Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv & service upgrade to 2 amps for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 6 6 14--plan change--per jsf,changed module layout on roof(sheet 2)--lv Date: April 2, 2014 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: September 19, 2014 | Permit id: Pds2014-Resalt- | |||||
2 amp meter panel Date: January 14, 2014 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: April 25, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv & service upgrade to 2 amps for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 6/6/14--plan change--per jsf,changed module layout on roof(sheet 2)--lv Date: April 2, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 19, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 12, 2016 Contractor: Air Makers Heating And Air Conditioning Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 27, 2016 Contractor: M N Mauzy Mechanical Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Final Date: September 18, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- |