Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 14, 2016 Contractor: The Right Choice Heating And Air Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 27, 2017 Contractor: Solarcity Corporation Permit type: Addn | Permit status: Completed | Completion date: November 2, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 89 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 14, 2016 Contractor: The Right Choice Heating And Air Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- |