Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition permit Date: March 11, 2008 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 136533 | |||||
Zoning/use permit Date: August 8, 2011 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 343802 | |||||
Administrative permit Date: February 21, 2014 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 518925 | |||||
Mechanical permit Date: May 11, 2012 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 356493 | |||||
Electrical permit Date: January 20, 2015 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 580701 | |||||
Suppression permit Date: January 12, 2015 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 578929 | |||||
Administrative permit Date: June 29, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 409445 | |||||
Use permit Date: November 18, 2010 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 312536 | |||||
Electrical permit Date: October 25, 2010 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 308099 | |||||
Zoning admin review Date: October 7, 2011 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 360822 | |||||
Demolition permit Date: February 27, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 390106 | |||||
Administrative permit Date: August 14, 2013 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 489066 | |||||
Mechanical permit Date: December 29, 2014 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 578900 | |||||
Use permit Date: January 15, 2016 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 619029 | |||||
Demolition permit Date: September 23, 2016 Client: Post Goldtex, Lp | Permit status: Active | Permit id: 724252 | |||||
Administrative permit Date: August 30, 2011 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 345480 | |||||
Alteration permit Date: September 6, 2011 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 358616 | |||||
Zoning admin review Date: September 4, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 421274 | |||||
Plumbing permit Date: April 15, 2015 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 586041 | |||||
Alteration permit Date: September 30, 2016 Client: Post Goldtex, Lp | Permit status: Active | Permit id: 724261 | |||||
Alteration permit Date: November 17, 2014 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 557928 | |||||
Suppression permit Date: June 6, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 400229 | |||||
Electrical permit Date: January 5, 2012 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 381737 | |||||
Electrical permit Date: June 26, 2013 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 452893 | |||||
Alteration permit Date: November 24, 2010 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 311184 | |||||
Use permit Date: June 11, 2014 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 520977 | |||||
Use permit Date: November 14, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 422455 | |||||
Zoning/use permit Date: April 3, 2007 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 33087 | |||||
Plumbing permit Date: September 18, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 427885 | |||||
Suppression permit Date: December 14, 2010 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 311362 | |||||
Alteration permit Date: July 13, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 405542 | |||||
Electrical permit Date: March 14, 2014 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 520838 | |||||
Permit for a take out restaurant, storage of coffee beans, roasting of coffee, wholesale and retail sales of roasted coffee beans products (retail sale of food, beverages and groceries) in space a, existing sit down restaurant in space b on 1st floor with existing accessory parking garage for twenty (28) spaces as previously approved in basement with 163 dwelling units above with all other uses as previously approved in an existing structure (size and location as shown in the application). Date: July 17, 2015 Client: Post Goldtex, Lp | Applicant: Matthew Monroe Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: August 31, 2015 | Permit id: 25667 | |||||
Permit for the increase of dwelling units (145) units to (163) units within existing floor plans; erection of a one (1) story at 11th floor and mechanical area , erection of bay windows, projecting canopies, accessory parking garage at basement level for (18), 46 existing off-site parking at 1201 callowhill street per permit ap # 136219 - dated 1-31-2011, with other existing uses as permitted in the c-1 commercial district 1st floor, no signs on this application. Date: June 15, 2011 Client: Post Goldtex, Lp | Applicant: Carl Primavera, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: July 26, 2011 | Permit id: 15351 | |||||
Permit is for creation of two (2) spaces from one (1) space. Space b - for a sit down restaurant and space a - vacant tenant space on 1st floor with existing accessory parking garage for twenty (28) spaces as previously approved in basement with 163 dwelling units above with all other uses as previously approved in an existing structure. Date: March 13, 2014 Client: Post Goldtex, Lp | Applicant: Ronald J. Patterson, Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: May 16, 2014 | Permit id: 22389 | |||||
