Permit type: New primary residential sfd-mh | Permit status: Issued expired | Permit id: Pds2013-Respri- | |||||
Final Date: March 2, 2017 Permit status: Pass | Permit id: Pds2013-Respri- | |||||
Stormwater insp Date: September 12, 2016 Permit status: Monitor | Permit id: Pds2013-Respri- | |||||
Stormwater insp Date: November 9, 2015 Permit status: Monitor | Permit id: Pds2013-Respri- | |||||
Stormwater insp Date: November 17, 2014 Permit status: Monitor | Permit id: Pds2013-Respri- | |||||
Building site inspection Date: November 14, 2013 Permit status: Done | Permit id: Pds2013-Respri- | |||||
1 amp meter pedestal for at&t excavation permit #dpw2013-rwexcp-00503 encroachment permit #dpw2013-rwencp-00271 Date: October 1, 2013 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: January 23, 2014 | Permit id: Pds2013-Comalt- | |||||
Final Date: January 21, 2014 Permit status: Pass | Permit id: Pds2013-Comalt- | |||||
16 sf single story sfd, 2 amp 8 27 14 plan check extension - must issue w in 6 months of plancheck expiration date (2 06 15)... Djm 2 21 2014 plan change. Added sqft. See c of a... Ss Date: August 6, 2013 Value: $228,724 Permit type: Building : 10 - res | Permit status: Permit expired | Permit id: Pds2013-Respri- | |||||
1014 sqft detached 2nd dwelling unit above 4 sqft attached garage Date: July 26, 2013 Value: $155,983 Permit type: Building : 1014 - re | Permit status: Permit finaled | Completion date: February 4, 2015 | Permit id: Pds2013-Resacc- | |||||
1014 sqft detached 2nd dwelling unit above 4 sqft attached garage Date: July 26, 2013 Value: $155,983 Permit type: New residential acc structure | Permit status: Completed | Completion date: February 4, 2015 | Permit id: Pds2013-Resacc- | |||||
Final Date: February 2, 2015 Permit status: Pass | Permit id: Pds2013-Resacc- | |||||
Stormwater insp Date: December 2, 2014 Permit status: Monitor | Permit id: Pds2013-Resacc- | |||||
1 amp meter pedestal for at&t for address 1312 green canyon rd excavation dpw 2013rwexcp 00275. Encroachment dpw2013rwewcp 00150. Date: June 5, 2013 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: November 12, 2013 | Permit id: Pds2013-Comalt- | |||||
Final Date: November 7, 2013 Permit status: Pass | Permit id: Pds2013-Comalt- | |||||
6 sf roof restructure, 1026 sf exterior siding, 57 sf window sliding door replacement and remodel to change existing guest house to 2nd dwelling (address 2205 gum tree) and 150amp upgrade. 7 25 13: plan change - strl only - see c of a... M1a main address is 2203 your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: May 29, 2013 Value: $35,312 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: October 9, 2013 | Permit id: Pds2013-Resalt- | |||||
6 sf roof restructure, 1026 sf exterior siding, 57 sf window/sliding door replacement and remodel to change existing guest house to 2nd dwelling (address 2205 gum tree) and 150amp upgrade. 7/25/13 plan change - strl only - see c of a... M1a main address is 2203 your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: May 29, 2013 Value: $35,312 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 9, 2013 | Permit id: Pds2013-Resalt- | |||||
464 sf carport for existing sfd Date: October 21, 2013 Value: $10,672 Permit type: Building : 4362 - re | Permit status: Permit finaled | Completion date: November 1, 2013 | Permit id: Pds2013-Resacc- | |||||
Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 26, 2013 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: October 3, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 86 2514 sqft 1-story sfd, with 883 sqft attached garage, 445 sqft patio covers, 225 amp, 667 sqft attached 2nd dwelling unit with 1 amps and temp power customer advised sdg&e usually wants 2 separate meters notice to permittee: temp power shall be inspected prior to framing inspection note: 2nd du using : 533 oak glade dr. Permit type: Building : 10 - res | Permit status: Permit finaled | Completion date: September 25, 2013 | Permit id: Pds2013-Respri- | |||||
SCORE 86 Grading for p c pds2013-respri-000082 (2514 sqft 1-story sfd, with 883 sqft attached garage, 445 sqft patio covers, 667 sqft attached 2nd dwelling unit with 1 amps note: 2nd du using : 533 oak glade dr. Date: April 20, 2013 Contractor: Mike Amos Permit type: Building : 10 - res | Permit status: Permit finaled | Completion date: May 29, 2013 | Permit id: Pds2013-Resgrd- | |||||
464 sf carport for existing sfd Date: October 21, 2013 Value: $10,672 Permit type: New residential acc structure | Permit status: Completed | Completion date: November 1, 2013 | Permit id: Pds2013-Resacc- | |||||
2514 sqft 1-story sfd, with 883 sqft attached garage, 445 sqft patio covers, 225 amp, 667 sqft attached 2nd dwelling unit with 1 amps and temp power customer advised sdg&e usually wants 2 separate meters notice to permittee temp power shall be inspected prior to framing inspection note 2nd du using 533 oak glade dr. Date: April 20, 2013 Value: $474,351 Permit type: New primary residential sfd-mh | Permit status: Completed | Completion date: September 25, 2013 | Permit id: Pds2013-Respri- | |||||
Grading for p/c pds2013-respri-000082 (2514 sqft 1-story sfd, with 883 sqft attached garage, 445 sqft patio covers, 667 sqft attached 2nd dwelling unit with 1 amps note 2nd du using 533 oak glade dr. Date: April 20, 2013 Permit type: Pds residential minor grading | Permit status: Completed | Completion date: May 29, 2013 | Permit id: Pds2013-Resgrd- | |||||
SCORE 74 464 sf carport for existing sfd Permit type: New residential acc structure | Permit status: Completed | Completion date: November 1, 2013 | Permit id: Pds2013-Resacc- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 26, 2013 Contractor: 3 Solar Energy Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 3, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 2514 sqft 1-story sfd, with 883 sqft attached garage, 445 sqft patio covers, 225 amp, 667 sqft attached 2nd dwelling unit with 1 amps and temp power customer advised sdg&e usually wants 2 separate meters notice to permittee temp power shall be inspected prior to framing inspection note 2nd du using 533 oak glade dr. Permit type: New primary residential sfd-mh | Permit status: Completed | Completion date: September 25, 2013 | Permit id: Pds2013-Respri- | |||||
SCORE 96 Grading for p c pds2013-respri-000082 (2514 sqft 1-story sfd, with 883 sqft attached garage, 445 sqft patio covers, 667 sqft attached 2nd dwelling unit with 1 amps note 2nd du using 533 oak glade dr. Date: April 20, 2013 Contractor: M L A General Contractor Inc Permit type: Pds residential minor grading | Permit status: Completed | Completion date: May 29, 2013 | Permit id: Pds2013-Resgrd- | |||||
Final Date: October 31, 2013 Permit status: Pass | Permit id: Pds2013-Resacc- | |||||
At&t v-rad cabinet with 1 amp service, generator ports only no batteries Date: April 19, 2013 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: April 28, 2013 | Permit id: Pds2013-Comalt- | |||||
SCORE 64 At&t v-rad cabinet with 1 amp service, generator ports only no batteries Date: April 19, 2013 Contractor: So Cal Construction And Consulting Service Inc Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: April 28, 2013 | Permit id: Pds2013-Comalt- | |||||
Final Date: April 28, 2013 Permit status: Pass | Permit id: Pds2013-Comalt- | |||||
1 amps meter pedestal for at&t in road right-away Date: January 30, 2013 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: May 17, 2013 | Permit id: Pds2013-Resalt- | |||||
Final Date: May 16, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- | |||||
1 amp meter pedestal for at&t excavation # dpw2013-rwexcp-00024 encroachment #dpw2013-rwencp-00006 Date: January 25, 2013 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: April 28, 2013 | Permit id: Pds2013-Comacc- | |||||
1 amp meter pedestal for at&t excavation permit: dpw2012-rwexcp-00024 encroachment permit: dpw2012-rwencp-00010 Date: December 14, 2012 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: June 20, 2013 | Permit id: Pds2012-Comalt- | |||||
1 amp meter pedestal for at&t excavation permit dpw2012-rwexcp-00024 encroachment permit dpw2012-rwencp-00010 Date: December 14, 2012 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: June 20, 2013 | Permit id: Pds2012-Comalt- | |||||
Final Date: June 18, 2013 Permit status: Pass | Permit id: Pds2012-Comalt- | |||||
All structures as-built -1031 sf mh as 2nd dwelling on piers, 1 amp, 494 sf garage conversion, (bdrm livrm) to main dwelling, and 12 sf barn (form 2) 2nd dwelling is 9172 and main house is 91 huntly rd 05. 17. 2013: reduced sqft due to correction on floor plan from 1039 to 1031 sqft... Lhg Date: December 3, 2012 Value: $251,938 Permit type: Building : 1014 - re | Permit status: Application expired | Completion date: October 9, 2013 | Permit id: Pds2012-Resacc- | |||||
All structures as-built -1031 sf mh as 2nd dwelling on piers, 1 amp, 494 sf garage conversion, (bdrm/livrm) to main dwelling, and 12 sf barn (form 2) 2nd dwelling is 9172 and main house is 91 huntly rd 05. 17. 2013 reduced sqft due to correction on floor plan from 1039 to 1031 sqft... Lhg Date: December 3, 2012 Value: $251,938 Permit type: New residential acc structure | Permit status: Pc expired | Completion date: October 9, 2013 | Permit id: Pds2012-Resacc- | |||||
