Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 30, 2014 Contractor: Jarrod J Fisk Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: January 7, 2015 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 27, 2014 Permit type: Electrical : 8003 - | Permit status: Inspection phase | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 30, 2016 Contractor: A S I Hastings Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 30, 2014 Contractor: Solaire Energy Systems Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 7, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 93 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 27, 2014 Contractor: Green Energy Epc Inc Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2014-Resalt- | |||||
Final Date: January 7, 2015 Permit status: Pass | Permit id: Pds2014-Resalt- |