Permit for the erection of an 11th & 12th floor addition, reconfiguration of floor plan 1- from (108) units to (136) units within existing floor plats: conversion of 11th floor mechanical area to (9) duplex dwelling units for a total of (145) residential units within existing structure with uses as permitted in the c-1 commercial district, no signs on the application. Date: March 14, 2008 Client: Post Goldtex, Lp | Applicant: William F. Kerr, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: January 13, 2010 | Permit id: 5016 | |||||
Permit for reconfiguration of parking spaces on the basemet to a new total of (28) spaces including one (1(h/c space) elemination of parking spaces previously approved on 1201 callowhill st, accessory to an existing structure with previously approved (163) dwelling unitson floors two thru eleven, with previously approved commercial uses as permitted in c-1 commercial district. (size and location as shown on the application) Date: October 3, 2012 Client: Post Goldtex, Lp | Applicant: Ronald Patterson, Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: November 13, 2012 | Permit id: 19023 | |||||
On 9/17/2014, the department of licenses and inspections issued a notice of refusal for application #557928. Date: September 20, 2014 Client: Post Goldtex, Lp | Applicant: Ian Smith | Permit type: Appeal | Permit status: Approved | Completion date: November 25, 2014 | Permit id: 23758 | |||||
Administrative permit Date: August 30, 2011 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 345480 | |||||
Alteration permit Date: November 25, 2011 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 373147 | |||||
Administrative permit Date: August 1, 2013 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 486661 | |||||
Administrative permit Date: February 21, 2014 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 518903 | |||||
Administrative permit Date: January 26, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 385195 | |||||
Demolition permit Date: May 11, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 308919 | |||||
Suppression permit Date: June 6, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 400229 | |||||
Zoning use permit Date: January 31, 2011 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 136219 | |||||
Electrical permit Date: January 20, 2015 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 580701 | |||||
Electrical permit Date: January 17, 2017 Client: Post Goldtex, Lp | Permit status: Active | Permit id: 728344 | |||||
Electrical permit Date: January 5, 2012 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 381737 | |||||
Mechanical permit Date: May 11, 2012 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 356493 | |||||
Zoning admin review Date: October 7, 2011 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 360822 | |||||
Suppression permit Date: December 14, 2010 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 311362 | |||||
Suppression permit Date: January 12, 2015 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 578929 | |||||
Electrical permit Date: March 14, 2014 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 520838 | |||||
Zoning admin review Date: September 4, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 421274 | |||||
Alteration permit Date: September 30, 2016 Client: Post Goldtex, Lp | Permit status: Active | Permit id: 724261 | |||||
Electrical permit Date: June 27, 2013 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 477153 | |||||
Alteration permit Date: November 17, 2014 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 557928 | |||||
Plumbing permit Date: April 15, 2015 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 586041 | |||||
Mechanical permit Date: December 19, 2014 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 578623 | |||||
Demolition permit Date: March 11, 2008 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 136533 | |||||
Use permit Date: November 14, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 422455 | |||||
Demolition permit Date: September 23, 2016 Client: Post Goldtex, Lp | Permit status: Active | Permit id: 724252 | |||||
Use permit Date: January 15, 2016 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 619029 | |||||
Plumbing permit Date: September 19, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 427116 | |||||
Alteration permit Date: November 24, 2010 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 311184 | |||||
Electrical permit Date: October 25, 2010 Client: Post Goldtex, Lp | Permit status: Expired | Permit id: 308099 | |||||
Zoning use permit Date: April 3, 2007 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 33087 | |||||
Use permit Date: November 18, 2010 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 312536 | |||||
Alteration permit Date: July 13, 2012 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 405542 | |||||
Use permit Date: June 11, 2014 Client: Post Goldtex, Lp | Permit status: Completed | Permit id: 520977 | |||||