All structures as-built -1031 sf mh as 2nd dwelling on piers, 1 amp, 494 sf garage conversion, (bdrm livrm) to main dwelling, and 12 sf barn (form 2) 2nd dwelling is 9172 and main house is 91 huntly rd 05. 17. 2013 reduced sqft due to correction on floor plan from 1039 to 1031 sqft... Lhg Date: December 3, 2012 Value: $251,938 Permit type: New residential acc structure | Permit status: Pc expired | Completion date: October 9, 2013 | Permit id: Pds2012-Resacc- | |||||
Final Date: October 2, 2013 Permit status: Pass | Permit id: Pds2012-Resacc- | |||||
Park name: rancho monserate park i. D. No. 37- 0834 space no.: parksite map ref: 1048-h3 h4 community: fallbrook description: misc electrical for parksite. 02. 28. 2013: permit renewal good for 6 months... Lhg note to permittee: once this permit is issued it will be valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: May 7, 2012 Permit type: Other : 1152 - m. H. P | Permit status: Permit finaled | Completion date: April 8, 2013 | Permit id: Pds2012-1035-20 | |||||
Park name: rancho monserate park i. D. No. 37- 0834 space no.: parksite map ref: 1048-h3/h4 community: fallbrook description: misc electrical for parksite. 02. 28. 2013: permit renewal good for 6 months... Lhg note to permittee: once this permit is issued it will be valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: May 7, 2012 Permit type: Construction in a mh park | Permit status: Completed | Completion date: April 8, 2013 | Permit id: Pds2012-1035-20 | |||||
SCORE 59 Park name: rancho monserate park i. D. No. 37- 0834 space no.: parksite map ref: 1048-h3 h4 community: fallbrook description: misc electrical for parksite. 02. 28. 2013: permit renewal good for 6 months... Lhg note to permittee: once this permit is issued it will be valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: May 7, 2012 Contractor: Precision Power Solutions Inc Permit type: Construction in a mh park | Permit status: Completed | Completion date: April 8, 2013 | Permit id: Pds2012-1035-20 | |||||
Final Date: April 4, 2013 Permit status: Pass | Permit id: Pds2012-1035-20 | |||||
Foundation/steel/holdowns/abs/2nd Date: September 26, 2012 Permit status: Pass | Permit id: Pds2012-1035-20 | |||||
Hra-- 58 sqft reroof (same clay tile relay felt) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: April 3, 2012 Value: $26,680 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: June 14, 2012 | Permit id: Pds2012-1030-20 | |||||
-- 58 sqft reroof (same clay tile relay felt) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: April 3, 2012 Value: $26,680 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 14, 2012 | Permit id: Pds2012-1030-20 | |||||
SCORE 89 -- 58 sqft reroof (same clay tile relay felt) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 14, 2012 | Permit id: Pds2012-1030-20 | |||||
Final Date: June 12, 2012 Permit status: Pass | Permit id: Pds2012-1030-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - building d- roof mount commercial solar pv no. Of modules: 46 no. Of inverters: 4 total system size in kilowatts: 10 6-14-2012 - plan change reduced panel count by 16 and inverter by 2 see c of a 5-2-2012 inscreased solar module count on roof from 43 to 46 see 1016-20110008 for all clearances and fees. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv carport 3 bldgd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - building d- roof mount commercial solar pv no. Of modules 46 no. Of inverters 4 total system size in kilowatts 6-14-2012 - plan change reduced panel count by 16 and inverter by 2 see c of a 5-2-2012 inscreased solar module count on roof from 43 to 46 see 1016-20110008 for all clearances and fees. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv carport 3 bldgd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 3 bldg d-645 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 15, 2011 Value: $14,577 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: May 10, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 3 bldg d-645 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 15, 2011 Value: $14,577 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 10, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs e carport 4 no. Of modules: 180 no. Of inverters: 5, total system size in kilowatts: 35 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs e carport 4 no. Of modules 1 no. Of inverters 5, total system size in kilowatts 35 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs f & g, carport 5 no. Of modules: 188 no. Of inverters: 6 total system size in kilowatts: 38 5-2-2012 reduced modules from 198 to 188, reduced string county on inverter #1 & 4, increased subpenl breaker size, adjusted conduit size accordingly. See 1016-20110008 for all clearances and fees. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs f & g, carport 5 no. Of modules 188 no. Of inverters 6 total system size in kilowatts 38 5-2-2012 reduced modules from 198 to 188, reduced string county on inverter #1 & 4, increased subpenl breaker size, adjusted conduit size accordingly. See 1016-20110008 for all clearances and fees. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs j carport 7 no. Of modules: 90 no. Of inverters: 3 total system size in kilowatts: 18 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: July 9, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs j carport 7 no. Of modules no. Of inverters 3 total system size in kilowatts 18 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 9, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv on carport 2 serving building l & m no. Of modules: 84 no. Of inverters: 2 total system size in kilowatts: 12 5-21-2012 plan change increased subpanel breaker size, and utility disconnect ssize, adjusted conduit and wire size according, increased panel count 63-84 see 1016-20110008 for all clearances and fees. Vam. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv on carport 2 serving building l & m no. Of modules 84 no. Of inverters 2 total system size in kilowatts 12 5-21-2012 plan change increased subpanel breaker size, and utility disconnect ssize, adjusted conduit and wire size according, increased panel count 63-84 see 1016-20110008 for all clearances and fees. Vam. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 2- for m & l-1504 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 15, 2011 Value: $33,990 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: May 15, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 6 bldg h - 1337 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 15, 2011 Value: $30,216 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: July 10, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 7 bldg j -1613 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 15, 2011 Value: $36,453 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: July 10, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 7 bldg j -1613 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 15, 2011 Value: $36,453 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 10, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport #4 bldg e-3224 sf, your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 15, 2011 Value: $72,862 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: May 15, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport #4 bldg e-3224 sf, your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: December 15, 2011 Value: $72,862 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 15, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 1 bldg b-2077 sq ft, 4 20 12: plan change -- strl only; see c of a... Vmt 3 7 12: plan change -- strl only; see c of a... Vmt Date: December 15, 2011 Value: $46,940 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: May 9, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv on carport 1 serving bldg b no. Of modules: 116, no. Of inverters: 4, total system size in kilowatts: 22 5-2-2012 plan change reduced main breaker, misc electrical and increased module count vam. See c of a see 1016-20110008 for all sign offs and fees for plan change per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 1 bldg b-2077 sq ft, 4/20/12 plan change -- strl only; see c of a... Vmt 3/7/12 plan change -- strl only; see c of a... Vmt Date: December 15, 2011 Value: $46,940 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 9, 2012 | Permit id: Pds2011-1019-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv on carport 1 serving bldg b no. Of modules 116, no. Of inverters 4, total system size in kilowatts 22 5-2-2012 plan change reduced main breaker, misc electrical and increased module count vam. See c of a see 1016-20110008 for all sign offs and fees for plan change per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: July 10, 2012 | Permit id: Pds2011-1031-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 1-2077 sq ft, roof mount commercial solar pv no. Of modules: 113, no. Of inverters: 4, total system size in kilowatts: 22 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool ro Date: December 1, 2011 Value: $46,940 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: December 15, 2011 | Permit id: Pds2011-1017-20 | |||||
