Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 New swimming pool spa Date: July 10, 2008 Contractor: Ty Davis Permit type: Electrical permit | Permit status: Final | Completion date: April 7, 2009 | Expiration date: April 7, 2009 | Permit id: 2007-117202 Ep | |||||
SCORE 100 New swimming pool spa Date: April 10, 2009 Contractor: Reinaldo Mojica Permit type: Plumbing permit | Permit status: Final | Completion date: April 24, 2009 | Expiration date: April 24, 2009 | Permit id: 2007-117202 Pp | |||||
SCORE 99 New sf res Permit type: Building permit | Permit status: Final | Completion date: March 2, 2009 | Expiration date: March 2, 2009 | Permit id: 2007-108316 Bp | |||||
SCORE 99 New 2 story det gar with apt Applicant Phone: (512) 845-7309 | Permit type: Building permit | Permit status: Final | Completion date: February 23, 2009 | Expiration date: February 23, 2009 | Permit id: 2007-108317 Bp | |||||
SCORE 99 Install new residential driveway approach sidewalkper contractor there should no be sidewalk will advise general contractor to have sidewalk removed from bp and ds lv 121008removed sidewalk requirement due to permitting prior to 022508jtrnew sf res Date: December 10, 2008 Contractor: Pilgrim Building Company Permit type: Driveway / sidewalks | Permit status: Final | Completion date: March 2, 2009 | Expiration date: August 25, 2009 | Permit id: 2007-108316 Ds | |||||
SCORE 99 New sf res Date: June 13, 2007 Contractor: Pilgrim Building Company Permit type: Electrical permit | Permit status: Final | Completion date: February 17, 2009 | Expiration date: February 17, 2009 | Permit id: 2007-108316 Ep | |||||
SCORE 99 New sf res Date: February 5, 2008 Contractor: Pilgrim Building Company Permit type: Mechanical permit | Permit status: Final | Completion date: February 26, 2009 | Expiration date: February 26, 2009 | Permit id: 2007-108316 Mp | |||||
SCORE 99 New 2 story det gar with apt Date: June 13, 2007 Contractor: Pilgrim Building Company Permit type: Electrical permit | Permit status: Final | Completion date: February 10, 2009 | Expiration date: February 10, 2009 | Permit id: 2007-108317 Ep | |||||
SCORE 99 New 2 story det gar with apt Date: February 5, 2008 Contractor: Pilgrim Building Company Permit type: Mechanical permit | Permit status: Final | Completion date: February 23, 2009 | Expiration date: February 23, 2009 | Permit id: 2007-108317 Mp | |||||
SCORE 99 Remodel to enclose covered porch 199 sq ft Permit type: Building permit | Permit status: Final | Completion date: February 23, 2009 | Expiration date: February 23, 2009 | Permit id: 2008-0362 Bp | |||||
SCORE 100 New swimming pool spa Permit type: Building permit | Permit status: Final | Completion date: April 24, 2009 | Expiration date: April 24, 2009 | Permit id: 2007-117202 Bp | |||||
SCORE 96 Partial demolition included additionremodel to convert 200sf of existing 1sf floor conditioned area to 200sf of covered patio area remodel of existing 2nd floor master bedroom suite includes bedroom bathroom study and closet and adding a sliding glass panel door at the first floor family room Date: July 16, 2014 Contractor: Timothy D York Permit type: Electrical permit | Permit status: Final | Completion date: November 12, 2014 | Expiration date: November 12, 2014 | Permit id: 2014-053082 Ep | |||||
SCORE 99 Partial demolition included additionremodel to convert 200sf of existing 1sf floor conditioned area to 200sf of covered patio area remodel of existing 2nd floor master bedroom suite includes bedroom bathroom study and closet and adding a sliding glass panel door at the first floor family room Date: July 15, 2014 Contractor: Brian Trent Christianson Permit type: Plumbing permit | Permit status: Final | Completion date: November 13, 2014 | Expiration date: November 13, 2014 | Permit id: 2014-053082 Pp | |||||
SCORE 100 Partial demolition included additionremodel to convert 200sf of existing 1sf floor conditioned area to 200sf of covered patio area remodel of existing 2nd floor master bedroom suite includes bedroom bathroom study and closet and adding a sliding glass panel door at the first floor family room Date: July 16, 2014 Contractor: John Wrigley Permit type: Mechanical permit | Permit status: Final | Completion date: November 13, 2014 | Expiration date: November 13, 2014 | Permit id: 2014-074624 Mp | |||||
SCORE 100 Line side tap to exist res Date: August 20, 2014 Contractor: Norberto Martinez Permit type: Electrical permit | Permit status: Expired | Expiration date: February 16, 2015 | Permit id: 2014-088715 Ep | |||||
SCORE 100 Install new solar electrical system to res only Date: September 12, 2014 Contractor: Norberto Martinez Permit type: Electrical permit | Permit status: Final | Completion date: October 16, 2014 | Expiration date: October 16, 2014 | Permit id: 2014-097874 Ep | |||||
SCORE 99 Partial demolition included additionremodel to convert 200sf of existing 1sf floor conditioned area to 200sf of covered patio area remodel of existing 2nd floor master bedroom suite includes bedroom bathroom study and closet and adding a sliding glass panel door at the first floor family room Applicant Phone: (512) 289-2400 | Permit type: Building permit | Permit status: Final | Completion date: December 3, 2014 | Expiration date: December 3, 2014 | Permit id: 2014-053082 Bp | |||||
Install irrigation system to exst res Date: February 5, 2009 Permit type: Plumbing permit | Permit status: Final | Completion date: February 19, 2009 | Expiration date: February 19, 2009 | Permit id: 2009-008358 Pp | |||||
SCORE 99 Partial demolition included additionremodel to convert 200sf of existing 1sf floor conditioned area to 200sf of covered patio area remodel of existing 2nd floor master bedroom suite includes bedroom bathroom study and closet and adding a sliding glass panel door at the first floor family room Date: July 15, 2014 Contractor: Brian Trent Christianson Permit type: Plumbing permit | Permit status: Final | Completion date: November 13, 2014 | Expiration date: November 13, 2014 | Permit id: 2014-053082 Pp | |||||
SCORE 99 New swimming pool spa Permit type: Building permit | Permit status: Final | Completion date: April 24, 2009 | Expiration date: April 24, 2009 | Permit id: 2007-117202 Bp | |||||
SCORE 100 New swimming pool spa Date: July 10, 2008 Contractor: Ty Davis Permit type: Electrical permit | Permit status: Final | Completion date: April 7, 2009 | Expiration date: April 7, 2009 | Permit id: 2007-117202 Ep | |||||
SCORE 56 Replace cabinets and countertops remove existing prefab shower and all tile at pool bath patch ceiling and walls where existing light fixtures are removed relocated replace tile install new under counter sink and faucet install new water filtration system and faucetreinstall existing garbage disposal with incounter push button controlrelocate dishwasher plumbing to new location on opposite side of sinkremove and reinstall plumbing fixtures at pool bathprovide a gas line for outdoor grillreplace two existing hot water heaters with tankless water heaterrelocate stacked washer and dryer to be side by side on same wall Applicant: Wendy Vickery | Applicant Phone: (512) 983-4942 | Permit type: Building permit | Permit status: Active | Expiration date: June 6, 2018 | Permit id: 2017-152625 Bp |