Permit is for creation of two (2) spaces from one (1) space. Space b - for a sit down restaurant and space a - vacant tenant space on 1st floor with existing accessory parking garage for twenty (28) spaces as previously approved in basement with 163 dwelling units above with all other uses as previously approved in an existing structure. Date: March 13, 2014 Client: Post Goldtex, Lp | Applicant: Ronald J. Patterson, Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: May 16, 2014 | Permit id: 22389 | |||||
Permit for the erection of an 11th & 12th floor addition, reconfiguration of floor plan 1- from (108) units to (136) units within existing floor plats: conversion of 11th floor mechanical area to (9) duplex dwelling units for a total of (145) residential units within existing structure with uses as permitted in the c-1 commercial district, no signs on the application. Date: March 14, 2008 Client: Post Goldtex, Lp | Applicant: William F. Kerr, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: January 13, 2010 | Permit id: 5016 | |||||
Permit for a take out restaurant, storage of coffee beans, roasting of coffee, wholesale and retail sales of roasted coffee beans products (retail sale of food, beverages and groceries) in space a, existing sit down restaurant in space b on 1st floor with existing accessory parking garage for twenty (28) spaces as previously approved in basement with 163 dwelling units above with all other uses as previously approved in an existing structure (size and location as shown in the application). Date: July 17, 2015 Client: Post Goldtex, Lp | Applicant: Matthew Monroe Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: August 31, 2015 | Permit id: 25667 | |||||
Permit for the increase of dwelling units (145) units to (163) units within existing floor plans; erection of a one (1) story at 11th floor and mechanical area , erection of bay windows, projecting canopies, accessory parking garage at basement level for (18), 46 existing off-site parking at 1201 callowhill street per permit ap # 136219 - dated 1-31-2011, with other existing uses as permitted in the c-1 commercial district 1st floor, no signs on this application. Date: June 15, 2011 Client: Post Goldtex, Lp | Applicant: Carl Primavera, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: July 26, 2011 | Permit id: 15351 | |||||
Permit for reconfiguration of parking spaces on the basemet to a new total of (28) spaces including one (1(h c space) elemination of parking spaces previously approved on 1201 callowhill st, accessory to an existing structure with previously approved (163) dwelling unitson floors two thru eleven, with previously approved commercial uses as permitted in c-1 commercial district. (size and location as shown on the application) Date: October 3, 2012 Client: Post Goldtex, Lp | Applicant: Ronald Patterson, Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: November 13, 2012 | Permit id: 19023 | |||||
On 9 17 2014, the department of licenses and inspections issued a notice of refusal for application #557928. Date: September 20, 2014 Client: Post Goldtex, Lp | Applicant: Ian Smith | Permit type: Appeal | Permit status: Approved | Completion date: November 25, 2014 | Permit id: 23758 | |||||
SCORE 100 Install 1-400amp 3 phase subpanel,1-300amp 3 phase subpanel,1-225amp 3 phase subpanel,1-125amp 3 phase subpanel per 2008 nec. Installation to comply with article 250. 102(c) of the 2008 nec. Date: May 20, 2015 Contractor: James Wilkins Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: June 12, 2015 | Permit id: 588839 | |||||
Per proviso prepared food shop with take out, storage of coffee beans, roasting of coffee, wholesale and retail sales of food, beverages and groceries in space a; existing sit down restaurant in space b on 1st floor with existing accessory parking garage for twenty (28) spaces as previously approved in basement with 163 dwelling units above with all other uses as previously approved in an existing structure (size and location as shown in the application). No sign on this permit. Date: January 15, 2016 Client: Post Goldtex Lp | Permit type: Use permit | Permit status: Completed | Completion date: January 15, 2016 | Permit id: 619029 | |||||
Ez demo- ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: September 23, 2016 Client: Post Goldtex Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: June 17, 2017 | Permit id: 724252 | |||||
Interior fit out for coffeee service establishment on the first floor, new metal sheving, replace interior doors, remove window frame in new bathroom mop closet and service counter. Co and lo part of this application. Date: September 30, 2016 Client: Post Goldtex Lp | Permit type: Alteration permit | Permit status: Active | Completion date: September 25, 2017 | Permit id: 724261 | |||||
Extension of approval granted at zba calendar no. 07-0049 zoning permit 33087 Date: January 31, 2011 Client: Post Goldtex Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 2, 2011 | Permit id: 136219 | |||||
SCORE 100 Install 2 amp temporary electrical service for construction site,install 10 temporary security lights around the bldg,install 1 of temporary lights in basement area as per 2008 nec Date: October 25, 2010 Contractor: Major Electric Systems Inc Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: October 25, 2010 | Permit id: 308099 | |||||
