Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Permit is to create an office in the existing atrium lounge. Second floor, east end. (electrical) "fairhaven" - 2nd floor office interior remodeling: (7) outlets, (1) siwtch, (3) data outlet stub ups and (4) recesses can lights. P. O. #38291. Date: June 10, 2009 Contractor: Wilson Electric Co Client: Fairhaven Christian Retirement Center | Permit id: Elect20091139 | |||||
SCORE 93 2-6-12 sprinklers - 141 heads child permit fire suppressionfairhaven additions - chapel multi & health center. 1 story chapel multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Client: Fairhaven Christian Retirement Center | Permit id: Plum20111754 | |||||
SCORE 77 Permit is to create an office in the existing atrium lounge. Second floor, east end. Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20091153 | |||||
SCORE 93 Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20091108 | |||||
Deleted permit-duplicate (electrical) "fairhaven" - 2nd floor office interior remodeling: (7) outlets, (1) siwtch, (3) data outlet stub ups and (4) recesses can lights. P. O. #38291. Date: April 15, 2009 Value: $2,000 Permit id: Elect20091231 | |||||
Hvac permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Plan review paid 3/9/2009 inv 81271, check 33485, 52. 50.(1) makeup air unit 37 cfm, 375,0 btu (8) fans: (1) 80cfm, (1) 75cfm, (2) 2 cfm, (2) 28 cfm,(1) 12 cfm, (1) 17 cfm, (3) rooftop units: (1) 3ton/150,0 btu, (1) 8 ton/250,0 btu, (1) 16ton/400,0 btu Date: April 15, 2009 Client: Fairhaven Christian Retirement Center | Permit id: Mech20091249 | |||||
Permit is to create an office in the existing atrium lounge. Second floor, east end. Add (2) supply airs and (1) pass-through return air to temporary office Date: April 20, 2009 Client: Fairhaven Christian Retirement Center | Permit id: Mech20091312 | |||||
Gas piping. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. 2,009,0 btu commercial gas piping Date: April 28, 2009 Client: Fairhaven Christian Retirement Center | Permit id: Mech20091250 | |||||
Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. 1 wc, 1 lav, 1 eye wash, 1 mop sink, 3 prep sinks, 1-4 comp sink, 4 hand sinks, 2 hose stations,1 sillcok, 13 hub drains, fd, 6 floor sinks, wsfu# 55 Date: April 28, 2009 Client: Fairhaven Christian Retirement Center | Permit id: Plum20091121 | |||||
SCORE 89 (electrical) "fairhaven - addition & interior remodeling. Temporary kitchen while new kitchen is being completed. Ground floor and 1st floor, w,o,#16-58861. Phase i and phase ii. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Date: April 30, 2009 Contractor: Ballard Companies Inc Client: Fairhaven Christian Retirement Center | Permit id: Elect20091103 | |||||
Plumbing permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Plan review fee paid 3/9/2009, chk #33485, inv#81271, 52. 50. Fire suppression 20 sf, 42 hds Date: May 15, 2009 Client: Fairhaven Christian Retirement Center | Permit id: Plum20091120 | |||||
SCORE 96 Permit is to create an office in the existing atrium lounge. Second floor, east end. (electrical) "fairhaven" - 2nd floor office interior remodeling: (7) outlets, (1) siwtch, (3) data outlet stub ups and (4) recesses can lights. P. O. #38291. Date: June 10, 2009 Contractor: Wilson Electric Co Client: Fairhaven Christian Retirement Center | Permit id: Elect20091139 | |||||
Hoods permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Ansul fire system temp hood (phase 1) 7 nozzles Date: July 21, 2009 Client: Fairhaven Christian Retirement Center | Permit id: Mech20091251 | |||||
Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation.(1) 1 hp stand-alone cooler, (1) 4 hp stand-alone freezer, (1) 3/4 hp combo cooler, (1) 2 hp combo freezer Date: July 21, 2009 Permit id: Mech20091891 | |||||
Complete tear off and re-roof Date: April 7, 2010 Value: $109,000 Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20101217 | |||||
Fairhaven center building - 2nd floor renovation. Building plan review # 10-1013 Date: November 22, 2010 Value: $187,400 Client: Fairhaven Christian Center, Fairhaven | Permit id: Mulcom20101800 | |||||
(1) sh, (1) wc, (1) lav, (1) sink, (1) df, (2) fd Date: November 24, 2010 Value: $15,200 Client: Fairhaven Christian Center, Fairhaven | Permit id: Plum20102157 | |||||
