Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Firestorm 2007 2285 sf single story sfd, ac fs, 7 sf att garage, fin fs, 3 sf patio cover, 2 amp, temp power (original was 22 sqft sfd & 4 sqft garage per damage assessment by deena raver) 07. 22. 2013: renewal at 25% must ahve an inspection within every 1 days... Lhg 8 17 11: permit renewed this date @ 25% fees. Must call for and pass an inspection within 1 days... M1a 12-oct-2010: permit renewed this date @ 25% fees. Must call for and pass an inspection within 1 days. Ksg notice to permittee: temp power shall be inspected prior to framing inspection Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2009-1003-20 | Parcel: 107-190-76-00 | |||||
SCORE 100 Firestorm 2007 2285 sf single story sfd, ac fs, 7 sf att garage, fin fs, 3 sf patio cover, 2 amp, temp power (original was 22 sqft sfd & 4 sqft garage per damage assessment by deena raver) notice to permittee: temp power shall be inspected prior to framing inspection 9 29 09: plan change see conditions for info. 1srs Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2009-1001-20 | Parcel: 107-190-76-00 |