Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Replace walk-in freezer/cooler ![]() ![]() Permit id: Mech20091658 | |||||
Remove existing business identification monument sign and install new ![]() ![]() Client: Rosecrance Health Network | Permit id: Mulcom20091861 | |||||
Interior demo for rosecrance. Counter review. Demo all interior partitions on the third floor, stairway shafts, hvac shafts, and elevator shafts to remain. ![]() ![]() Client: Rosecrance Health Network | Permit id: Mulcom20101611 | |||||
3rd floor remodel. Building plan review # 10-0905 ![]() ![]() Client: Rosecrance Health Network | Permit id: Mulcom20101666 | |||||
1. 98 btu boiler9 ton cooling rtuductwork(1) 8 cfm ex ![]() ![]() Client: Rosecrance | Permit id: Mech20102324 | |||||
SCORE 96 Wiring for 3rd floor remodel (plan review#10-0905) ![]() ![]() Client: Rosecrance Health Network | Permit id: Elect20101686 | |||||
(6) sh, (8) wc, (7) lav, (1) wb, (1) ks, (1) df, (1) ms, (8) fd ![]() ![]() Client: Rosecrance Health Network | Permit id: Plum20101891 | |||||
(2) 842 boiler replace ![]() ![]() Client: Rosecrance Health Network, Rosecrance | Permit id: Mech20102669 | |||||
SCORE 95 Rosecrance dining room addition. Building plan review # 10-1110 ![]() ![]() Client: Rosecrance Health Network | Permit id: Plum20102141 | |||||
SCORE 96 Disconnect 2 old boilers and reconnect 2 new boilers Client: Rosecrance | Permit id: Elect20111092 | |||||
SCORE 88 Replace walk-in freezer/cooler Permit id: Mech20091658 | |||||
SCORE 96 1. 98 btu boiler9 ton cooling rtuductwork(1) 8 cfm ex Client: Rosecrance | Permit id: Mech20102324 | |||||
SCORE 89 (2) 842 boiler replace Client: Rosecrance Health Network, Rosecrance | Permit id: Mech20102669 | |||||
SCORE 93 Remove existing business identification monument sign and install new Client: Rosecrance Health Network | Permit id: Mulcom20091861 | |||||
SCORE 96 3rd floor remodel. Building plan review # 10-0905 Client: Rosecrance Health Network | Permit id: Mulcom20101666 | |||||
SCORE 89 (6) sh, (8) wc, (7) lav, (1) wb, (1) ks, (1) df, (1) ms, (8) fd Client: Rosecrance Health Network | Permit id: Plum20101891 | |||||
SCORE 96 Interior demo for rosecrance. Counter review. Demo all interior partitions on the third floor, stairway shafts, hvac shafts, and elevator shafts to remain. Client: Rosecrance Health Network | Permit id: Mulcom20101611 | |||||
SCORE 96 Interior demo for rosecrance. Counter review. Demo all interior partitions on the third floor, stairway shafts, hvac shafts, and elevator shafts to remain. Client: Rosecrance Health Network | Permit id: Mulcom20101611 | |||||
SCORE 96 1. 98 btu boiler9 ton cooling rtuductwork(1) 8 cfm ex Client: Rosecrance | Permit id: Mech20102324 | |||||
SCORE 89 (2) 842 boiler replace Client: Rosecrance Health Network, Rosecrance | Permit id: Mech20102669 | |||||
SCORE 96 3rd floor remodel. Building plan review # 10-0905 Client: Rosecrance Health Network | Permit id: Mulcom20101666 | |||||
SCORE 96 Wiring for 3rd floor remodel (plan review#10-0905) ![]() ![]() Client: Rosecrance Health Network | Permit id: Elect20101686 | |||||
SCORE 93 Remove existing business identification monument sign and install new Client: Rosecrance Health Network | Permit id: Mulcom20091861 | |||||
SCORE 89 (6) sh, (8) wc, (7) lav, (1) wb, (1) ks, (1) df, (1) ms, (8) fd Client: Rosecrance Health Network | Permit id: Plum20101891 | |||||
SCORE 95 Rosecrance dining room addition. Building plan review # 10-1110 ![]() ![]() Client: Rosecrance Health Network | Permit id: Plum20102141 | |||||
SCORE 96 Disconnect 2 old boilers and reconnect 2 new boilers Client: Rosecrance | Permit id: Elect20111092 | |||||
SCORE 88 Replace walk-in freezer cooler Permit id: Mech20091658 | |||||
SCORE 96 Disconnect 2 old boilers and reconnect 2 new boilers Client: Rosecrance | Permit id: Elect20111092 | |||||
SCORE 95 Rosecrance dining room addition. Building plan review # 10-1110 ![]() ![]() Client: Rosecrance Health Network | Permit id: Plum20102141 |