SCORE 89 Fairhaven center building - 2nd floor renovation. - 1 amp feeder, lighting and power (wo #16-59395) Date: November 30, 2010 Contractor: Ballard Companies Inc Client: Fairhaven Christian Center, Fairhaven | Permit id: Elect20101812 | |||||
Ductwork(1) 10,2 btu, 425 cfm elec ceiling htrmodifications to rtu Date: December 3, 2010 Value: $41,478 Client: Fairhaven Christian Center, Fairhaven | Permit id: Mech20102445 | |||||
Re-route existing sewer on south side of building - outside the foot print of new addition. Date: August 2, 2011 Value: $15,000 Client: Fairhaven Christian Center, Fairhaven | Permit id: Plum20111760 | |||||
Fairhaven additions - chapel/multi & health center. New 85,3 btu electric heat air handler- ton cooling - 5,0 cfm; 3 rtu - 1- 150,0 btu -7. 5 ton, 2 - 250,0 btu - ton2 ductless split system cooling units 12,0 btu each - 1 ton3- electric wall heaters - 17,0 btu each5- vav boxes - 1- 90,0 btu elect heat, 2- 24,0 btu elect heat, 2- 8,0 btu hot water heat. 3 roof exhaust fans - 1 - 5 cfm, 1- 5 cfm, 1- cfm grilles & diffusersnew ductwork Date: October 13, 2011 Value: $318,500 Client: Fairhaven Christian Retirement Center | Permit id: Mech20112100 | |||||
SCORE 96 Electrical work per drawings submitted by larson & darbyfairhaven additions - chapel/multi & health center. 1 story chapel/multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Client: Fairhaven Christian Retirement Center | Permit id: Elect20111475 | |||||
Fairhaven additions - chapel/multi & health center. 6 water closet - 2 urinal - 4 lavatory - 3 hand sink - 2 prep sink - 1 drinking fountain - 4 floor drains child permit Date: October 17, 2011 Value: $80,000 Client: Fairhaven Christian Retirement Center | Permit id: Plum20111753 | |||||
2-6-12 sprinklers - 141 heads child permit fire suppressionfairhaven additions - chapel/multi & health center. 1 story chapel/multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Date: February 6, 2012 Value: $21,000 Client: Fairhaven Christian Retirement Center | Permit id: Plum20111754 | |||||
Fairhaven additions - chapel/multi & health center. 1 story chapel/multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Date: February 14, 2012 Client: Fairhaven Christian Retirement Center | Permit id: Mech20112101 | |||||
SCORE 56 5 aluminum fence in front yard, 4 chain link fence in side Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20121162 | |||||
SCORE 93 Demolish duplex and construct new parking lot, including fencing, lighting and landscaping Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20121161 | |||||
SCORE 89 New electrical service - 1 amps notes: add 6 parking lot lights Client: Fairhaven Christian Home | Permit id: Elect20121308 | |||||
SCORE 96 Fairhaven additions - chapel multi & health center. 1 story chapel multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Date: February 14, 2012 Contractor: Sabin, Michael Client: Fairhaven Christian Retirement Center | Permit id: Mech20112101 | |||||
SCORE 89 Fairhaven additions - chapel multi & health center. New 85,3 btu electric heat air handler- ton cooling - 5,0 cfm; 3 rtu - 1- 150,0 btu -7. 5 ton, 2 - 250,0 btu - ton2 ductless split system cooling units 12,0 btu each - 1 ton3- electric wall heaters - 17,0 btu each5- vav boxes - 1- 90,0 btu elect heat, 2- 24,0 btu elect heat, 2- 8,0 btu hot water heat. 3 roof exhaust fans - 1 - 5 cfm, 1- 5 cfm, 1- cfm grilles & diffusersnew ductwork Client: Fairhaven Christian Retirement Center | Permit id: Mech20112100 | |||||
SCORE 96 Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation.(1) 1 hp stand-alone cooler, (1) 4 hp stand-alone freezer, (1) 3/4 hp combo cooler, (1) 2 hp combo freezer Date: July 21, 2009 Contractor: Doonan Steve Permit id: Mech20091891 | |||||
SCORE 89 Hoods permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Ansul fire system temp hood (phase 1) 7 nozzles Date: July 21, 2009 Contractor: Bunk Tim Client: Fairhaven Christian Retirement Center | Permit id: Mech20091251 | |||||
SCORE 93 Gas piping. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. 2,009,0 btu commercial gas piping Date: April 28, 2009 Contractor: Brown Terry Client: Fairhaven Christian Retirement Center | Permit id: Mech20091250 | |||||
