Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Quintero mh to lot 38 Date: May 4, 2011 Permit status: Closed | Permit id: 11-02050 | |||||
SCORE 100 Quintero mh to lot 38 Client: Quintero Mh To Lot 38 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-02050 | Parcel: 10401 | |||||
SCORE 100 Quintero mh to lot 38 Client: Quintero Mh To Lot 38 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-02050 | Parcel: 10401 | |||||
April 14, 2011 3:42:53 pm kneel. Quintero - used mh to lot 38 location: patton to n louisiana to arctic.; may 4, 2011 9:51:46 am kneel. Quintero - used mh to lot 38; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be Permit type: Permits - historical | Permit status: Closed | Permit id: 11-02050 | Parcel: 10401 | |||||
Quintero mh to lot 38 Date: May 4, 2011 Value: $5,000 Permit type: Historical | Permit status: Closed | Permit id: 11-02050 | |||||
April 14, 2011 3:42:53 pm kneel. Quintero - used mh to lot 38 location: patton to n louisiana to arctic.; may 4, 2011 9:51:46 am kneel. Quintero - used mh to lot 38; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be Date: May 4, 2011 Permit type: Permits - historical | Permit status: Closed | Permit id: 11-02050 | Parcel: 10401 |