Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 60 Fence permit for 66 by 66 garden area to be enclosed with a 7 high chan link fence. Date: March 22, 2006 Contractor: Arbor Fence Company Inc Client: Calvary Mount | Applicant: Arbor Fence Company, Inc. | Permit type: Fence | Permit status: Cmp | Completion date: February 11, 2007 | Current use: Religious assem | |||||
SCORE 91 R r 35 l. F. Of sidewalk Date: November 8, 2001 Contractor: Crall And Bowes Inc Client: Calvary Mount | Applicant: Crall & Bowes, Inc. | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Install one new hydraulic elevator. Date: September 26, 2001 Contractor: Thyssenkrupp Elevator Client: Mount Calvary Evangelical | Applicant: Thyssenkrupp Elevator | Permit type: Elevator | Permit status: Cls | Current use: Religious assem | |||||
SCORE 62 Fire alarm system Date: September 19, 2001 Contractor: Shamrock Electric Company Inc Client: Mount Calvary Evangelical | Applicant: Shamrock Electric Company, Inc | Permit type: Fire | Permit status: N&v | Current use: Religious assem | |||||
SCORE 99 Install new telecommunications facility at mt. Calvary lutheran church. Client: Mount Calvary Evangelical | Applicant: James Moore | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 8, 2002 | Current use: Telecommunicati | |||||
SCORE 95 Fire sprinkler system Date: May 4, 2001 Contractor: Code Fire Llc Client: Calvary Mount | Applicant: Code Fire Llc | Permit type: Fire | Permit status: N&v | Current use: Religious assem | |||||
SCORE 70 Parcial demo Date: March 5, 2001 Contractor: Newcastle Construction Service Client: Calvary Mount | Applicant: Newcastle Construction Service | Permit type: Demolition | Permit status: N&v | Current use: Religious assem | |||||
SCORE 70 Demolition of existing one story office classroom building on south side of sanctuary ( - 4,513 s. F.) and replace with larger two story addition ( - 9,572 s. F.) to the existing mt. Calvary lutheran church. Total square footage including addition, existing sanctuary, and basement under sanctuary = 19,649 s. F. Client: Calvary Mount | Applicant: Newcastle Construction Service | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 10, 2002 | Current use: Religious assem | |||||
SCORE 96 Temporary office trailer for church office during construction. Client: Calvary Mount | Applicant: Lord & Reynolds Elec Cont Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Religious assem | |||||
SCORE 56 Regrade parking lot, installation of concrete curb, new asphalt, and install landscape Date: September 19, 2007 Contractor: Steve Schumacher Client: Calvary Mount | Applicant: Steve Schumacher | Permit type: Grading | Permit status: Cmp | Completion date: August 28, 2008 | Current use: Religious assem | |||||
SCORE 64 Installation of six electric light poles. Date: November 8, 2007 Contractor: Productive Electric Llc Client: Calvary Mount | Applicant: Productive Electric Llc | Permit type: Electrical | Permit status: Cmp | Completion date: April 24, 2008 | Current use: Religious assem | |||||
SCORE 64 Underground electric only for future lightpoles see pmt2007-04269. Date: October 24, 2007 Contractor: Productive Electric Llc Client: Calvary Mount | Applicant: Productive Electric Llc | Permit type: Electrical | Permit status: N&v | Current use: Religious assem | |||||
SCORE 100 Tear-off & reroof of a religious assembly, squares on a pitches represented as inchlow slopeinch (less than 2 12) and 6 12. No overlay allowed, approved per the 2006 ibc and 1981 brc as amended. Shingles to comply with astm d 225 or 3462 and astm d 3161 class f. Mid-roof inspection required. Positive drainage required on flat area. Date: November 16, 2011 Contractor: Boulder Roofing Inc Client: Calvary Mount | Applicant: Boulder Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2012 | Current use: Religious assem | |||||
Cell phone equipment on exiting bldg(withdrawn-not in county) Date: July 18, 2001 Permit type: Electrical service change | Permit status: Withdrawn | Permit id: Bp-01-1234 | |||||
SCORE 95 Install one new three stop hydraulic elevator. Client: Mount Calvary Evangelical | Permit type: Building | Permit status: Cls | Current use: Religious assembly, existing | Permit id: Pmt2001-04212 | |||||
SCORE 70 Demolition of existing one story office classroom building on south side of sanctuary (+ - 4,513 s. F.) and replace with larger two story addition (+ - 9,572 s. F.) to the existing mt. Calvary lutheran church. Total square footage including addition, existing sanctuary, and basement under sanctuary = 19,649 s. F. Client: Calvary Mount | Permit type: Building, electrical, mechanical, plumbing, elevator | Permit status: Cmp | Completion date: June 10, 2002 | Current use: Religious assembly, addition and remodel | Permit id: Pmt2001-00095 | |||||
SCORE 96 Temporary office trailer for church office during construction. Client: Calvary Mount | Permit type: Building, electrical | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2001-00097 | |||||
SCORE 95 Fire sprinkler system Client: Calvary Mount | Permit type: Fire | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2001-01713 | |||||
SCORE 89 Install new telecommunications facility at mt. Calvary lutheran church. Client: Mount Calvary Evangelical | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 8, 2002 | Current use: Telecommunications, alteration | Permit id: Pmt2001-03095 | |||||
SCORE 62 Fire alarm system Client: Mount Calvary Evangelical | Permit type: Fire | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2001-04125 | |||||
SCORE 78 R r 35 l. F. Of sidewalk Date: November 8, 2001 Contractor: Crall And Bowes, Inc Client: Calvary Mount | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2001-04941 | |||||
Regrade parking lot, installation of concrete curb, new asphalt, and install landscape Date: September 20, 2007 Value: $220 Client: Calvary Mount | Permit type: Grading | Permit status: Cmp | Completion date: August 28, 2008 | Current use: Religious assembly, existing | Permit id: Pmt2007-03908 | |||||
SCORE 95 Tear-off & reroof of a religious assembly, squares on a pitches represented as inchlow slopeinch (less than 2 12) and 6 12. No overlay allowed, approved per the 2006 ibc and 1981 brc as amended. Shingles to comply with astm d 225 or 3462 and astm d 3161 class f. Mid-roof inspection required. Positive drainage required on flat area. Client: Calvary Mount | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2012 | Current use: Religious assembly, existing | Permit id: Pmt2011-05026 | |||||
SCORE 60 Fence permit for 66foot by 66foot garden area to be enclosed with a 7foot high chan link fence. Client: Calvary Mount | Permit type: Fence | Permit status: Cmp | Completion date: February 11, 2007 | Current use: Religious assembly, existing | Permit id: Pmt2006-00968 | |||||
Regrade parking lot, installation of concrete curb, new asphalt, and install landscape Date: September 20, 2007 Value: $220,000 Client: Calvary Mount | Permit type: Grading | Permit status: Cmp | Completion date: August 28, 2008 | Current use: Religious assembly, existing | Permit id: Pmt2007-03908 | |||||
SCORE 64 Installation of six electric light poles. Client: Calvary Mount | Permit type: Electrical | Permit status: Cmp | Completion date: April 24, 2008 | Current use: Religious assembly, existing | Permit id: Pmt2007-04269 | |||||
SCORE 64 Underground electric only for future lightpoles see pmt2007-04269. Client: Calvary Mount | Permit type: Electrical | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2007-04767 |