Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing for underground (non vesting) for pds2013-comacc-000191 12-15-2014- adding existing gasline relocation vam ![]() Permit type: Plumbing : 80 - acc | Permit status: Permit issued | Permit id: Pds2014-Comalt- | |||||
Comm ti: phase 1a for "mt miguel covenant village" to demo 4735 sqft of the existing 207 sqft "village town center" (office and storage area) and remodel to enclose existing area thats remaining (75 lf) temp power 8-26-2014 add temp power vam (new proposed town village center building under separate record id# pds2013-comacc-000191) ![]() ![]() Permit type: Building : 43 - com | Permit status: Permit finaled | Completion date: March 23, 2015 | Permit id: Pds2014-Comalt- | |||||
Interior remodel to buiilding #11 and renovation of existing garden area by adding new trellis and water feature for mt miguel covenant village bldg 11 - removing 24 lf of interior paritions from 2 patient rooms and converting to kitchenette, and living activity room for memory care patients. Misc electrical and plumbing ![]() ![]() Permit type: Building : 43 - com | Permit status: Permit finaled | Completion date: May 15, 2014 | Permit id: Pds2013-Comalt- | |||||
Interior remodel to buiilding #11 and renovation of existing garden area by adding new trellis and water feature for mt miguel covenant village garden - new 192 sq ft trellis and water feature, new fencing(less than 6 tall and new gate) ![]() ![]() Permit type: Building : 43 - com | Permit status: Permit finaled | Completion date: May 8, 2014 | Permit id: Pds2013-Comalt- | |||||
Phase 1 for mt. Miguel covenant villagetown center 38,519 sf to include 26,746 sf main level kitchen dining theatre gallery restrooms offices reception area beaty shop barber shop, 2207 sf wellness center, 5466 lower level to include 3324 lower level locker sauna area aerobic area and 2142 sf lower level pool mech rm storage woodshop, 1951 sf covered dining, w 4102 sf att bailey center multi purpose room (demo existing and rebuilding) 5-08-2015- plan change deferred trusses see c of a vam. 3-12-2015 plan check renewed at 25% of current fees. Vam (ok per matt o for no code updates) 03. 17. 2014: plan change to add phase 1a (demo of portion of existing village town center --see record id #pds2014-comalt-000138) finaled 12-23-2014 ![]() ![]() Permit type: Building : 32 - com | Permit status: In review | Permit id: Pds2013-Comacc- | |||||
Interior remodel to buiilding #11 and renovation of existing garden area by adding new trellis and water feature for mt miguel covenant village bldg 11 - removing 24 lf of interior paritions from 2 patient rooms and converting to kitchenette, and living activity room for memory care patients. Misc electrical and plumbing garden - new 192 sq ft trellis and water feature, new fencing(less than 6 tall and new gate) ![]() ![]() Permit type: Building : 43 - com | Permit status: Other | Completion date: December 13, 2013 | Permit id: Pds2013-Cmaspc- | |||||
SCORE 73 Gas line replacement for mt. Miguel covenant village between buildings 1 and 3 from gas meter ![]() ![]() Permit type: Plumbing : 80 - acc | Permit status: Permit finaled | Completion date: October 2, 2013 | Permit id: Pds2013-Comalt- | |||||
Add interior 1-hr rated smoke-door assembly w misc electrical for "mount miguel covenant village" at the brandel terrace assisted-living building. 06. 06. 2012: plan change new cover sheet correc typo (approved per mco)... Lhg 08. 22. 2012: plan change to reflect actual transition from parking to path (flush w truncated domes instead of curb ramp)... Mco (changes made to permitted set) ![]() ![]() Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: October 24, 2012 | Permit id: Pds2012-1021-20 | |||||
New 2 amp 3 phase 120 208a metered pedestal at the bailey center for mt miguel covenant village. (remove 6 amp panel and structure) ![]() Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: June 14, 2011 | Permit id: Pds2011-1007-20 | |||||
Comm ti phase 1a for "mt miguel covenant village" to demo 4735 sqft of the existing 207 sqft "village town center" (office and storage area) and remodel to enclose existing area thats remaining (75 lf) temp power 8-26-2014 add temp power vam (new proposed town village center building under separate record id# pds2013-comacc-000191) ![]() ![]() Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: March 23, 2015 | Permit id: Pds2014-Comalt- | |||||
