Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Bora- 28 sqft re-roof for existing 4 condo buildings (total 112 sqft). See all clearances under pds 2015-cmaspc-000035. Bldg 22- address 3645 avocado village ct if a re-roof project is proposed, the following specifications apply. Existing roofing material bur proposed roofing material everguard mil tpo manufacturer gaf brand and model everguard color (if cool roof required) n a built-up roofing assembly system number per attached listing report (if applicable) esr-1597 specific exemption from cool roof requirements (if applicable) low or steep sloped roof w no ducts in the attic required building inspector field verification (if applicable) inspector to verify the substrate is non-combustible in order to meet class "a" roofing note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: December 16, 2015 | Permit id: Pds2015-Comalt- |