Interior demolition removal of interior non load baring partitions, doors, frames nonstructural ceilings and grids and existing wood floors throughout removal of all mechanical plumbing ,electrical and fire suppression sysytems( not to include standpipes) -stand pipes must remain operational -notify fire dept prior to start of demolition Date: March 11, 2008 Client: Post Goldtex Lp | Permit type: Demolition permit | Permit status: Expired | Completion date: June 1, 2009 | Permit id: 136533 | |||||
SCORE 93 Temporary certificate of occupancy for units 904,905,907,910,911 and 915 only Date: August 27, 2013 Contractor: Ccp Construction Co Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 30, 2013 | Permit id: 491596 | |||||
SCORE 100 Replace standpipe in east exit stairway for protection during construction. Date: December 14, 2010 Contractor: B. M. Consulting Services Inc Client: Post Goldtex Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: December 17, 2010 | Permit id: 311362 | |||||
Interior renovations for sit-down restaurant as per approved plans and bbs variance no. 23758. Date: November 17, 2014 Client: Post Goldtex Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 1, 2015 | Permit id: 557928 | |||||
SCORE 93 For the installation of two (2) 20-ton air conditioning units and associated ductwork as per approved plans. Date: December 19, 2014 Contractor: Energy Star Services Inc Client: Post Goldtex Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 5, 2015 | Permit id: 578623 | |||||
SCORE 99 Installation of one (1) commercial kitchen exhaust hood with supply exhaust tie-in to one (1) maked up air fan, one (1) exhaust fan & all associated return exhaust ductwork. Separate permit shall be required for installation of an approved automatic fire supression system Date: December 29, 2014 Contractor: Reliable Fire Protection Inc Client: Post Goldtex Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 5, 2015 | Permit id: 578900 | |||||
SCORE 96 Temporary certificate of occupancy for 8th floor Date: July 10, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 12, 2013 | Permit id: 480236 | |||||
SCORE 93 Temporary certificate of occupancy for 8th floor Date: July 10, 2013 Contractor: Ccp Construction Co Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: July 12, 2013 | Permit id: 480236 | |||||
SCORE 100 Base bldg & common area electric including but not limited to connecting base bldg equip, vertical circulation, garage installing bas bldg panel & feeds to base bldg elements as per nec 2008 (mixed use) Date: June 27, 2013 Contractor: Major Electric Systems Inc Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 4, 2015 | Permit id: 477153 | |||||
SCORE 93 Temporary certificate of occupancy for the basement only. Date: September 13, 2013 Contractor: Ccp Construction Co Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 7, 2014 | Permit id: 494597 | |||||
SCORE 96 Tco for units 913 and 914 only Date: September 3, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 3, 2013 | Permit id: 492450 | |||||
SCORE 96 Temporary certificate of occupancy for units 904,905,907,910,911 and 915 only Date: August 27, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 30, 2013 | Permit id: 491596 | |||||
SCORE 96 Temporary certificate of occupancy for the 9th floor only. Date: August 14, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 13, 2013 | Permit id: 489066 | |||||
SCORE 93 Temporary certificate of occupancy for the 9th floor only. Date: August 14, 2013 Contractor: Ccp Construction Co Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 13, 2013 | Permit id: 489066 | |||||
SCORE 96 Temporary certificate of occupancy for the second floor only. Date: June 20, 2014 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 30, 2014 | Permit id: 544574 | |||||
Additional floors Date: April 3, 2007 Client: Post Goldtex Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 11, 2008 | Permit id: 33087 | |||||
Register floor as vacant with temporary project management office (no storage of construction equipment or any items as defined in section 14-508 (2) (a) on partial 3rd floor with remainder of the building to remain vacant (use registration permit required prior to occupancy). No sign on this application. No addition. Date: November 18, 2010 Client: Post Goldtex Lp | Permit type: Use permit | Permit status: Completed | Completion date: November 18, 2010 | Permit id: 312536 | |||||
163 sfd units, with roof top mechanicals, with roof top pool, with deck, addition of partial 1 story addition of residential area roof top 11th floor. With bay windows, with projecting canopies, with accessory parking. Date: August 8, 2011 Client: Post Goldtex Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 22, 2017 | Permit id: 343802 | |||||
SCORE 93 Interior renovations for temp. Construction office on partial third flr with two remote exits to lead directly to the outside and installation of standpipe per plan. Date: November 24, 2010 Contractor: Ccp Construction Co Llc Client: Post Goldtex Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 10, 2011 | Permit id: 311184 | |||||
SCORE 100 Install two gas heaters with two 5 ton a c with related duct work Date: September 15, 2017 Contractor: Jay Zawierucha Client: Post Goldtex Lp | Permit type: Mechanical permit | Permit status: Active | Completion date: October 10, 2017 | Permit id: 816517 | |||||