SCORE 76 5 (n) electrical light poles for mount miguel covenant village Permit type: Commercial alteration-addn | Permit status: Issued | Permit id: Pds2016-Comalt- | |||||
Interior remodel to buiilding #11 and renovation of existing garden area by adding new trellis and water feature for mt miguel covenant village bldg 11 - removing 24 lf of interior paritions from 2 patient rooms and converting to kitchenette, and living/activity room for memory care patients. Misc electrical and plumbing ![]() ![]() Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 15, 2014 | Permit id: Pds2013-Comalt- | |||||
1 amp temp power for pds2013-comacc-000191 mt miguel ![]() Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: April 18, 2016 | Permit id: Pds2016-Comalt- | |||||
Interior remodel to buiilding #11 and renovation of existing garden area by adding new trellis and water feature for mt miguel covenant village bldg 11 - removing 24 lf of interior paritions from 2 patient rooms and converting to kitchenette, and living/activity room for memory care patients. Misc electrical and plumbing garden - new 192 sq ft trellis and water feature, new fencing(less than 6 tall and new gate) ![]() ![]() Permit type: Commercial multi-bldg parent | Permit status: Completed | Completion date: December 13, 2013 | Permit id: Pds2013-Cmaspc- | |||||
SCORE 93 Gas line replacement for mt. Miguel covenant village between buildings 1 and 3 from gas meter ![]() ![]() Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: October 2, 2013 | Permit id: Pds2013-Comalt- | |||||
Add interior 1-hr rated smoke-door assembly w/ misc electrical for "mount miguel covenant village" at the brandel terrace assisted-living building. 06. 06. 2012 plan change new cover sheet correc typo (approved per mco)... Lhg 08. 22. 2012 plan change to reflect actual transition from parking to path (flush w/ truncated domes instead of curb ramp)... Mco (changes made to permitted set) ![]() ![]() Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: October 24, 2012 | Permit id: Pds2012-1021-20 | |||||
New 2 amp 3 phase 120/208a metered pedestal at the bailey center for mt miguel covenant village. (remove 6 amp panel and structure) ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 14, 2011 | Permit id: Pds2011-1007-20 | |||||
Phase 1 for mt. Miguel covenant villagetown center 38,519 sf to include 26,746 sf main level kitchen/dining/theatre/gallery/ restrooms/offices/reception area/beaty shop/barber shop, 2207 sf wellness center, 5466 lower level to include 3324 lower level locker/sauna area/aerobic area and 2142 sf lower level pool mech rm/storage/woodshop, 1951 sf covered dining, w/4102 sf att bailey center multi purpose room (demo existing and rebuilding) 6-6-16 plan change - structural only. See plan change on coa. Cdc 2/9/2016 plan change. Structural only. See c of a.. Ss 10-16-2015 submittal of deferred firestopping calcs. Vam. 5-08-2015- plan change deferred trusses see c of a vam. 3-12-2015 plan check renewed at 25% of current fees. Vam (ok per matt o for no code updates) 03. 17. 2014 plan change to add phase 1a (demo of portion of existing village town center --see record id #pds2014-comalt-000138) finaled 12-23-2014 ![]() ![]() Permit type: New commercial acc structure | Permit status: Issued | Completion date: July 19, 2016 | Permit id: Pds2013-Comacc- | |||||
SCORE 89 Commercial demo of village center phase 1b note _ it may not be possible to rebuild. _ the fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the zoning counter at the kearny mesa pds offices (55 overland ave., suite 110) for more information. C&d permit = dpw2016-reccd-00195 ![]() ![]() Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: December 16, 2016 | Permit id: Pds2016-Comalt- | |||||
SCORE 100 1 amp temp power for pds2013-comacc-000191 mt miguel ![]() ![]() Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: April 18, 2016 | Permit id: Pds2016-Comalt- | |||||