SCORE 89 Ductwork(1) 10,2 btu, 425 cfm elec ceiling htrmodifications to rtu Client: Fairhaven Christian Center, Fairhaven | Permit id: Mech20102445 | |||||
SCORE 96 Fairhaven additions - chapel/multi & health center. 1 story chapel/multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Date: February 14, 2012 Contractor: Sabin Michael Client: Fairhaven Christian Retirement Center | Permit id: Mech20112101 | |||||
SCORE 89 Complete tear off and re-roof Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20101217 | |||||
SCORE 93 2-6-12 sprinklers - 141 heads child permit fire suppressionfairhaven additions - chapel/multi & health center. 1 story chapel/multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Client: Fairhaven Christian Retirement Center | Permit id: Plum20111754 | |||||
SCORE 93 Re-route existing sewer on south side of building - outside the foot print of new addition. Client: Fairhaven Christian Center, Fairhaven | Permit id: Plum20111760 | |||||
SCORE 93 (1) sh, (1) wc, (1) lav, (1) sink, (1) df, (2) fd Client: Fairhaven Christian Center, Fairhaven | Permit id: Plum20102157 | |||||
SCORE 96 Fairhaven additions - chapel/multi & health center. 6 water closet - 2 urinal - 4 lavatory - 3 hand sink - 2 prep sink - 1 drinking fountain - 4 floor drains child permit Client: Fairhaven Christian Retirement Center | Permit id: Plum20111753 | |||||
SCORE 93 Plumbing permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Plan review fee paid 3/9/2009, chk #33485, inv#81271, 52. 50. Fire suppression 20 sf, 42 hds Date: May 15, 2009 Contractor: Automatic Fire Systems Inc Client: Fairhaven Christian Retirement Center | Permit id: Plum20091120 | |||||
SCORE 89 Fairhaven additions - chapel/multi & health center. New 85,3 btu electric heat air handler- ton cooling - 5,0 cfm; 3 rtu - 1- 150,0 btu -7. 5 ton, 2 - 250,0 btu - ton2 ductless split system cooling units 12,0 btu each - 1 ton3- electric wall heaters - 17,0 btu each5- vav boxes - 1- 90,0 btu elect heat, 2- 24,0 btu elect heat, 2- 8,0 btu hot water heat. 3 roof exhaust fans - 1 - 5 cfm, 1- 5 cfm, 1- cfm grilles & diffusersnew ductwork Client: Fairhaven Christian Retirement Center | Permit id: Mech20112100 | |||||
SCORE 56 Fairhaven center building - 2nd floor renovation. Building plan review # 10-1013 Client: Fairhaven Christian Center, Fairhaven | Permit id: Mulcom20101800 | |||||
SCORE 89 Permit is to create an office in the existing atrium lounge. Second floor, east end. Add (2) supply airs and (1) pass-through return air to temporary office Date: April 20, 2009 Contractor: Wilburn John Client: Fairhaven Christian Retirement Center | Permit id: Mech20091312 | |||||
SCORE 93 Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. 1 wc, 1 lav, 1 eye wash, 1 mop sink, 3 prep sinks, 1-4 comp sink, 4 hand sinks, 2 hose stations,1 sillcok, 13 hub drains, fd, 6 floor sinks, wsfu# 55 Date: April 28, 2009 Contractor: Brown Terry Client: Fairhaven Christian Retirement Center | Permit id: Plum20091121 | |||||
SCORE 93 Hvac permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Plan review paid 3/9/2009 inv 81271, check 33485, 52. 50.(1) makeup air unit 37 cfm, 375,0 btu (8) fans: (1) 80cfm, (1) 75cfm, (2) 2 cfm, (2) 28 cfm,(1) 12 cfm, (1) 17 cfm, (3) rooftop units: (1) 3ton/150,0 btu, (1) 8 ton/250,0 btu, (1) 16ton/400,0 btu Date: April 15, 2009 Contractor: Gastel Judd Client: Fairhaven Christian Retirement Center | Permit id: Mech20091249 | |||||
SCORE 89 Ductwork(1) 10,2 btu, 425 cfm elec ceiling htrmodifications to rtu Client: Fairhaven Christian Center, Fairhaven | Permit id: Mech20102445 | |||||
SCORE 93 Gas piping. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. 2,009,0 btu commercial gas piping Date: April 28, 2009 Contractor: Brown, Terry Client: Fairhaven Christian Retirement Center | Permit id: Mech20091250 | |||||
SCORE 93 Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. 1 wc, 1 lav, 1 eye wash, 1 mop sink, 3 prep sinks, 1-4 comp sink, 4 hand sinks, 2 hose stations,1 sillcok, 13 hub drains, fd, 6 floor sinks, wsfu# 55 Date: April 28, 2009 Contractor: Brown, Terry Client: Fairhaven Christian Retirement Center | Permit id: Plum20091121 | |||||
SCORE 89 Permit is to create an office in the existing atrium lounge. Second floor, east end. Add (2) supply airs and (1) pass-through return air to temporary office Date: April 20, 2009 Contractor: Wilburn, John Client: Fairhaven Christian Retirement Center | Permit id: Mech20091312 | |||||