7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 1-2077 sq ft, roof mount commercial solar pv no. Of modules 113, no. Of inverters 4, total system size in kilowatts 22 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool ro Date: December 1, 2011 Value: $46,940 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: December 15, 2011 | Permit id: Pds2011-1017-20 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 1-2077 sq ft, roof mount commercial solar pv no. Of modules 113, no. Of inverters 4, total system size in kilowatts 22 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool ro Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: December 15, 2011 | Permit id: Pds2011-1017-20 | |||||
Park name: valley oaks trailer ranch park i. D. No. 37- 0265 space no.: club house map ref:1028-f4 community: fallbrook description: ac replacement for existing club house. Note to permittee: once this permit is issued it will be valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. 7 10 12: permit renewed for 6 months until 11-jan-2013. No fee to renew permit per brad from state of california. 1srs Date: September 8, 2011 Permit type: Other : 1152 - m. H. P | Permit status: Permit finaled | Completion date: November 16, 2012 | Permit id: Pds2011-1035-20 | |||||
SCORE 93 Park name: valley oaks trailer ranch park i. D. No. 37- 0265 space no.: club house map ref:1028-f4 community: fallbrook description: ac replacement for existing club house. Note to permittee: once this permit is issued it will be valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. 7/10/12: permit renewed for 6 months until 11-jan-2013. No fee to renew permit per brad from state of california. 1srs Date: September 8, 2011 Contractor: Fallbrook Heating And A C Permit type: Construction in a mh park | Permit status: Completed | Completion date: November 16, 2012 | Permit id: Pds2011-1035-20 | |||||
Final Date: November 15, 2012 Permit status: Pass | Permit id: Pds2011-1035-20 | |||||
Final Date: October 25, 2011 Permit status: Fail | Permit id: Pds2011-1035-20 | |||||
Grading for plan check #1001-20110051 (10 sqft sfd w ac & fs, 242 sqft attached finished garage w fs, hra 57 sqft patio cover, 2 amps and temp power) Date: February 2, 2011 Value: $139,900 Permit type: Building : 10 - res | Permit status: Permit finaled | Completion date: August 26, 2011 | Permit id: Pds2011-1026-20 | |||||
10 sqft sfd w ac & fs, 242 sqft attached finished garage w fs, hra 57 sqft patio cover, 2 amps and temp power notice to permittee: temp power shall be inspected prior to framing inspection 01. 02. 2014: packet purged... Lhg Date: January 31, 2011 Value: $139,900 Permit type: Building : 10 - res | Permit status: Application expired | Permit id: Pds2011-1001-20 | |||||
Grading for plan check #1001-20110051 (10 sqft sfd w/ ac & fs, 242 sqft attached finished garage w/fs, 57 sqft patio cover, 2 amps and temp power) Date: February 2, 2011 Value: $139,900 Permit type: Pds residential minor grading | Permit status: Completed | Completion date: August 26, 2011 | Permit id: Pds2011-1026-20 | |||||
10 sqft sfd w/ ac & fs, 242 sqft attached finished garage w/fs, 57 sqft patio cover, 2 amps and temp power notice to permittee temp power shall be inspected prior to framing inspection 01. 02. 2014 packet purged... Lhg Date: January 31, 2011 Value: $139,900 Permit type: New primary residential sfd-mh | Permit status: Pc expired | Permit id: Pds2011-1001-20 | |||||
SCORE 99 Grading for plan check #1001-20110051 (10 sqft sfd w ac & fs, 242 sqft attached finished garage w fs, 57 sqft patio cover, 2 amps and temp power) Permit type: Pds residential minor grading | Permit status: Completed | Completion date: August 26, 2011 | Permit id: Pds2011-1026-20 | |||||
SCORE 99 10 sqft sfd w ac & fs, 242 sqft attached finished garage w fs, 57 sqft patio cover, 2 amps and temp power notice to permittee temp power shall be inspected prior to framing inspection 01. 02. 2014 packet purged... Lhg Permit type: New primary residential sfd-mh | Permit status: Pc expired | Permit id: Pds2011-1001-20 | |||||
Rough grading Date: August 26, 2011 Permit status: Pass | Permit id: Pds2011-1026-20 | |||||
Park name: valley oak park park i. D. No. 37-0265 space no.: 214-216 map ref: 1028-f4 community: fallbrook description: 2007 fire rebuild create 3 spaces (#new 214, 215 and 216) in the area where the managers stick built sfd was originally located also adding 1 new meter note to permittee: this permit is valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: July 21, 2010 Permit type: Other : 1152 - m. H. P | Permit status: Permit finaled | Completion date: November 29, 2010 | Permit id: Pds2010-1035-20 | |||||
Final Date: November 29, 2010 Permit status: Pass | Permit id: Pds2010-1035-20 | |||||
Final Date: May 22, 2009 Permit status: Pass | Permit id: Pds2009-1019-20 | |||||
Final Date: August 6, 2008 Permit status: Pass | Permit id: Pds2008-1035-20 | |||||
`verizon wireless cell site mod as follows - 3 new panel antennas to replace 3 existing panel antennas. 2 new 6x12 hybrid power fiber cables, 1 new fiber power demarcation box and 1 new fiber demarcation rack mount, 3 new rrus one new baseband unit and 1 rack mount module Date: July 25, 2014 Value: $15,000 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: April 24, 2015 | Permit id: Pds2014-Comalt- | |||||
Cell site modification for at&t -- install 2 purcell cabinets (stacked), install 1 power cabinet, install 6 antennas w socks, install 12 rrus-11 for lte, install 2 dc surge suppressors, install 1 at&t gps antenna, install dc & fiber cables, install cable tray. Date: January 22, 2013 Value: $50,000 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: May 4, 2013 | Permit id: Pds2013-Comalt- | |||||
SCORE 61 Installation of 12 antennas on existing vista towers mono-broadleaf tower, 2 ground mount ac units, 1 standby generator & new equipment inside existing enclosure w new 2 amp service for verizon wireless Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: November 29, 2010 | Permit id: Pds2010-1019-20 | |||||
Cell site consisting of: installation of 12 panel anteneas and 24 tmas on existing mono broadleaf tree, 4 outdoor equipment cabinets on new concrete pad, new 2 amp service for at&t mobility. 7 9 10: plan change -- strl only; see c of a... Vmt Date: June 8, 2010 Value: $50,000 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: October 20, 2010 | Permit id: Pds2010-1019-20 | |||||
Installation of a multi-carrier communications facility including with tall mono-broadleaf tower, 182 sqft wall enclosure for future standby generator, 224 sqft cmu equipment shelter with 6 amp bussed gutter w 3 future meter positions inside new 2503 sqft cmu enclosure for vista towers. Date: May 12, 2010 Value: $100,000 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: September 24, 2010 | Permit id: Pds2010-1019-20 | |||||
Cell site consisting of: installation of 12 panel anteneas and 24 tmas on existing mono broadleaf tree, 4 outdoor equipment cabinets on new concrete pad, new 2 amp service for at&t mobility. Date: March 22, 2010 Value: $50,000 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: June 8, 2010 | Permit id: Pds2010-1017-20 | |||||
SCORE 61 Installation of 12 antennas on existing vista towers mono-broadleaf tower, 2 ground mount ac units, 1 standby generator & new equipment inside existing enclosure w new 2 amp service for verizon wireless Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: September 17, 2010 | Permit id: Pds2010-1017-20 | |||||
Installation of a multi-carrier communications facility including with tall mono-broadleaf tower, 182 sqft wall enclosure for future standby generator, 224 sqft cmu equipment shelter with 6 amp bussed gutter w 3 future meter positions inside new 2503 sqft cmu enclosure for vista towers. Date: February 10, 2010 Value: $100,000 Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: May 12, 2010 | Permit id: Pds2010-1017-20 | |||||
`verizon wireless cell site mod as follows - 3 new panel antennas to replace 3 existing panel antennas. 2 new 6x12 hybrid power/fiber cables, 1 new fiber/power demarcation box and 1 new fiber demarcation rack mount, 3 new rrus one new baseband unit and 1 rack mount module Date: July 25, 2014 Value: $15,000 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: April 24, 2015 | Permit id: Pds2014-Comalt- | |||||
Cell site modification for at&t -- install 2 purcell cabinets (stacked), install 1 power cabinet, install 6 antennas w/ socks, install 12 rrus-11 for lte, install 2 dc surge suppressors, install 1 at&t gps antenna, install dc & fiber cables, install cable tray. Date: January 22, 2013 Value: $50,000 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 4, 2013 | Permit id: Pds2013-Comalt- | |||||
SCORE 100 Cell site consisting of installation of 12 panel anteneas and 24 tmas on existing mono broadleaf tree, 4 outdoor equipment cabinets on new concrete pad, new 2 amp service for at&t mobility. Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: June 8, 2010 | Permit id: Pds2010-1017-20 | |||||
Installation of a multi-carrier communications facility including with tall mono-broadleaf tower, 182 sqft wall enclosure for future standby generator, 224 sqft cmu equipment shelter with 6 amp bussed gutter w/3 future meter positions inside new 2503 sqft cmu enclosure for vista towers. Date: February 10, 2010 Value: $100,000 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 12, 2010 | Permit id: Pds2010-1017-20 | |||||