SCORE 71 Interior remodel to buiilding #11 and renovation of existing garden area by adding new trellis and water feature for mt miguel covenant village bldg 11 - removing 24 lf of interior paritions from 2 patient rooms and converting to kitchenette, and living activity room for memory care patients. Misc electrical and plumbing garden - new 192 sq ft trellis and water feature, new fencing(less than 6 tall and new gate) Permit type: Commercial multi-bldg parent | Permit status: Completed | Completion date: December 13, 2013 | Permit id: Pds2013-Cmaspc- | |||||
Add interior 1-hr rated smoke-door assembly w misc electrical for "mount miguel covenant village" at the brandel terrace assisted-living building. 06. 06. 2012 plan change new cover sheet correc typo (approved per mco)... Lhg 08. 22. 2012 plan change to reflect actual transition from parking to path (flush w truncated domes instead of curb ramp)... Mco (changes made to permitted set) ![]() ![]() Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: October 24, 2012 | Permit id: Pds2012-1021-20 | |||||
SCORE 99 New 2 amp 3 phase 120 208a metered pedestal at the bailey center for mt miguel covenant village. (remove 6 amp panel and structure) ![]() ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 14, 2011 | Permit id: Pds2011-1007-20 | |||||
SCORE 89 Plumbing for underground (non vesting) for pds2013-comacc-000191 12-15-2014- adding existing gasline relocation vam ![]() ![]() Permit type: Commercial alteration-addn | Permit status: Issued about to expire | Permit id: Pds2014-Comalt- | |||||
SCORE 79 2866 sf commercial pool spa (mp 347756) for (mt miguel covenant village) Permit type: New commercial acc structure | Permit status: Issued | Permit id: Pds2016-Comacc- | |||||
SCORE 71 Interior remodel to buiilding #11 and renovation of existing garden area by adding new trellis and water feature for mt miguel covenant village bldg 11 - removing 24 lf of interior paritions from 2 patient rooms and converting to kitchenette, and living activity room for memory care patients. Misc electrical and plumbing Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 15, 2014 | Permit id: Pds2013-Comalt- | |||||
SCORE 76 Remove (e) outdoor flourescent light fixtures & install 13w led lights fixtures 4 above (e) location for mt miguel covenant village Permit type: Addn | Permit status: Completed | Completion date: May 19, 2017 | Permit id: Pds2017-Comalt- | |||||
127 sq ft mail kiosk for mt miguel covenant village demolitions of existing mailboxes and relocate same to new mail kiosk adjacent to existing mailboxes in existing courtyard ![]() ![]() Permit type: New commercial acc structure | Permit status: Open | Permit id: Pds2017-Comacc- | |||||
SCORE 89 Phase 1 for mt. Miguel covenant villagetown center 38,519 sf to include 26,746 sf main level kitchen dining theatre gallery restrooms offices reception area beaty shop barber shop, 2207 sf wellness center, 5466 lower level to include 3324 lower level locker sauna area aerobic area and 2142 sf lower level pool mech rm storage woodshop, 1951 sf covered dining, w 4102 sf att bailey center multi purpose room (demo existing and rebuilding) 9 2 2016 plan change. Electrical only. See c of a... Ss 6-6-16 plan change - structural only. See plan change on coa. Cdc 2 9 2016 plan change. Structural only. See c of a.. Ss 10-16-2015 submittal of deferred firestopping calcs. Vam. 5-08-2015- plan change deferred trusses see c of a vam. 3-12-2015 plan check renewed at 25% of current fees. Vam (ok per matt o for no code updates) 03. 17. 2014 plan change to add phase 1a (demo of portion of existing village town center --see record id #pds2 Permit type: New commercial acc structure | Permit status: Completed | Completion date: July 19, 2016 | Permit id: Pds2013-Comacc- | |||||
- excavation permit ![]() Permit status: Closed | Completion date: December 22, 2016 | Permit id: Dpw2016-Rwexcp- | |||||
Final ![]() Permit status: Fail | Permit id: Pds2013-Comacc- | |||||
Stormwater insp ![]() Permit status: Monitor | Permit id: Pds2013-Comacc- | |||||
Lath/drywall - interior ![]() Permit status: Pass | Permit id: Pds2013-Comacc- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2005-1011-20 | |||||
Final ![]() Permit status: Pass | Permit id: Pds2014-Comalt- | |||||
Foundation/steel/holdowns/abs/1st ![]() Permit status: Pass | Permit id: Pds2013-Comalt- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2012-1021-20 | |||||
Final ![]() Permit status: Pass | Permit id: Pds2011-1007-20 | |||||
Final ![]() Permit status: Pass | Permit id: Pds2007-1019-20 |