Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 1 water closet; 1 lavatory; 11 floor sinks; 9 floor drains; 1 electric water heater; 1 service sink Date: November 27, 2013 Contractor: Maxair Inc Permit type: Plumbing | Permit status: Aca pending | Permit id: Bp-201304111 | |||||
SCORE 86 7 wshps; 5 e. F. S; 1 electric duct heater; duct alterations Date: November 27, 2013 Contractor: Maxair Inc Permit type: Hvac | Permit status: Aca pending | Permit id: Bm-201303527 | |||||
SCORE 86 Low voltagecommercial addition to the fire alarm system Date: November 15, 2013 Contractor: Convergant Technologies Permit type: Low voltage | Permit status: Issued | Permit id: Be-201309750 | |||||
SCORE 86 Electrical installation Date: November 14, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201309704 | |||||
SCORE 86 Add and relocate fire sprinkler heads per code . Date: November 13, 2013 Contractor: Advantage Fire Sprinkler Company Inc Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201303954 | |||||
SCORE 80 Av system integration Date: November 6, 2013 Contractor: Technical Innovations Llc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201309375 | |||||
SCORE 86 Addition to the fire alarm system- Date: November 6, 2013 Contractor: Convergant Technologies Permit type: Low voltage | Permit status: Issued | Permit id: Be-201309415 | |||||
SCORE 86 Add low voltage for voice data & cabling- Date: November 5, 2013 Contractor: American Telecommunications Serv Inc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201309363 | |||||
SCORE 86 10th floor permit carter - jimmy jones 404 695 25112 Date: November 4, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201309298 | |||||
SCORE 86 Electrical interior renovaton & demo level 17 phase 4 jimmy jones 404 695 2512 Date: November 1, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201309227 | |||||
SCORE 86 Electrical installation of interior renovation & demo level 19th phase 4 jimmy jones 404 695 2512 Date: November 1, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201309229 | |||||
SCORE 86 Electrical installation of interior renovation and demo level 18 phase 4 jimmy jones 404 695 2512 Date: November 1, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201309228 | |||||
SCORE 86 Install wire for hvac interior renovations & demo level 17 phase 4 Date: October 31, 2013 Contractor: Envisage Automated Security Permit type: Low voltage | Permit status: Issued | Permit id: Be-201309194 | |||||
SCORE 86 5 pius; 6 vavs; 1 wshp; 1 cwp; 1 exhaust fan Date: October 24, 2013 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201303096 | |||||
SCORE 86 4 pius; 6 vavs; 1 wshp; 1 cwp; 1 exhaust fan; 1 vent fan; duct alterations Date: October 24, 2013 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201303097 | |||||
SCORE 86 3 sinks; 3 water heaters; 2 floor drains; 2 hub drains Date: October 24, 2013 Contractor: Maxair Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201303695 | |||||
SCORE 86 2 sinks; 2 water heaters; 2 floor drains; 2 hub drains Date: October 24, 2013 Contractor: Maxair Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201303696 | |||||
SCORE 86 4 pius; 5 vavs; 1 wshp; 1 cwp; 1 exhaust fan; 1 vent fan; duct alterations Date: October 24, 2013 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201303098 | |||||
Add and relocate sprinkler heads to local and state code. Date: October 24, 2013 Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201303693 | |||||
SCORE 86 Interior alterations only. Ground floor Date: October 14, 2013 Contractor: Choate Construction Co Permit type: Conversion | Permit status: Issued | Permit id: Bb-201305750 | |||||
SCORE 86 Install low voltage for control wire for hvac controls- Date: September 24, 2013 Contractor: Envisage Automated Security Permit type: Low voltage | Permit status: Issued | Permit id: Be-201307890 | |||||
SCORE 86 Interior renovations & demo level 19 phase 4 Date: September 24, 2013 Contractor: Choate Construction Co Permit type: Alteration | Permit status: Issued | Permit id: Bb-201305365 | |||||
SCORE 86 Interior renovations & demo level 17 phase 4 Date: September 24, 2013 Contractor: Choate Construction Co Permit type: Alteration | Permit status: Issued | Permit id: Bb-201305363 | |||||
SCORE 86 Adding 4 vavs and 1 piu. Duct alterations as well Date: September 20, 2013 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201302727 | |||||
SCORE 80 Audio visual work for several rooms Date: September 18, 2013 Contractor: Technical Innovations Llc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201307784 | |||||