Installation of a multi-carrier communications facility including with tall mono-broadleaf tower, 182 sqft wall enclosure for future standby generator, 224 sqft cmu equipment shelter with 6 amp bussed gutter w/3 future meter positions inside new 2503 sqft cmu enclosure for vista towers. Date: May 12, 2010 Value: $100,000 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: September 24, 2010 | Permit id: Pds2010-1019-20 | |||||
Cell site modification for verizon wireless -- replace 3 antennas, install 1 dc-6 squid surge suppressor, install 1 raycap, install 3 rrus. 5-2-2016 vicky m has the hazmat/gnatcatcher referral slip at her desk vam Date: December 9, 2015 Value: $18,000 Permit type: Commercial alteration-addn | Permit status: Issued | Permit id: Pds2015-Comalt- | |||||
SCORE 95 `verizon wireless cell site mod as follows - 3 new panel antennas to replace 3 existing panel antennas. 2 new 6x12 hybrid power fiber cables, 1 new fiber power demarcation box and 1 new fiber demarcation rack mount, 3 new rrus one new baseband unit and 1 rack mount module Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: April 24, 2015 | Permit id: Pds2014-Comalt- | |||||
SCORE 96 Cell site modification for at&t -- install 2 purcell cabinets (stacked), install 1 power cabinet, install 6 antennas w socks, install 12 rrus-11 for lte, install 2 dc surge suppressors, install 1 at&t gps antenna, install dc & fiber cables, install cable tray. Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 4, 2013 | Permit id: Pds2013-Comalt- | |||||
SCORE 87 Installation of a multi-carrier communications facility including with tall mono-broadleaf tower, 182 sqft wall enclosure for future standby generator, 224 sqft cmu equipment shelter with 6 amp bussed gutter w 3 future meter positions inside new 2503 sqft cmu enclosure for vista towers. Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 12, 2010 | Permit id: Pds2010-1017-20 | |||||
SCORE 84 Cell site mod for at&t as follows - remove and replace (3) antennas - install (3) rrus - install (3) filters - install (1) surge protector - install (1) gps antenna - install (1) rectifier in (e) power plant - install (1) rbs6601 with dus-41 in (e) umts purcell cabinet - install (1) dc power cable trunk and (1) fiber cable trunk Permit type: Commercial alteration-addn | Permit status: Issued | Permit id: Pds2016-Comalt- | |||||
SCORE 87 Installation of a multi-carrier communications facility including with tall mono-broadleaf tower, 182 sqft wall enclosure for future standby generator, 224 sqft cmu equipment shelter with 6 amp bussed gutter w 3 future meter positions inside new 2503 sqft cmu enclosure for vista towers. Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: September 24, 2010 | Permit id: Pds2010-1019-20 | |||||
SCORE 93 Cell site modification for verizon wireless -- replace 3 antennas, install 1 dc-6 squid surge suppressor, install 1 raycap, install 3 rrus. 5-2-2016 vicky m has the hazmat gnatcatcher referral slip at her desk vam Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: October 26, 2016 | Permit id: Pds2015-Comalt- | |||||
SCORE 99 Installation of 12 antennas on existing vista towers mono-broadleaf tower, 2 ground mount ac units, 1 standby generator & new equipment inside existing enclosure w/ new 2 amp service for verizon wireless Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: November 29, 2010 | Permit id: Pds2010-1019-20 | |||||
SCORE 100 Cell site consisting of installation of 12 panel anteneas and 24 tmas on existing mono broadleaf tree, 4 outdoor equipment cabinets on new concrete pad, new 2 amp service for at&t mobility. 7/9/10 plan change -- strl only; see c of a... Vmt Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: October 20, 2010 | Permit id: Pds2010-1019-20 | |||||
SCORE 99 Installation of 12 antennas on existing vista towers mono-broadleaf tower, 2 ground mount ac units, 1 standby generator & new equipment inside existing enclosure w/ new 2 amp service for verizon wireless Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: September 17, 2010 | Permit id: Pds2010-1017-20 | |||||
Final Date: October 19, 2016 Permit status: Pass | Permit id: Pds2015-Comalt- | |||||
Final Date: April 21, 2015 Permit status: Pass | Permit id: Pds2014-Comalt- | |||||
Final Date: May 1, 2013 Permit status: Pass | Permit id: Pds2013-Comalt- | |||||
Final Date: November 29, 2010 Permit status: Pass | Permit id: Pds2010-1019-20 | |||||
1 amp meter for at&t california n-5270, e-88308 Date: February 8, 2010 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: May 11, 2010 | Permit id: Pds2010-1007-20 | |||||
Final Date: May 7, 2010 Permit status: Pass | Permit id: Pds2010-1007-20 | |||||
1831. 5 sq. Ft. Retaining wall Date: May 13, 2015 Value: $67,747 Permit type: Other : 3313 - acc - | Permit status: Permit issued | Permit id: Pds2015-Resacc- | |||||
1831. 5 sq. Ft. Retaining wall Date: May 13, 2015 Value: $67,747 Permit type: New residential acc structure | Permit status: Issued expired | Permit id: Pds2015-Resacc- | |||||
SCORE 96 1831. 5 sq. Ft. Retaining wall Permit type: New residential acc structure | Permit status: Issued expired | Permit id: Pds2015-Resacc- | |||||
Water proofing Date: July 7, 2015 Permit status: Pass | Permit id: Pds2015-Resacc- | |||||
10 sf 2nd d. U. Mh on permanent fnd (spa 92-2f)with 4 sf det. Garage and 200amp. 1 13 15 - plan change - foundation plan - see c of a - mfv Date: September 24, 2014 Value: $192,182 Permit type: Building : 1014 - re | Permit status: Permit finaled | Completion date: June 12, 2015 | Permit id: Pds2014-Resacc- | |||||
10 sf 2nd d. U. Mh on permanent fnd (spa 92-2f)with 4 sf det. Garage and 200amp. 1/13/15 - plan change - foundation plan - see c of a - mfv Date: September 24, 2014 Value: $192,182 Permit type: New residential acc structure | Permit status: Completed | Completion date: June 12, 2015 | Permit id: Pds2014-Resacc- | |||||
SCORE 99 10 sf 2nd d. U. Mh on permanent fnd (spa 92-2f)with 4 sf det. Garage and 200amp. 1 13 15 - plan change - foundation plan - see c of a - mfv Permit type: New residential acc structure | Permit status: Completed | Completion date: June 12, 2015 | Permit id: Pds2014-Resacc- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 2, 2017 Contractor: Solarcity Corporation Permit type: Addn | Permit status: Completed | Completion date: October 18, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: June 10, 2015 Permit status: Pass | Permit id: Pds2014-Resacc- | |||||
Stormwater insp Date: November 6, 2014 Permit status: Monitor | Permit id: Pds2014-Resacc- | |||||
As-built 1162 sf 2nd dwelling, att 346 sf garage storage, 562 sf detached rec rm above 688 sf workshop. All other buildings will be demoed verified in field by bi. 09 25 14 plan change reduce sf 32 sf of 2nd dw and1743 storage, added to rec rm 41 sf see c of a... Vmd Date: April 1, 2014 Value: $273,714 Permit type: Building : 1014 - re | Permit status: Permit issued | Permit id: Pds2014-Resacc- | |||||
As-built 1162 sf 2nd dwelling, att/346 sf garage/storage, 562 sf detached rec rm above 688 sf workshop. All other buildings will be demoed verified in field by bi. 09/25/14 plan change reduce sf 32 sf of 2nd dw and1743 storage, added to rec rm 41 sf see c of a... Vmd Date: April 1, 2014 Value: $273,714 Permit type: New residential acc structure | Permit status: Issued | Permit id: Pds2014-Resacc- | |||||
As-built 1162 sf 2nd dwelling, att 346 sf garage storage, 562 sf detached rec rm above 688 sf workshop. All other buildings will be demoed verified in field by bi. 09 25 14 plan change reduce sf 32 sf of 2nd dw and1743 storage, added to rec rm 41 sf see c of a... Vmd Date: April 1, 2014 Value: $273,714 Permit type: New residential acc structure | Permit status: Issued | Permit id: Pds2014-Resacc- | |||||
Rough frame Date: February 24, 2017 Permit status: Fail | Permit id: Pds2014-Resacc- | |||||
Stormwater insp Date: September 28, 2016 Permit status: Monitor | Permit id: Pds2014-Resacc- | |||||
Stormwater insp Date: December 23, 2015 Permit status: Monitor | Permit id: Pds2014-Resacc- | |||||
Stormwater insp Date: December 30, 2014 Permit status: Monitor | Permit id: Pds2014-Resacc- | |||||
SCORE 96 735 sqft 2nd dwelling unit (m h 433a - spa 112-1f) and 262 sqft as-built addition to main sfd 10 31 14-one time 6 months plan check extension. Plan check is valid until 4 29 2015--lv 02. 06. 2014: plan change to add as-built addition to main sfd, sqft change to 2nd d. U.... Lhg Permit type: New residential acc | Permit status: Completed | Permit id: Pds2013-Resacc- | Parcel: 123-340-39-00 | |||||
SCORE 59 Minor grading for pds2015-resgrd-000017 (3655 sq. Ft. Sfd, 14 sq. Ft. Attached garage, 635 sq. Ft. Patio porch covers) Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2015-Resgrd- | Parcel: 105-310-62-00 | |||||
SCORE 99 3655 sq. Ft. Sfd, 14 sq. Ft. Attached garage, 635 sq. Ft. Patio porch covers. 4 amp service and temp power notice to permittee: temp power shall be inspected prior to framing inspection Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2015-Respri- | Parcel: 105-310-62-00 | |||||