SCORE 100 Onto existing 5000amp service install switches, recepts, lights, exit emergency signs as per nec 2008 (cc district) Date: January 17, 2017 Contractor: Russell Baysmore Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: January 17, 2017 | Permit id: 728344 | |||||
SCORE 96 Temporary certificate of occupancy for the seventh floor only.` Date: November 19, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 16, 2013 | Permit id: 506872 | |||||
SCORE 96 Temporary certificate for the 10th floor and gymnasium only. Date: October 30, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 5, 2013 | Permit id: 503273 | |||||
SCORE 96 Temporary certificate of occupancy for the 8th floor only. Date: October 17, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 7, 2014 | Permit id: 501051 | |||||
SCORE 93 Temporary certificate of occupancy for the 8th floor only. Date: October 17, 2013 Contractor: Ccp Construction Co Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 7, 2014 | Permit id: 501051 | |||||
SCORE 96 Temporary certificate of occupancy for the 6th floor only. Date: September 23, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 2, 2013 | Permit id: 496178 | |||||
SCORE 96 Tco for 1 day event on thursday october 17th 2013 from 7pm-11pm for tours of lobby,7th floor units, and roof. Compliance with variance of general application case no. B-0923-05 is required. No other activity to take place within building. Note: this permit does not constitue an approval; the tco will be issued by the building inspector after building has been inspected and approved for occupancy. Date: October 7, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 17, 2013 | Permit id: 495151 | |||||
SCORE 93 Amend permit #373147 to include exterior renovation in description of work. See ap# 373147 for plans. Date: January 26, 2012 Contractor: Ccp Construction Co Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 10, 2013 | Permit id: 385195 | |||||
SCORE 100 Apt bldg-provide temporary lighting & recepts throughout bldg using existing temp svc & panels as per 2008 nec (cc district) Date: January 5, 2012 Contractor: Dougherty Electric Inc Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: January 5, 2012 | Permit id: 381737 | |||||
SCORE 96 Int renovation for conversion to apartment buidling. Separate permits required for 1st floor tenant spaces. Date: November 25, 2011 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: September 22, 2014 | Permit id: 373147 | |||||
Requesting for administrative review for amended site plans to reflect partial demo of portions building and (2) confirm 18 on site parking spaces, and 46 off site parking spaces at nearby parking lot. Date: October 7, 2011 Client: Post Goldtex Lp | Permit type: Zoning admin review | Permit status: Completed | Completion date: October 11, 2011 | Permit id: 360822 | |||||
SCORE 93 Partial demo of existing building, including penthouses, floor slab on roof, and cornices. Date: September 6, 2011 Contractor: Ccp Construction Co Llc Client: Post Goldtex Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 2, 2012 | Permit id: 358616 | |||||
SCORE 93 Interior demolition (added new cost for job - 5 11 2012) Date: May 11, 2012 Contractor: Delaware Valley Remediation Ll Client: Post Goldtex Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: May 12, 2014 | Permit id: 358611 | |||||
SCORE 96 Temporary certificate of occupancy for the sixth floor only.` Date: February 21, 2014 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 13, 2014 | Permit id: 518918 | |||||
SCORE 96 Temporary certificate of occupancy for the fourth floor only.` Date: February 21, 2014 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 13, 2014 | Permit id: 518903 | |||||
SCORE 96 Temporary certificate of occupancy for the third floor only.` Date: February 21, 2014 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 16, 2014 | Permit id: 518897 | |||||
SCORE 96 Temporary certificate of occupancy for 9th floor only Date: December 4, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 16, 2013 | Permit id: 509424 | |||||
SCORE 96 Temporary certificate of occupancy for the 5th floor only. Date: November 20, 2013 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 16, 2013 | Permit id: 507260 | |||||
SCORE 100 Install and wire exterior lighting to 1st floor entry and soffit lighting,roof deck lighting and facade lighting per 2008 (apt bldg comm) Date: March 14, 2014 Contractor: Major Electric Systems Inc Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: March 14, 2014 | Permit id: 520838 | |||||
SCORE 96 Temporary certificate of occupancy for the tenth floor only.` Date: February 21, 2014 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 13, 2014 | Permit id: 518925 | |||||
For creation of two (2) spaces from one (1) space. Space b - for a sit down restaurant and space a - vacant tenant space (use registration permit required prior to occupancy) on 1st floor with existing accessory parking garage for twenty (28) spaces as previously approved in basement with 163 dwelling units above with all other uses as previously approved in an existing structure. No sign on this permit. Date: June 11, 2014 Client: Post Goldtex Lp | Permit type: Use permit | Permit status: Completed | Completion date: June 11, 2014 | Permit id: 520977 | |||||
