Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-35) located in the eastbound parking lane of n st nw, north of the listed property (3238 n st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematic ![]() Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116727 | |||||
SCORE 79 Excavation; boring test pit (single) ![]() Permit status: 1 | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon a monitoring well (pragi-35) located in the eastbound parking lane of n street nw, north of the listed property (3238 n st nw). This monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division pr-a is now complete. Therefore, the well installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry, or by backfilling with medium, hydrated, bentonite pellets in accordance with the well regulations (1831. 5). Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. ![]() ![]() Client: Dc Water Carlton Ray Co Christopher Gerber | Permit type: Excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon a monitoring well (pragi-35) located in the eastbound parking lane of n street nw, north of the listed property (3238 n st nw). This monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division pr-a is now complete. Therefore, the well installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry, or by backfilling with medium, hydrated, bentonite pellets in accordance with the well regulations (1831. 5). Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. ![]() Permit status: Approved (pending payment | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 79 Excavation; boring test pit (single) ![]() ![]() Permit status: 8 | Expiration date: August 5, 2017 | Permit id: Pa205759 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-35) located in the eastbound parking lane of n st nw, north of the listed property (3238 n st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematic ![]() ![]() Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116727 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon a monitoring well (pragi-35) located in the eastbound parking lane of n street nw, north of the listed property (3238 n st nw). This monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division pr-a is now complete. Therefore, the well installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry, or by backfilling with medium, hydrated, bentonite pellets in accordance with the well regulations (1831. 5). Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. ![]() ![]() Permit status: Permit expired | Expiration date: August 5, 2017 | Permit id: Pa205759 | |||||
SCORE 99 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: December 5, 2015 | Permit id: Pa10215763 | |||||
SCORE 99 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: January 31, 2016 | Permit id: Pa10224173 | |||||
SCORE 99 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: August 11, 2017 | Permit id: Pa10428283 |