SCORE 86 6 sf addition and 4 sf garage conversion to create a total of 10 sf 2nd dwelling Date: February 12, 2015 Contractor: Global Design And Construction Inc Permit type: New residential acc | Permit status: Open | Permit id: Pds2015-Resacc- | Parcel: 124-393-29-00 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 23, 2014 Contractor: Sullivan Solar Power Of California Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Solarcity Corporation Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Solar West Electric Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 104-272-19-00 | |||||
SCORE 96 396 sf partial garage conversion to habitable and minor interior remodel to include 3 lf of interior partition with misc electrical and plumbing. 225a electrical service upgrade. Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 123-380-34-00 | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 17, 2014 Contractor: 3 Solar Energy Inc Permit type: Electrical - existing main svc upgrade (max 400a) | Permit status: Issued about to expire | Permit id: Pds2014-Resalt- | Parcel: 123-380-34-00 | |||||
SCORE 96 5 pedestrian bridges within trail easement for "horse creek ridge"; see pds2014-cmaspc-000044 for all clearances. Bridge #1 = 3 sqft bridge #2 = 368 sqft bridge #3 = 4 sqft bridge #4 = 5 sqft bridge #5 = 344 sqft Permit type: Commercial multi-bld | Permit status: Open | Permit id: Pds2014-Cmaspc- | Parcel: 108-421-21-00 | |||||
SCORE 96 Ground mount residential solar pv with 400amp panel upgrade for existing sfd Date: October 1, 2014 Contractor: Built Green California Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 108-081-06-00 | |||||
SCORE 99 10 sf 2nd d. U. Mh on permanent fnd (spa 92-2f)with 4 sf det. Garage and 200amp. 1 13 15 - plan change - foundation plan - see c of a - mfv Permit type: New residential acc | Permit status: Completed | Permit id: Pds2014-Resacc- | Parcel: 107-330-03-00 | |||||
SCORE 72 2 office trailers 1 14 q ft and 2 - 9 sq ft (for existing project to replace aquaduct water pipes - s d county water authority Date: September 18, 2014 Contractor: L H Woods And Sons Inc Permit type: New primary comm str | Permit status: Issued expired | Permit id: Pds2014-Compri- | Parcel: 125-080-19-00 | |||||
SCORE 100 444 sf addition of sfd (bath and sitting rm) Permit type: Residential alterati | Permit status: Issued expired | Permit id: Pds2014-Resalt- | Parcel: 124-041-29-00 | |||||
SCORE 100 Ground mount residential solar pv for existing sfd Date: April 29, 2016 Contractor: Solaire Energy Systems Inc Permit type: Solar photovoltaic residential (hra) | Permit status: Issued | Permit id: Pds2016-Resalt- | Parcel: 1240412900 | |||||
SCORE 100 New 100a agg meter Date: April 25, 2014 Contractor: Stehly Brothers Drilling Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 101-360-51-00 | |||||
SCORE 100 New agg well meter Date: April 25, 2014 Contractor: Stehly Brothers Drilling Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 101-361-42-00 | |||||
As-built 1162 sf 2nd dwelling, att 346 sf garage storage, 562 sf detached rec rm above 688 sf workshop. All other buildings will be demoed verified in field by bi. 09 25 14 plan change reduce sf 32 sf of 2nd dw and1743 storage, added to rec rm 41 sf see c of a... Vmd Date: April 1, 2014 Value: $273,714 Permit type: New residential acc | Permit status: Issued | Permit id: Pds2014-Resacc- | Parcel: 105-291-24-00 | |||||
SCORE 100 Panel upgrade 200a Date: November 22, 2013 Contractor: A S I Hastings Inc Permit type: Residential alterati | Permit status: Issued | Permit id: Pds2013-Resalt- | Parcel: 107-100-55-00 | |||||
SCORE 100 Ground mount residential solar pv for existing sfd Date: February 21, 2014 Contractor: A S I Hastings Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 107-100-55-00 | |||||
Fico-- covert barn to 10 sqft 2nd dwelling unit and 408 sqft asbuilt addition to main sfd (includes spiral staircase and fireplace) non-fico 448 sqft new proposed addition to main sfd and convert existing 327 sqft carport to garage with 65 sqft addition. Date: December 10, 2013 Value: $219,921 Permit type: New residential acc | Permit status: Issued about to expire | Permit id: Pds2013-Resacc- | Parcel: 102-711-37-00 | |||||
Fico-- covert barn to 10 sqft 2nd dwelling unit and 408 sqft asbuilt addition to main sfd (includes spiral staircase and fireplace) non-fico 448 sqft new proposed addition to main sfd and convert existing 327 sqft carport to garage with 65 sqft addition w 200amp service. 6-29-16 courtesy permit renewal per chris heidenreich. Must call for inspection within 1 days to keep permit active. Cdc Date: December 10, 2013 Value: $219,921 Permit type: Second dwelling unit | Permit status: Issued | Permit id: Pds2013-Resacc- | Parcel: 1027113700 | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (on 2nd du) per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 9, 2013 Contractor: Pacific Sun Technologies Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2013-Resalt- | Parcel: 105-180-92-00 | |||||
6 sqft detached 2nd dwelling unit with 1 amps Date: December 3, 2013 Value: $81,204 Permit type: New residential acc | Permit status: Completed | Permit id: Pds2013-Resacc- | Parcel: 123-161-08-00 | |||||
1 amp meter pedestal for at&t excavation permit #dpw2013-rwexcp-00503 encroachment permit #dpw2013-rwencp-00271 Date: October 1, 2013 Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2013-Comalt- | Parcel: 106-271-37-00 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 26, 2014 Contractor: Solar West Electric Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 104-272-19-00 | |||||
871 sf 2nd dwelling w 747 sf attached garage, 54 sf porch, 2 amp 2 13 2014 plan change. Structural only. See c of a... Ss Date: August 12, 2013 Permit type: New residential acc | Permit status: Completed | Permit id: Pds2013-Resacc- | Parcel: 104-272-19-00 | |||||
16 sf single story sfd, 2 amp 8 27 14 plan check extension - must issue w in 6 months of plancheck expiration date (2 06 15)... Djm 2 21 2014 plan change. Added sqft. See c of a... Ss Date: August 6, 2013 Value: $228,724 Permit type: New primary resident | Permit status: Issued expired | Permit id: Pds2013-Respri- | Parcel: 103-030-58-00 | |||||
1014 sqft detached 2nd dwelling unit above 4 sqft attached garage Date: July 26, 2013 Value: $155,983 Permit type: New residential acc | Permit status: Completed | Permit id: Pds2013-Resacc- | Parcel: 107-380-26-00 | |||||
1 amp meter pedestal for at&t for address 1312 green canyon rd excavation dpw 2013rwexcp 00275. Encroachment dpw2013rwewcp 00150. Date: June 5, 2013 Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2013-Comalt- | Parcel: 107-353-06-00 | |||||
SCORE 86 6 sf roof restructure, 1026 sf exterior siding, 57 sf window sliding door replacement and remodel to change existing guest house to 2nd dwelling (address 2205 gum tree) and 150amp upgrade. 7 25 13: plan change - strl only - see c of a... M1a main address is 2203 your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2013-Resalt- | Parcel: 105-180-79-00 | |||||
SCORE 74 464 sf carport for existing sfd Permit type: New residential acc | Permit status: Completed | Permit id: Pds2013-Resacc- | Parcel: 105-641-45-00 | |||||
SCORE 96 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 26, 2013 Contractor: 3 Solar Energy Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2013-Resalt- | Parcel: 105-641-45-00 | |||||
SCORE 96 Grading for p c pds2013-respri-000082 (2514 sqft 1-story sfd, with 883 sqft attached garage, 445 sqft patio covers, 667 sqft attached 2nd dwelling unit with 1 amps note: 2nd du using : 533 oak glade dr. Date: April 20, 2013 Contractor: M L A General Contractor Inc Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2013-Resgrd- | Parcel: 105-640-85-00 | |||||
SCORE 96 2514 sqft 1-story sfd, with 883 sqft attached garage, 445 sqft patio covers, 225 amp, 667 sqft attached 2nd dwelling unit with 1 amps and temp power customer advised sdg&e usually wants 2 separate meters notice to permittee: temp power shall be inspected prior to framing inspection note: 2nd du using : 533 oak glade dr. Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2013-Respri- | Parcel: 105-640-85-00 | |||||
SCORE 64 At&t v-rad cabinet with 1 amp service, generator ports only no batteries Date: April 19, 2013 Contractor: So Cal Construction And Consulting Service Inc Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2013-Comalt- | Parcel: 106-571-22-00 | |||||
1 amps meter pedestal for at&t in road right-away Date: January 30, 2013 Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2013-Resalt- | Parcel: 104-341-08-00 | |||||
1 amp meter pedestal for at&t excavation # dpw2013-rwexcp-00024 encroachment #dpw2013-rwencp-00006 Date: January 25, 2013 Permit type: New commercial acc s | Permit status: Completed | Permit id: Pds2013-Comacc- | Parcel: 105-351-29-00 | |||||
1 amp meter pedestal for at&t encroachment #dpw2013-rwencp-00009 excavation #dpw2013-rwexcp-00026 Date: January 25, 2013 Permit type: New commercial acc s | Permit status: Issued expired | Permit id: Pds2013-Comacc- | Parcel: 106-031-71-00 | |||||
1 amp meter pedestal for at&t excavation permit: dpw2012-rwexcp-00024 encroachment permit: dpw2012-rwencp-00010 Date: December 14, 2012 Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2012-Comalt- | Parcel: 106-410-24-00 | |||||