SCORE 86 Electrical installation of extisting interior commercial renovation 20th floor Date: September 18, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201307732 | |||||
SCORE 86 Electrical installation of existing 10th floor common corridor-elevator lobby jimmy jones 404 695 2512 Date: September 18, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201307730 | |||||
SCORE 86 Adding 6 vavs,4 pius 1 water source heat pump and 1 exaust fan. Duct alteractions as well Date: September 17, 2013 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201302668 | |||||
SCORE 86 Adding 3 electric water heaters Date: September 17, 2013 Contractor: Maxair Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201303155 | |||||
Carters retail, inc administrative office Date: August 30, 2013 Permit type: License | Permit status: License approved | Permit id: Zla-201304679 | |||||
SCORE 86 Renovation to the 10th floor common corridor-elevator lobby Date: August 28, 2013 Contractor: Choate Construction Co Permit type: Commercial | Permit status: Create application | Permit id: Qcr-2013-01972 | |||||
SCORE 86 Suite 40 low voltage commercial Date: August 16, 2013 Contractor: Convergant Technologies Permit type: Low voltage | Permit status: Issued | Permit id: Be-201306663 | |||||
SCORE 86 Add low voltage for addition to the fire alarm system- Date: August 14, 2013 Contractor: Convergant Technologies Permit type: Low voltage | Permit status: Issued | Permit id: Be-201306555 | |||||
SCORE 86 Interior commerical renovation Date: August 12, 2013 Contractor: Choate Construction Co Permit type: Commercial | Permit status: Create application | Permit id: Qcr-2013-01768 | |||||
SCORE 80 Av conference room work Date: August 8, 2013 Contractor: Technical Innovations Llc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201306369 | |||||
SCORE 86 Add low voltage for control wiring for hvac - Date: August 8, 2013 Contractor: Envisage Automated Security Permit type: Low voltage | Permit status: Issued | Permit id: Be-201306380 | |||||
SCORE 86 Electrical work-low voltage low voltage access control & cameras 22,5 sq ft Date: August 8, 2013 Contractor: Innovative Electronic Control Systems Permit type: Low voltage | Permit status: Issued | Permit id: Be-201306388 | |||||
SCORE 80 Conference room av work Date: August 8, 2013 Contractor: Technical Innovations Llc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201306362 | |||||
SCORE 86 Electrical work-low voltage low voltage access control & cameras 2,211 sq ft Date: August 8, 2013 Contractor: Innovative Electronic Control Systems Permit type: Low voltage | Permit status: Issued | Permit id: Be-201306386 | |||||
SCORE 86 Duct alterations, adding vavs pius whsps and exaust fans Date: August 7, 2013 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201302153 | |||||
SCORE 86 Electrical work-low voltage voice & data cabling 22,5 sq ft Date: August 7, 2013 Contractor: American Telecommunications Serv Inc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201306304 | |||||
SCORE 86 Duct alterations, adding vav piu wshps and exaust fans Date: August 7, 2013 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201302151 | |||||
SCORE 86 Electrical installation interior office build out 3rd floor jimmy jones 404 695 6212 Date: August 6, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201306272 | |||||
SCORE 86 Electrical installation 4th floor interior office build-out Date: August 6, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201306273 | |||||
SCORE 86 Electrical installation interior renovation to the p311 - jimmy jones 404 695 - 2512 Date: August 6, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201306270 | |||||
SCORE 86 Electrcial installation 6th floor interior office build out Date: August 6, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201306276 | |||||
SCORE 86 Add sinks Date: August 5, 2013 Contractor: Maxair Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201302590 | |||||
Continuity benefits llc - sales of voluntary benefits Date: July 26, 2013 Permit type: License | Permit status: License approved | Permit id: Zla-201304075 | |||||
SCORE 86 Stair opening for evel 18th and level 19th Date: July 2, 2013 Contractor: Choate Construction Co Permit type: Alteration | Permit status: Issued | Permit id: Bb-201303641 | |||||
SCORE 86 Interior office build-out. Date: July 1, 2013 Contractor: Choate Construction Co Permit type: Alteration | Permit status: Co issued | Permit id: Bb-201303611 | |||||
