Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 New emergency generator (with enclosure) and 3-phase equipment; one new emergency distribution panel board will be install in room for critical computer loads; a new gas line will be installed to new generator. Date: May 16, 2013 Contractor: Blakeslee Electric Inc Permit status: Finaled | Permit id: B13-1066 | |||||
SCORE 66 Convert portions of office (2003) and waiting room (2004) areas into a new pharmacy room (2003) in existing vista family health center, 2nd floor. Date: February 9, 2015 Contractor: Bailey Dave Construction Inc Permit status: Issued | Permit id: B15-0112 | |||||
Two sets of interior illuminated individual letters - "vista family health center". Date: April 16, 2013 Permit status: Finaled | Permit id: B13-1207 | |||||
SCORE 56 Connect coffee cart to plumbing Date: October 21, 2014 Contractor: Tinnin Blake Permit type: Plumbing | Permit status: Finaled | Permit id: B14-4250 | |||||
SCORE 56 Add entry awning, aed design review. Date: January 4, 2012 Contractor: Benjamins Pacific Trends Permit status: Finaled | Permit id: B12-0028 | |||||
SCORE 66 Convert portions of office (2003) and waiting room (2004) areas into a new pharmacy room (2003) in existing vista family health center, 2nd floor. Permit type: Non-residential addition-alteration | Permit status: Finaled | Current use: Non-residential | Permit id: B15-0112 | Parcel: 173020011 |