Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Replace forced air furnace and hot water heater in condo unit. Date: December 11, 2002 Contractor: Save Home Heat Co. Inc Client: Rett Ertl,Tatiana Ertl | Applicant: Save Home Heat Co., Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: March 25, 2003 | Current use: Multifamily dwe | |||||
SCORE 95 Replacement water heater Client: Annacorita Coloma | Permit type: Mechanical | Permit status: Iss | Current use: Single family attached dwelling, existin | Permit id: Pmt2017-20211 | |||||
SCORE 100 Replace forced air furnace and hot water heater in condo unit. Client: Rett Ertl | Permit type: Mechanical | Permit status: Cmp | Completion date: March 25, 2003 | Current use: Multifamily dwellings, existing | Permit id: Pmt2002-05249 | |||||
SCORE 100 Replace forced air furnace with 50,0 btu 80% furnace. Date: August 1, 2003 Contractor: H And M Mechanical Llc Client: Jami Hamilton | Applicant: H & M Mechanical, Llc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 8, 2003 | Current use: Multifamily dwe | |||||
SCORE 100 Replace forced air furnace with 50,0 btu 80% furnace. Client: Jami Hamilton | Permit type: Mechanical | Permit status: Cmp | Completion date: October 8, 2003 | Current use: Multifamily dwellings, existing | Permit id: Pmt2003-03198 | |||||
SCORE 95 Balcony decking replacement - same size, location, dimensions - unit 304. Client: John Leboeff,Little Leboeff | Applicant: P B M Inc | Permit type: Building | Permit status: Cmp | Completion date: February 9, 2005 | Current use: Multifamily dwe | |||||
SCORE 95 Balcony decking replacement - same size, location, dimensions - unit 304. Client: John Leboeff | Permit type: Building | Permit status: Cmp | Completion date: February 9, 2005 | Current use: Multifamily dwellings, existing, deck, a | Permit id: Pmt2004-03457 | |||||
SCORE 99 Install squares versa-shield and gerard stone coated metal over existing cedar shingles on a mansard roof. Building c. Date: February 22, 2007 Contractor: Horn Brothers Roofing Company Applicant: Horn Brothers Roofing Company | Permit type: Roofing | Permit status: Cmp | Completion date: October 10, 2008 | Current use: Multifamily dwe | |||||
SCORE 99 Install squares versa-shield and gerard stone coated metal over existing cedar shingles on a mansard roof. Building c. Permit type: Roofing | Permit status: Cmp | Completion date: October 10, 2008 | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-00585 | |||||
SCORE 80 Replace guard wall on exsiting deck and install membrane on floor. Applicant: Hci Interiors & Remodel Llc | Permit type: Building | Permit status: Cmp | Completion date: September 17, 2010 | Current use: Deck, repair | |||||
SCORE 82 Tear-off and reroof of a multifamily dwelling. Squares on a inchflatinch roof -- epdm over densedeck (or equivalent) over polyisocyanurate insulation. Pre-roof inspection required and mid-roof inspection required. Date: July 15, 2011 Contractor: Bradley Bros Roofing Applicant: Bradley Bros Roofing | Permit type: Roofing | Permit status: Cmp | Completion date: February 23, 2015 | Current use: Multifamily dwe | |||||
SCORE 84 Installation of a degreee tilt-up ballasted grid-tie 8. 28 kw photovoltaic system on multifamily building #3345 at the remington post complex. Array to be nested in a lower roof area and remain below top edge of existing parapet wall -- shadow of array will not leave the rooftop. See engineerfoots letter and drawings for specific information. Date: November 23, 2011 Contractor: Diversified Electric And Controls Applicant: Diversified Electric & Controls | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2012 | Current use: Multifamily dwe | |||||
SCORE 82 Tear-off and reroof of a multifamily dwelling. Squares on a inchflatinch roof -- epdm over densedeck (or equivalent) over polyisocyanurate insulation. Pre-roof inspection required and mid-roof inspection required. Permit type: Roofing | Permit status: Cmp | Completion date: February 23, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-02976 | |||||
SCORE 84 Installation of a degreee tilt-up ballasted grid-tie 8. 28 kw photovoltaic system on multifamily building #3345 at the remington post complex. Array to be nested in a lower roof area and remain below top edge of existing parapet wall -- shadow of array will not leave the rooftop. See engineerfoots letter and drawings for specific information. Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05145 |