SCORE 86 Hvac commerical 3 wshp 3 fans Date: June 12, 2013 Contractor: J.R. Nichols Co Permit type: Hvac | Permit status: Issued | Permit id: Bm-201301524 | |||||
SCORE 78 Plumbingcommercial Date: June 3, 2013 Contractor: Belco Plumbing Services Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201301729 | |||||
SCORE 86 Add lights, add fans, add outlet, add panel, add switches Date: May 29, 2013 Contractor: Pirkle Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201304160 | |||||
SCORE 86 Hvac work-two fire dampers Date: March 21, 2013 Contractor: J.R. Nichols Co Permit type: Hvac | Permit status: Issued | Permit id: Bm-201300759 | |||||
SCORE 86 3438 peachtree rd ne - low voltage---fire alarm tenant buildout scope of work: interior alteration on an existing office building for property management new office location on suite 230. Date: March 18, 2013 Contractor: Convergant Technologies Permit type: Low voltage | Permit status: Issued | Permit id: Be-201302196 | |||||
SCORE 86 Electrical installation of interior alterations on an existing office building for property managment new office located in ste 230 Date: March 12, 2013 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201301998 | |||||
SCORE 95 Tenant fire sprinkler improvement Date: March 8, 2013 Contractor: Century Fire Protection Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201300771 | |||||
SCORE 86 3438 peachtree rd - hvac--duct alteration scope of work: interior alteration on an existing office building for property management new office location on suite 230. Date: March 7, 2013 Contractor: J.R. Nichols Co Permit type: Hvac | Permit status: Issued | Permit id: Bm-201300602 | |||||
Add and relocate sprinkler heads to local and state code in storage room. Date: March 6, 2013 Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201300733 | |||||
SCORE 86 Storage space on level p3 Date: February 25, 2013 Contractor: Foley Construction Corp Permit type: Alteration | Permit status: No co required | Permit id: Bb-201300967 | |||||
SCORE 82 Add and relocate sprinkler heads per code. Date: January 7, 2013 Contractor: Advantage Fire Sprinkler Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201300058 | |||||
SCORE 86 Electrical installation chris norris 404 391 9005 suite 950 Date: December 27, 2012 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201210187 | |||||
SCORE 59 Renovation of cubicles on north side of bldg. New cabling for new cubicles Date: December 27, 2012 Contractor: The New Century Group Inc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201210184 | |||||
SCORE 86 Electrical installation interior commercial renovation ste 1100 chris norris Date: December 27, 2012 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201210188 | |||||
SCORE 93 3 new terminal units Date: December 20, 2012 Contractor: Mckenneys Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201203526 | |||||
SCORE 86 This project involves interior fit-up only with no modifications to base building or shell egress. Date: November 14, 2012 Contractor: Foley Construction Corp Permit type: Alteration | Permit status: No co required | Permit id: Bb-201205651 | |||||
SCORE 86 Interior commercial renovation Date: November 13, 2012 Contractor: Humphries And Company Llc Permit type: Alteration | Permit status: Issued | Permit id: Bb-201205628 | |||||
SCORE 97 Installation of voice and data cabling. Date: November 2, 2012 Contractor: Robert Permit type: Low voltage | Permit status: Issued | Permit id: Be-201208889 | |||||
SCORE 86 Upgrade to existing fire alarm system. Date: November 2, 2012 Contractor: Convergant Technologies Permit type: Low voltage | Permit status: Issued | Permit id: Be-201208857 | |||||
SCORE 86 Electrical interior commercial renovation chris norris Date: October 30, 2012 Contractor: Allisonsmith Company Llc Permit type: Electrical | Permit status: Issued | Permit id: Be-201208779 | |||||
SCORE 93 Costar atlanta 15th floor plumbing permit. Installing plumbing fixtures, water heater, filters, and etc. Date: October 18, 2012 Contractor: Mckenneys Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201203526 | |||||
SCORE 93 Costar 15th floor hvac permit for exhaust fans, air distribution, terminal units, water source heat pumps and etc Date: October 18, 2012 Contractor: Mckenneys Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201202955 | |||||
