3700sqft re-roof (hra) for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material: comp shingles proposed roofing material: comp shingles manufacturer: gaf brand and model: timberline high def color (if cool roof required): shakewood built-up roofing assembly system number per attached listing report (if applicable): n a specific exemption from cool roof requirements (if applicable): r-38 blown insulation required building inspector field verification (if applicable): letter note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: November 12, 2014 Value: $21,941 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: December 4, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd no. Of modules: 6 no. Of inverters:6 micro inverters total system size in kilowatts: 1. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 24, 2012 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: February 22, 2012 | Permit id: Pds2012-1031-20 | |||||
Electrical meter reset for forclosed house. Date: August 8, 2011 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: August 12, 2011 | Permit id: Pds2011-1007-20 | |||||
3700sqft re-roof () for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingles proposed roofing material comp shingles manufacturer gaf brand and model timberline high def color (if cool roof required) shakewood built-up roofing assembly system number per attached listing report (if applicable) n/a specific exemption from cool roof requirements (if applicable) r-38 blown insulation required building inspector field verification (if applicable) letter note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: November 12, 2014 Value: $21,941 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 4, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd no. Of modules 6 no. Of inverters 6 micro inverters total system size in kilowatts 1. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 24, 2012 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 22, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 93 3700sqft re-roof () for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingles proposed roofing material comp shingles manufacturer gaf brand and model timberline high def color (if cool roof required) shakewood built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) r-38 blown insulation required building inspector field verification (if applicable) letter note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 4, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules 6 no. Of inverters 6 micro inverters total system size in kilowatts 1. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 24, 2012 Contractor: Sungate Energy Solutions Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 22, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 77 Electrical meter reset for forclosed house. Date: August 8, 2011 Contractor: M J Kennedy Electric Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 12, 2011 | Permit id: Pds2011-1007-20 | |||||
Final Date: December 2, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Final Date: February 17, 2012 Permit status: Pass | Permit id: Pds2012-1031-20 | |||||
Final Date: August 10, 2011 Permit status: Pass | Permit id: Pds2011-1007-20 |