Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-25) located in the parking lane of 34th st nw, east of the listed property (3339 n st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used at backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for ad Date: September 28, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116719 | |||||
SCORE 96 Other reserved parking Contractor: Mj Valet, Llc Permit status: Notpaid | Expiration date: March 26, 2015 | Permit id: 0 | |||||
SCORE 96 Other reserved parking Contractor: Mj Valet, Llc Permit status: Not paid | Expiration date: March 26, 2015 | Permit id: 0 | |||||
SCORE 96 Other reserved parking Contractor: Mj Valet, Llc Permit status: Notpaid | Expiration date: March 26, 2015 | Permit id: 0 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-25) located in the parking lane of 34th st nw, east of the listed property (3339 n st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used at backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for ad Date: September 28, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116719 | |||||
SCORE 96 Other reserved parking Date: June 14, 2013 Contractor: Mj Valet, Llc Permit status: Permit expired | Expiration date: June 15, 2013 | Permit id: Pa10099210 | |||||
SCORE 93 Other reserved parking Date: January 14, 2014 Contractor: Marcparc Inc Permit status: Permit expired | Expiration date: January 14, 2014 | Permit id: Pa10125929 | |||||
SCORE 96 Other reserved parking Contractor: Mj Valet, Llc Permit status: Not paid | Expiration date: March 26, 2015 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: October 30, 2015 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: December 6, 2015 | Permit id: Pa10216673 | |||||
SCORE 99 Construction staging area Date: January 4, 2016 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: January 31, 2016 | Permit id: Pa10224165 |