SCORE 86 Tenant fire alarm build-out Date: August 6, 2012 Contractor: Convergant Technologies Permit type: Low voltage | Permit status: Issued | Permit id: Be-201206349 | |||||
Add and relocate sprinkler heads to local and state code. Date: August 3, 2012 Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201202660 | |||||
SCORE 78 Alteration of break sink- Date: August 1, 2012 Contractor: Belco Plumbing Services Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201202615 | |||||
Investment banking Date: July 23, 2012 Permit type: License | Permit status: Closed | Permit id: Zla-201202836 | |||||
SCORE 86 1 new exhaust fan, 1 new vav Date: May 16, 2012 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201201372 | |||||
SCORE 99 Add and relocate sprinkler heads to local and state code (childs advisory partners) - suite 1400 Date: May 15, 2012 Contractor: Century Fire Protection Llc Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201201722 | |||||
SCORE 79 Electrical installation - tenant buildout with power and lighting chris norris 404 391 9005 suite 1400 Date: May 9, 2012 Contractor: Allison Smith Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201203783 | |||||
SCORE 73 Voice and data cabling (childs advisory partners) - suite 1400 bb-201201709 Date: May 3, 2012 Contractor: Net Comm Llc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201203619 | |||||
SCORE 78 Renovations to break room- Date: May 1, 2012 Contractor: Belco Plumbing Services Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201201548 | |||||
Illegal sign (general advertising) aka 35 peachtree rd Date: April 16, 2012 Permit type: Na | Permit status: No violation found | Permit id: 12cap-00000328 | |||||
SCORE 94 Interior demolition & interior buildout & finish (childs advisory partners) - suite 1400 Date: April 9, 2012 Contractor: Foley Construction Permit type: Alteration | Permit status: Co issued | Permit id: Bb-201201709 | |||||
SCORE 62 Add low voltage for video, security, card access and paging- Date: March 26, 2012 Contractor: Global Electronics Permit type: Low voltage | Permit status: Issued | Permit id: Be-201202396 | |||||
SCORE 86 Duct alterations Date: March 14, 2012 Contractor: J.R. Nichols Co Permit type: Hvac | Permit status: Issued | Permit id: Bm-201200745 | |||||
SCORE 59 Add low voltage for voice and data cabling- Date: March 13, 2012 Contractor: The Service Group Inc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201202043 | |||||
SCORE 86 5 pius, 4 efs, 1 wshp, relocating existing units, ductwork Date: March 8, 2012 Contractor: Maxair Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201200700 | |||||
SCORE 79 Electrical permit the japanese consulate 8th floor #850 Date: March 5, 2012 Contractor: Allison Smith Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201201791 | |||||
SCORE 78 Plumbing work Date: February 29, 2012 Contractor: Belco Plumbing Services Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201200710 | |||||
SCORE 99 Fire sprinkler improvement to suite #850 Date: February 23, 2012 Contractor: Century Fire Protection Llc Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201200638 | |||||
SCORE 86 Rework existing sprinkler system for new tenant. Date: September 15, 2011 Contractor: Advantage Fire Sprinkler Company Inc Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201102662 | |||||
Communication skills instruction Date: September 15, 2011 Permit type: License | Permit status: Closed | Permit id: Zla-201103554 | |||||
SCORE 86 Install lov voltage cabling. Date: September 14, 2011 Contractor: Lmi Electrical Contracting Permit type: Low voltage | Permit status: Issued | Permit id: Be-201106596 | |||||
SCORE 65 Break room sink addition- Date: September 7, 2011 Contractor: Crawford Plumbing Co Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201102543 | |||||
SCORE 86 Ductwork modifications; air distribution Date: September 2, 2011 Contractor: J.R. Nichols Co Permit type: Hvac | Permit status: Issued | Permit id: Bm-201102114 | |||||
Software consulting Date: August 31, 2011 Permit type: License | Permit status: Closed | Permit id: Zla-201103379 | |||||
SCORE 86 Add lights, add outlets, connect (2) hvac, add (2) meters, add (1) lot of branch circuits Date: August 31, 2011 Contractor: Pirkle Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201106237 | |||||
SCORE 86 Interior finish of 1st generation office space for a new tenant Date: August 15, 2011 Contractor: Kinzey Construction Company Inc Permit type: Alteration | Permit status: Co issued | Permit id: Bb-201103740 |