1 amp meter pedestal for at&t excavation permit dpw2012-rwexcp-00024 encroachment permit dpw2012-rwencp-00010 Date: December 14, 2012 Permit type: Electrical only | Permit status: Completed | Permit id: Pds2012-Comalt- | Parcel: 1064102400 | |||||
All structures as-built -1031 sf mh as 2nd dwelling on piers, 1 amp, 494 sf garage conversion, (bdrm livrm) to main dwelling, and 12 sf barn (form 2) 2nd dwelling is 9172 and main house is 91 huntly rd 05. 17. 2013: reduced sqft due to correction on floor plan from 1039 to 1031 sqft... Lhg Date: December 3, 2012 Value: $251,938 Permit type: New residential acc | Permit status: Pc expired | Permit id: Pds2012-Resacc- | Parcel: 110-350-06-00 | |||||
All structures as-built -1031 sf mh as 2nd dwelling on piers, 1 amp, 494 sf garage conversion, (bdrm livrm) to main dwelling, and 12 sf barn (form 2) 2nd dwelling is 9172 and main house is 91 huntly rd 05. 17. 2013 reduced sqft due to correction on floor plan from 1039 to 1031 sqft... Lhg Date: December 3, 2012 Value: $251,938 Permit type: Second dwelling unit | Permit status: Pc expired | Permit id: Pds2012-Resacc- | Parcel: 1103500600 | |||||
SCORE 59 Park name: rancho monserate park i. D. No. 37- 0834 space no.: parksite map ref: 1048-h3 h4 community: fallbrook description: misc electrical for parksite. 02. 28. 2013: permit renewal good for 6 months... Lhg note to permittee: once this permit is issued it will be valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: May 7, 2012 Contractor: Precision Power Solutions Inc Permit type: Construction in a mh | Permit status: Completed | Permit id: Pds2012-1035-20 | Parcel: 125-090-41-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 3 bldg d-645 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1019-20 | Parcel: 105-540-58-00 | |||||
SCORE 89 Hra-- 58 sqft reroof (same clay tile relay felt) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Misc. (antennas, tennis cts, gazebo) | Permit status: Completed | Permit id: Pds2012-1030-20 | Parcel: 124-041-07-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 2- for m & l-1504 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1019-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 7 bldg j -1613 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1019-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 6 bldg h - 1337 sf your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1019-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - building d- roof mount commercial solar pv no. Of modules: 46 no. Of inverters: 4 total system size in kilowatts: 10 6-14-2012 - plan change reduced panel count by 16 and inverter by 2 see c of a 5-2-2012 inscreased solar module count on roof from 43 to 46 see 1016-20110008 for all clearances and fees. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Everyday Energy Co Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs j carport 7 no. Of modules: 90 no. Of inverters: 3 total system size in kilowatts: 18 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Everyday Energy Co Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs e carport 4 no. Of modules: 180 no. Of inverters: 5, total system size in kilowatts: 35 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Everyday Energy Co Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv on carport 1 serving bldg b no. Of modules: 116, no. Of inverters: 4, total system size in kilowatts: 22 5-2-2012 plan change reduced main breaker, misc electrical and increased module count vam. See c of a see 1016-20110008 for all sign offs and fees for plan change per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Everyday Energy Co Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 1 bldg b-2077 sq ft, 4 20 12: plan change -- strl only; see c of a... Vmt 3 7 12: plan change -- strl only; see c of a... Vmt Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1019-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv bldgs f & g, carport 5 no. Of modules: 188 no. Of inverters: 6 total system size in kilowatts: 38 5-2-2012 reduced modules from 198 to 188, reduced string county on inverter #1 & 4, increased subpenl breaker size, adjusted conduit size accordingly. See 1016-20110008 for all clearances and fees. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Everyday Energy Co Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - roof mount commercial solar pv on carport 2 serving building l & m no. Of modules: 84 no. Of inverters: 2 total system size in kilowatts: 12 5-21-2012 plan change increased subpanel breaker size, and utility disconnect ssize, adjusted conduit and wire size according, increased panel count 63-84 see 1016-20110008 for all clearances and fees. Vam. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Everyday Energy Co Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport #4 bldg e-3224 sf, your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2011-1019-20 | Parcel: 105-540-58-00 | |||||
SCORE 82 7 carports with 7 pv systems on roof and bldg d roof mounted system - see 1016-20110008 for all clearances - carport 1-2077 sq ft, roof mount commercial solar pv no. Of modules: 113, no. Of inverters: 4, total system size in kilowatts: 22 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool ro Permit type: Misc. (antennas, canopy, racks) | Permit status: Completed | Permit id: Pds2011-1017-20 | Parcel: 105-540-58-00 | |||||
SCORE 93 Park name: valley oaks trailer ranch park i. D. No. 37- 0265 space no.: club house map ref:1028-f4 community: fallbrook description: ac replacement for existing club house. Note to permittee: once this permit is issued it will be valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. 7 10 12: permit renewed for 6 months until 11-jan-2013. No fee to renew permit per brad from state of california. 1srs Date: September 8, 2011 Contractor: Fallbrook Heating And A C Permit type: Construction in a mh | Permit status: Completed | Permit id: Pds2011-1035-20 | Parcel: 107-070-20-00 | |||||
SCORE 100 Misc electric for 1 amps ag well meter for ag pump only--- note: address for meter is 769 a knoll park ln. Date: August 22, 2011 Contractor: Stehly Brothers Drilling Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2011-1007-20 | Parcel: 105-082-09-00 | |||||
SCORE 100 Misc electric for 1 amps ag well meter for ag pump only--- note address for meter is 769 a knoll park ln. Date: August 22, 2011 Contractor: Stehly Brothers Drilling, Inc Permit type: Electrical only | Permit status: Completed | Permit id: Pds2011-1007-20 | Parcel: 1050820900 | |||||
SCORE 99 Grading for plan check #1001-20110051 (10 sqft sfd w ac & fs, 242 sqft attached finished garage w fs, hra 57 sqft patio cover, 2 amps and temp power) Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2011-1026-20 | Parcel: 105-310-51-00 | |||||
SCORE 99 10 sqft sfd w ac & fs, 242 sqft attached finished garage w fs, hra 57 sqft patio cover, 2 amps and temp power notice to permittee: temp power shall be inspected prior to framing inspection 01. 02. 2014: packet purged... Lhg Permit type: New primary residential structure | Permit status: Pc expired | Permit id: Pds2011-1001-20 | Parcel: 105-310-51-00 | |||||
Park name: valley oak park park i. D. No. 37-0265 space no.: 214-216 map ref: 1028-f4 community: fallbrook description: 2007 fire rebuild create 3 spaces (#new 214, 215 and 216) in the area where the managers stick built sfd was originally located also adding 1 new meter note to permittee: this permit is valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: July 21, 2010 Permit type: Construction in a mh | Permit status: Completed | Permit id: Pds2010-1035-20 | Parcel: 107-070-20-00 | |||||
Park name: valley oak park park i. D. No. 37-0265 space no.: 214-216 map ref: 1028-f4 community: fallbrook description: 2007 fire rebuild create 3 spaces (#new 214, 215 and 216) in the area where the managers stick built sfd was originally located also adding 1 new meter note to permittee: this permit is valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. 5 25 - plan check renewed at no charge due to 2007 fire rebuild - valid until 10 14 10. Tgb Date: April 14, 2009 Permit type: New commercial acc s | Permit status: Completed | Permit id: Pds2009-1017-20 | Parcel: 107-070-20-00 | |||||
SCORE 90 Park name: valley oak trailer ranch park i. D. No. 37- 0265 space no.: various map ref: 1028-f4 community: fallbrook description: replace (e) obsolete 100-amp oil fuse 3-phase cutout, with a new line-interrupting switch per attached drawings; install a 600-amp 5kw line-fuse cabinet with a one 2 amp dry fuse for each of six single-phase circuits. Three circuits are existing and three new circuits will service the burned out area. (123 lot utility service alternations, 123 electrical lot services, 1 park service, 46 lights.) note to permittee: this permit is valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: May 14, 2008 Contractor: Subsurface Electric Inc Permit type: Construction in a mh | Permit status: Completed | Permit id: Pds2008-1035-20 | Parcel: 107-070-20-00 | |||||
