Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-42) located in the south parking lane north of 3832 calvert st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. Th Date: November 10, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: April 16, 2016 | Permit id: Pa119069 | |||||
SCORE 100 3x3 dirt cut o/s 33 s c/l calvert st nw and 3 tunlaw rd nw per 7 - wr# 1204368 Date: August 20, 2013 Contractor: Washington Gas Permit type: Excavation; repair gas service (excavation) | Permit status: Permit expired | Expiration date: October 21, 2013 | Permit id: Pa85895 | |||||
SCORE 100 3x3 dirt cut o s 33 s c l calvert st nw and 3 tunlaw rd nw per 7 - wr# 1204368 Date: September 9, 2013 Contractor: Washington Gas Permit status: Permit expired | Expiration date: October 21, 2013 | Permit id: Pa85895 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-42) located in the south parking lane north of 3832 calvert st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. Th Date: November 10, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: April 16, 2016 | Permit id: Pa119069 | |||||
SCORE 99 Construction staging area Date: December 7, 2015 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: January 8, 2016 | Permit id: Pa10221926 | |||||
SCORE 99 Construction staging area Date: January 14, 2016 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: February 14, 2016 | Permit id: Pa10226718 | |||||
SCORE 60 Moving truck Date: April 18, 2016 Contractor: Emily Larson Permit status: Permit expired | Expiration date: April 30, 2016 | Permit id: Pa10249822 |