SCORE 96 Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation.(1) 1 hp stand-alone cooler, (1) 4 hp stand-alone freezer, (1) 3 4 hp combo cooler, (1) 2 hp combo freezer Date: July 21, 2009 Contractor: Doonan, Steve Permit id: Mech20091891 | |||||
SCORE 93 Re-route existing sewer on south side of building - outside the foot print of new addition. Client: Fairhaven Christian Center, Fairhaven | Permit id: Plum20111760 | |||||
SCORE 93 (1) sh, (1) wc, (1) lav, (1) sink, (1) df, (2) fd Client: Fairhaven Christian Center, Fairhaven | Permit id: Plum20102157 | |||||
SCORE 56 Fairhaven center building - 2nd floor renovation. Building plan review # 10-1013 Client: Fairhaven Christian Center, Fairhaven | Permit id: Mulcom20101800 | |||||
SCORE 93 Plumbing permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Plan review fee paid 3 9 2009, chk #33485, inv#81271, 52. 50. Fire suppression 20 sf, 42 hds Date: May 15, 2009 Contractor: Automatic Fire Systems, Inc Client: Fairhaven Christian Retirement Center | Permit id: Plum20091120 | |||||
SCORE 96 Electrical work per drawings submitted by larson & darbyfairhaven additions - chapel multi & health center. 1 story chapel multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Client: Fairhaven Christian Retirement Center | Permit id: Elect20111475 | |||||
SCORE 89 Complete tear off and re-roof Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20101217 | |||||
SCORE 89 Hoods permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Ansul fire system temp hood (phase 1) 7 nozzles Date: July 21, 2009 Contractor: Bunk, Tim Client: Fairhaven Christian Retirement Center | Permit id: Mech20091251 | |||||
SCORE 96 Fairhaven additions - chapel multi & health center. 6 water closet - 2 urinal - 4 lavatory - 3 hand sink - 2 prep sink - 1 drinking fountain - 4 floor drains child permit Client: Fairhaven Christian Retirement Center | Permit id: Plum20111753 | |||||
SCORE 93 Hvac permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Plan review paid 3 9 2009 inv 81271, check 33485, 52. 50.(1) makeup air unit 37 cfm, 375,0 btu (8) fans: (1) 80cfm, (1) 75cfm, (2) 2 cfm, (2) 28 cfm,(1) 12 cfm, (1) 17 cfm, (3) rooftop units: (1) 3ton 150,0 btu, (1) 8 ton 250,0 btu, (1) 16ton 400,0 btu Date: April 15, 2009 Contractor: Gastel, Judd Client: Fairhaven Christian Retirement Center | Permit id: Mech20091249 | |||||
SCORE 96 Permit is to create an office in the existing atrium lounge. Second floor, east end. (electrical) "fairhaven" - 2nd floor office interior remodeling: (7) outlets, (1) siwtch, (3) data outlet stub ups and (4) recesses can lights. P. O. #38291. Date: June 10, 2009 Contractor: Wilson Electric Co Client: Fairhaven Christian Retirement Center | Permit id: Elect20091139 | |||||
SCORE 89 (electrical) fairhaven - new emergency generator & transfer switches. W/o. #16-59170. Dwgs received 12/23/09. Approved by mb. Client: Fairhaven Christian Retirement Center | Permit id: Elect20091844 | |||||
SCORE 93 Fairhaven additions - chapel/multi & health center. 1 story chapel/multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20111505 | |||||
SCORE 93 Foundation only full permit: fairhaven additions - chapel/multi & health center. 1 story chapel/multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Client: Fairhaven Christian Retirement Center | Permit id: Mulcom20111576 | |||||
SCORE 93 Plumbing permit. Plan review 09-0211. Renovate the existing kitchen and expand it with a 2-story addition. The upper level provide kitchen prep space and the lower will provide storage. Construction will be phased for continuous kitchen operation. Plan review fee paid 3 9 2009, chk #33485, inv#81271, 52. 50. Fire suppression 20 sf, 42 hds Date: May 15, 2009 Contractor: Automatic Fire Systems, Inc Client: Fairhaven Christian Retirement Center | Permit id: Plum20091120 | |||||
SCORE 96 Electrical work per drawings submitted by larson & darbyfairhaven additions - chapel multi & health center. 1 story chapel multipurpose addition and related remodeling. 3 story health center addition and related remodeling. Building plan review 11-0802. Client: Fairhaven Christian Retirement Center | Permit id: Elect20111475 |