SCORE 65 Park name: valley oak park park i. D. No. 37-0265 space no.: 1-14, 179a-199, 201-214, 65-70, 75-77, 82,84,86,87,88, 90-92, 102-104, 107, 111, 113115,116,118,120, 122, 124, 126, 128, & 1 map ref: 1028-f4 community: fallbrook description: 2007 fire rebuild replace 97 risers like for like note to permittee: this permit is valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: March 26, 2008 Contractor: Amtec Service Co Permit type: Construction in a mh | Permit status: Issued expired | Permit id: Pds2008-1035-20 | Parcel: 107-070-20-00 | |||||
SCORE 99 Park name: valley oaks trailer ranch park i. D. No. 37- 0265 space no.: various map ref: 1028-f4 community: fallbrook description: firestorm replacement of switch gear transformers and 1 amp meter pedestals for spaces: 1-34, 57-58, 65-131-169-214. Note to permittee: this permit is valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Date: December 12, 2007 Contractor: Barton Electric Permit type: Construction in a mh | Permit status: Pc expired | Permit id: Pds2007-1035-20 | Parcel: 107-070-20-00 | |||||
SCORE 65 Park name: valley oak park park i. D. No. 37-0265 space no.: 1-14, 179a-199, 201-214, 65-70, 75-77, 82,84,86,87,88, 90-92, 102-104, 107, 111, 113115,116,118,120, 122, 124, 126, 128, & 1 map ref: 1028-f4 community: fallbrook description: 2007 fire rebuild lot line adjustments removal and addition of spaces to equal total of 213 allowable units, as follows: converting common area between space 146 and 148 to space 147 converting common area and lot line change for spaces 179a and b and adding space 179 between space 1 and 178 convert space 192 from unit and laundry to laundry common area only lot line change to create common area between space and 75 and remove meter from space lot line reconfiguration of space 71 lot line change to combine space 89 and to be space 90 lot line change to combine space 212 and 214 to be space 212 lot line changes between spaces 95, 96 and 97 to reconfigure add lot line to create common area for car wash with remainder of lot to stay space 16 and remove m Date: December 9, 2008 Contractor: Amtec Service Co Permit type: 1152 - m. H. P. - 9 - valuation/parksite/const. | Permit status: Completed | Permit id: Pds2008-1017-20 | Parcel: 107-070-20-00 | |||||
SCORE 65 Park name: valley oak park park i. D. No. 37-0265 space no.: 1-14, 179a-199, 201-214, 65-70, 75-77, 82,84,86,87,88, 90-92, 102-104, 107, 111, 113115,116,118,120, 122, 124, 126, 128, & 1 map ref: 1028-f4 community: fallbrook description: 2007 fire rebuild lot line adjustments removal and addition of spaces to equal total of 213 allowable units, as follows: converting common area between space 146 and 148 to space 147 converting common area and lot line change for spaces 179a and b and adding space 179 between space 1 and 178 convert space 192 from unit and laundry to laundry common area only lot line change to create common area between space and 75 and remove meter from space lot line reconfiguration of space 71 lot line change to combine space 89 and to be space 90 lot line change to combine space 212 and 214 to be space 212 lot line changes between spaces 95, 96 and 97 to reconfigure add lot line to create common area for car wash with remainder of lot to stay space 16 and remove m Date: May 20, 2009 Contractor: Amtec Service Co Permit type: 1152 - m. H. P. - 9 - valuation/parksite/const. | Permit status: Completed | Permit id: Pds2009-1019-20 | Parcel: 107-070-20-00 | |||||
SCORE 95 `verizon wireless cell site mod as follows - 3 new panel antennas to replace 3 existing panel antennas. 2 new 6x12 hybrid power fiber cables, 1 new fiber power demarcation box and 1 new fiber demarcation rack mount, 3 new rrus one new baseband unit and 1 rack mount module Permit type: Misc. (antennas, canopy, racks) | Permit status: Completed | Permit id: Pds2014-Comalt- | Parcel: 109-392-13-00 | |||||
SCORE 96 Cell site modification for at&t -- install 2 purcell cabinets (stacked), install 1 power cabinet, install 6 antennas w socks, install 12 rrus-11 for lte, install 2 dc surge suppressors, install 1 at&t gps antenna, install dc & fiber cables, install cable tray. Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2013-Comalt- | Parcel: 109-392-13-00 | |||||
SCORE 99 Installation of 12 antennas on existing vista towers mono-broadleaf tower, 2 ground mount ac units, 1 standby generator & new equipment inside existing enclosure w new 2 amp service for verizon wireless Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2010-1019-20 | Parcel: 109-392-13-00 | |||||
SCORE 87 Installation of a multi-carrier communications facility including with tall mono-broadleaf tower, 182 sqft wall enclosure for future standby generator, 224 sqft cmu equipment shelter with 6 amp bussed gutter w 3 future meter positions inside new 2503 sqft cmu enclosure for vista towers. Permit type: Commercial alteratio | Permit status: Completed | Permit id: Pds2010-1019-20 | Parcel: 109-392-13-00 | |||||
Cell site modification for verizon wireless -- replace 3 antennas, install 1 dc-6 squid surge suppressor, install 1 raycap, install 3 rrus. 5-2-2016 vicky m has the hazmat/gnatcatcher referral slip at her desk vam Date: December 9, 2015 Value: $18,000 Permit type: Misc. (antennas, canopy, racks) | Permit status: Issued | Permit id: Pds2015-Comalt- | Parcel: 1093921300 | |||||
SCORE 84 Cell site mod for at&t as follows - remove and replace (3) antennas - install (3) rrus - install (3) filters - install (1) surge protector - install (1) gps antenna - install (1) rectifier in (e) power plant - install (1) rbs6601 with dus-41 in (e) umts purcell cabinet - install (1) dc power cable trunk and (1) fiber cable trunk Permit type: Misc. (antennas, canopy, racks) | Permit status: Issued | Permit id: Pds2016-Comalt- | Parcel: 1093921300 | |||||
SCORE 93 Cell site modification for verizon wireless -- replace 3 antennas, install 1 dc-6 squid surge suppressor, install 1 raycap, install 3 rrus. 5-2-2016 vicky m has the hazmat gnatcatcher referral slip at her desk vam Permit type: Misc. (antennas, canopy, racks) | Permit status: Completed | Permit id: Pds2015-Comalt- | Parcel: 1093921300 | |||||
SCORE 100 Cell site consisting of: installation of 12 panel anteneas and 24 tmas on existing mono broadleaf tree, 4 outdoor equipment cabinets on new concrete pad, new 2 amp service for at&t mobility. 7 9 10: plan change -- strl only; see c of a... Vmt Permit type: Misc. (antennas, canopy, racks) | Permit status: Completed | Permit id: Pds2010-1019-20 | Parcel: 109-392-13-00 | |||||
SCORE 100 Cell site consisting of: installation of 12 panel anteneas and 24 tmas on existing mono broadleaf tree, 4 outdoor equipment cabinets on new concrete pad, new 2 amp service for at&t mobility. Permit type: Misc. (antennas, canopy, racks) | Permit status: Completed | Permit id: Pds2010-1017-20 | Parcel: 109-392-13-00 | |||||
1 amp meter for at&t california n-5270, e-88308 Date: February 8, 2010 Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2010-1007-20 | Parcel: 103-264-20-00 | |||||
SCORE 93 Park name: valley oak park park i. D. No. 37- 0265 space no.: park map ref:1028-f4 community: fallbrook description: 2007 fire rebuild 1296 sqft metal maintenance building with 576 sqft covered area to be used as carwash area. New 2 amp service & misc. Elec. & plum for valley oaks mobile home park note to permittee: this permit is valid for six months. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct. Permit type: Construction in a mh | Permit status: Completed | Permit id: Pds2008-1035-20 | Parcel: 107-070-20-00 | |||||
SCORE 100 R & r fau Date: April 3, 2008 Contractor: Excel Air Corp Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1009-20 | Parcel: 124-041-02-00 | |||||
SCORE 100 1 amp meter for ag irrigation purposes only. 08 25 08 renew permit @ 50%... Vmd Date: May 30, 2007 Contractor: Stehly Brothers Drilling Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1007-20 | Parcel: 109-021-22-00 | |||||
SCORE 100 1 amp meter for ag irrigation purposes only. 08 25 08 renew permit @ 50%... Vmd Date: May 30, 2007 Contractor: Stehly Brothers Drilling, Inc Permit type: Electrical only | Permit status: Completed | Permit id: Pds2007-1007-20 | Parcel: 1090212200 | |||||
SCORE 89 5 sqft detached aluminum patio cover for existing sfd Permit type: New residential acc | Permit status: Completed | Permit id: Pds2014-Resacc- | Parcel: 124-041-43-00 | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 13, 2013 Contractor: Solarcity Corporation Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2013-Resalt- | Parcel: 124-041-43-00 | |||||
SCORE 87 927 s. F. Pool only for sfd. Addtl details provided for rock surcharge and vanishing edge. Misc elect & plumbg 5-21-07: plan change to add county std fireplace and move pool equipment to a new location. Cdc Permit type: Pool/spa for sfd or duplex | Permit status: Completed | Permit id: Pds2007-1023-20 | Parcel: 124-041-43-00 | |||||
90 sq. Ft. Metal agricultural barn with 30 sq. Ft. Attached metal patio cover for envirepal (company with orange and avocado orchard), no electrical, plumbing, or mechanical installations for pankey ranch-ded, 2 16 06. Note: per applicant at intake, barn was to be used for farm vehicle storage-ded, 3 3 06 12 26 07: plan packet purged Date: February 16, 2006 Value: $204,000 Permit type: Commercial alteratio | Permit status: Pc expired | Permit id: Pds2006-1017-20 | Parcel: 125-063-06-00 | |||||
90 sq. Ft. Metal agricultural barn with 30 sq. Ft. Attached metal patio cover for envirepal (company with orange and avocado orchard), no electrical, plumbing, or mechanical installations for pankey ranch-ded, 2 16 06. Note per applicant at intake, barn was to be used for farm vehicle storage-ded, 3 3 06 12 26 07 plan packet purged Date: February 16, 2006 Value: $204,000 Permit type: Tenant improvement | Permit status: Pc expired | Permit id: Pds2006-1017-20 | Parcel: 1250630600 | |||||
3793 sf main sfd, ac fs; 6 sf attd 2nd d. U. Ac fs; 715 sf attd gar, fs fin; 545 sf patios, 4 amps, temp power, ( for 2nd d u use 1862 a vista del lago -per nora) note: 2nd d. U. Changed to attd guest living quarters... Daa notice to permittee: temp power shall be inspected prior to framing inspection Date: August 2, 2005 Value: $414,911 Permit type: New primary resident | Permit status: Completed | Permit id: Pds2005-1003-20 | Parcel: 102-400-44-00 | |||||
3793 sf main sfd, ac fs; 6 sf attd 2nd d. U. Ac fs; 715 sf attd gar, fs fin; 545 sf patios, 4 amps, temp power, ( for 2nd d u use 1862 a vista del lago -per nora) note 2nd d. U. Changed to attd guest living quarters... Daa notice to permittee temp power shall be inspected prior to framing inspection Date: March 8, 2005 Value: $414,911 Permit type: New primary residential structure | Permit status: Pc expired | Permit id: Pds2005-1001-20 | Parcel: 1024004400 | |||||
SCORE 82 Temp power pole for l 14658 Date: July 20, 2005 Contractor: Temp Power Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1007-20 | Parcel: 105-450-06-00 | |||||
SCORE 65 500sf subfloor repair for existing sfd Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1005-20 | Parcel: 124-041-25-00 | |||||
SCORE 99 Electrical upgrade to 2 amps. Date: January 4, 2007 Contractor: Advanced Electric Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1007-20 | Parcel: 102-430-30-00 | |||||
SCORE 89 550sf pool and spa, mp 91, misc electric and lpg line for heater Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1023-20 | Parcel: 102-430-30-00 | |||||
SCORE 96 Water heater replacement, no modifications or alternations to existing system Date: July 21, 2017 Contractor: Affordable Water Heaters And Plumbing Inc Permit type: Hra water heater r&r | Permit status: Completed | Permit id: Pds2017-Resalt- | |||||
SCORE 96 360sf pool and spa, mp 77, misc electric and lpg line for heater Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1023-20 | Parcel: 124-041-22-00 | |||||
4 sf as built ag storage bldg conversion to 2nd du permit cannot be issued nor finaled prior to main sfd pds2015-respri-000177 Date: July 28, 2015 Value: $46,214 Permit type: New residential acc | Permit status: Open | Permit id: Pds2015-Resacc- | Parcel: 108-390-32-00 | |||||
3238sf 1-story sfd w attached 725sf garage, 1108sf patio covers w electrical, electrical for 2 entry gates (max 6 high), 200a meter. Existing sfd to become second dwelling unit upon final. Date: August 5, 2015 Value: $489,817 Permit type: New primary resident | Permit status: Open | Permit id: Pds2015-Respri- | Parcel: 124-070-52-00 | |||||
3238sf 1-story sfd w/ attached 677 sf garage, 1143 sf patio covers (includes 336 sqft detached pool cabana) w/ electrical, 200a meter. Existing sfd to become second dwelling unit upon final. 10/2/2015 plan change. Update sqft of garage and patios. See c of a... Ss Date: August 5, 2015 Value: $488,677 Permit type: New primary residential structure | Permit status: Issued | Permit id: Pds2015-Respri- | Parcel: 1240705200 | |||||
3238sf 1-story sfd w attached 677 sf garage, 1143 sf patio covers (includes 336 sqft detached pool cabana) w electrical, 200a meter. Existing sfd to become second dwelling unit upon final. 10 2 2015 plan change. Update sqft of garage and patios. See c of a... Ss Date: August 5, 2015 Value: $488,677 Permit type: New primary residential structure | Permit status: Issued | Permit id: Pds2015-Respri- | Parcel: 1240705200 | |||||
Installation of pool spa 450sf for existing sfd. Date: August 18, 2015 Value: $34,650 Permit type: New residential acc | Permit status: Issued | Permit id: Pds2015-Resacc- | Parcel: 124-070-52-00 | |||||
SCORE 93 Ground mount residential solar pv for existing sfd sfd under permit pds2015-respri-000193 Date: March 16, 2016 Contractor: Eric Wendt Construction Inc Permit type: Solar photovoltaic residential (hra) | Permit status: Issued | Permit id: Pds2016-Resalt- | Parcel: 1240705200 | |||||
Installation of pool/spa 450sf for existing sfd. Date: August 18, 2015 Value: $34,650 Permit type: Pool/spa for sfd or duplex | Permit status: Issued expired | Permit id: Pds2015-Resacc- | Parcel: 1240705200 | |||||
Installation of pool spa 450sf for existing sfd. Sfd under pds2015-respri-000193 09-01-16 permit renewed @ 25% of current fees.... Must call for valid inspection within 1 days... Tlh Date: August 18, 2015 Value: $34,650 Permit type: Pool/spa for sfd or duplex | Permit status: Issued | Permit id: Pds2015-Resacc- | Parcel: 1240705200 | |||||
SCORE 96 Misc elec for new gate entry structure across private road Permit type: New residential acc | Permit status: Issued about to expire | Permit id: Pds2015-Resacc- | Parcel: 105-514-51-00 | |||||
847 sq. Ft. 2nd du; 4 sq. Ft. Att. Gar; 562 sq. Ft. Porch. W 100a sub-panel. 8 26 15-change contractor. Kp Date: July 13, 2015 Value: $145,183 Permit type: New residential acc | Permit status: Open | Permit id: Pds2015-Resacc- | Parcel: 123-060-64-00 | |||||
847 sq. Ft. 2nd du; 4 sq. Ft. Att. Gar; 562 sq. Ft. Porch. W/ 100amp meter 8/26/15-change contractor. Kp Date: July 13, 2015 Value: $145,183 Permit type: Second dwelling unit | Permit status: Issued | Permit id: Pds2015-Resacc- | Parcel: 1230606400 | |||||
847 sq. Ft. 2nd du; 4 sq. Ft. Att. Gar; 562 sq. Ft. Porch. W 100amp meter 8 26 15-change contractor. Kp Date: July 13, 2015 Value: $145,183 Permit type: Second dwelling unit | Permit status: Issued | Permit id: Pds2015-Resacc- | Parcel: 1230606400 | |||||
2930sf sfd, 455sf attached guest living quarters, 1175 attached garage, 209sf attached workshop, 400amp service, temp power. Notice to permittee: temp power shall be inspected prior to framing inspection Date: September 2, 2015 Value: $529,929 Permit type: New primary resident | Permit status: Open | Permit id: Pds2015-Respri- | Parcel: 105-310-55-00 | |||||
SCORE 99 2930sf sfd, 455sf attached guest living quarters, 1175 attached garage, 209sf attached workshop, 400amp service, temp power. Notice to permittee temp power shall be inspected prior to framing inspection Permit type: New primary residential structure | Permit status: Issued | Permit id: Pds2015-Respri- | Parcel: 1053105500 | |||||
SCORE 99 Grading for pds2015-respri-000271 (29 sf sfd, 455 sf attached guest living quarters, 1175 sf attached garage, 209 sf attached workshop, 400amp service, temp power) notice to permittee: temp power shall be inspected prior to framing inspection Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2015-Resgrd- | Parcel: 105-310-55-00 | |||||
Fico 616 sf as-built 2nd du Date: June 24, 2015 Permit type: New residential acc | Permit status: Open | Permit id: Pds2015-Resacc- | Parcel: 104-242-40-00 | |||||
Fico 616 sf as-built conversion from garage to 2nd du (originally permitted under pds1991-c-91050391) 9-12-16 one time 6 month plan check extension good until 12 20 16. Cdc Date: June 24, 2015 Value: $59,308 Permit type: Second dwelling unit | Permit status: Issued | Permit id: Pds2015-Resacc- | Parcel: 1042424000 | |||||
SCORE 99 796 sqft detached finished garage w/ electrical for existing sfd. Permit type: Garages for sfd/duplex | Permit status: Completed | Permit id: Pds2015-Resacc- | Parcel: 105-291-24-00 | |||||
4011 sq ft sfd w ac, fs, 632 att fin fs garage . 778 sq ft of decks and 422 sq ft open courtyard. Detached 2nd dwelling unit 1198 sq ft w ac, fswith att 284 sq ft fin garage 2 amp service for main house and 1 amp for 2nd dwelling. . 10-09-15 plan change: structural only... See coa tlh 09-10-15 one-time only courtesy renewal per c. H... Must call for a valid inspection within 1 days... Tlh 1-15-2014 - plan change increased size of house by converted proposed garage workshop to habitable space see c of a van address for 2nd d. U. Is 318 villa del cielo dr Date: October 11, 2013 Value: $764,105 Permit type: New primary resident | Permit status: Issued in plan change | Permit id: Pds2013-Respri- | Parcel: 121-172-23-00 | |||||
4011 sq ft sfd w ac, fs, 632 att fin fs garage . 303 sq ft of decks and 422 sq ft open courtyard. Detached 2nd dwelling unit 1198 sq ft w ac, fswith att 284 sq ft fin garage, lower patio roofs, 2 amp service for main house and 1 amp for 2nd dwelling. . 11-03-15 plan change decreased sqft of deck... See coa tlh 10-09-15 plan change structural only... See coa tlh 09-10-15 one-time only courtesy renewal per c. H... Must call for a valid inspection within 1 days... Tlh 1-15-2014 - plan change increased size of house by converted proposed garage workshop to habitable space see c of a van address for 2nd d. U. Is 318 villa del cielo dr Date: October 11, 2013 Value: $749,855 Permit type: New primary residential structure | Permit status: Issued expired | Permit id: Pds2013-Respri- | Parcel: 1211722300 | |||||
Ground mount residential solar pv for existing sfd Date: October 22, 2015 Permit type: Residential alterati | Permit status: Issued | Permit id: Pds2015-Resalt- | Parcel: 107-380-26-00 |