SCORE 96 Tco for the basement,1st flr. Lobby,floors 3,4,5,6,7,8,9 and 10th floor exercise room and pool only. Date: April 8, 2014 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: June 16, 2014 | Permit id: 529367 | |||||
Amend ap# 343802 to reconfigure rooftop mechanical and screening walls. Relocate roof top pool, deck and rrof deck terraces. Reconfigure parking garage - no change in number of 18 spaces as per plans. Date: September 4, 2012 Client: Post Goldtex Lp | Permit type: Zoning admin review | Permit status: Completed | Completion date: September 4, 2012 | Permit id: 421274 | |||||
SCORE 100 Ins (1) 5000amp, 1 208v service, inst (1) 1600amp service 480v service, inst 1 subpanel- all grounding installation per 2008 nec Date: October 16, 2012 Contractor: Console Anthony Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: July 2, 2014 | Permit id: 409617 | |||||
SCORE 82 Amend permit #400229 to temporarily relocate standpipe to a location approved by the phila fire dept @ ne corner on wood st.. Date: June 29, 2012 Contractor: United States Sprinklers Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 24, 2012 | Permit id: 409445 | |||||
SCORE 99 Installation of complete hvac system, stair and elevator pressurization systems, unit heaters, ac units, associated mechanicals, as per submitted plans and specifications. Special inspections for the pressurization systems smoke control. In conjunction with ap373147 Date: June 7, 2012 Contractor: Myco Mechanical Inc Client: Post Goldtex Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 18, 2014 | Permit id: 408580 | |||||
SCORE 60 Install a rooftop pool and spa as per plans and as per accessibility advisory board variance #505569. Date: July 13, 2012 Contractor: Main Line Commercial Pools Llc Client: Post Goldtex Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 16, 2014 | Permit id: 405542 | |||||
SCORE 82 Installation of a new fire suppression system as per nfpa 13. To include standpipes, backflow, fire pump, fdc. Date: June 6, 2012 Contractor: United States Sprinklers Client: Post Goldtex Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 18, 2014 | Permit id: 400229 | |||||
SCORE 100 Closure in place of 1 ust, one estimated 5,0 gallon ust, formerly continaing #6 fuel oil Date: February 27, 2012 Contractor: React Environmental Prof Servi Client: Post Goldtex Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: May 29, 2012 | Permit id: 390106 | |||||
SCORE 56 Amend permit #373147 to include exterior renovation in description of work. See ap# 373147 for plans. Date: January 26, 2012 Contractor: Empire Glass And Metal Inc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 10, 2013 | Permit id: 385195 | |||||
Reconfigure basement level garage to increase number of parking spaces from (18) to (28) spaces. Remove off street parking proviso approved by zba for (46) spaces without pride or prejudice to all permits. Date: November 14, 2012 Client: Post Goldtex Lp | Permit type: Use permit | Permit status: Completed | Completion date: November 22, 2017 | Permit id: 422455 | |||||
SCORE 99 For the installation of (1) ul 3 listed wet chemical extinguishing system with sixteen (16) flow points in accordance with nfpa 17a. Fire supression system to serve a 15-0" commercial kitchen exhaust hood system in akithcen area of an existing structure. Please see ap#5789 for approved kitchen hood ventilation system. Date: January 12, 2015 Contractor: Reliable Fire Protection Inc Client: Post Goldtex Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 5, 2015 | Permit id: 578929 | |||||
SCORE 100 (2)3 compartment sink,5 hand sinks,1 prep sink,1 mop sink,1 dishwasher,1 prep sink,1 mop sink,1 dishwasher,1 pre-rinse sink,4 toilets and 4 lavs (restaurant) Date: April 15, 2015 Contractor: Gregory F Rossi Plumbing And Htg Client: Post Goldtex Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 5, 2015 | Permit id: 586041 | |||||
SCORE 100 Install new light fixtures & also relocate & replace existing light fixture (resturant) cc district Date: January 20, 2015 Contractor: James Wilkins Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 18, 2015 | Permit id: 580701 | |||||
SCORE 96 Temporary certificate of occupancy for the penthouse only. Date: August 7, 2014 Contractor: Post General Contracting Llc Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 22, 2014 | Permit id: 553635 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 27, 2015 Contractor: Cellich Fire Protection Inc Client: Post Goldtex Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 5, 2015 | Permit id: 612954 | |||||
Interior demolition of non load bearing assemblies only. (updated cost of job -5-11-2012) Date: May 11, 2012 Client: Post Goldtex Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: June 28, 2012 | Permit id: 308919 | |||||
Prelim, plans are at 8-%. Request general plan review under all applicable codes and meeting with plans examiner Date: August 30, 2011 Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 30, 2011 | Permit id: 345480 | |||||
Two dwelling unit mock-ups 3rd fl at vacant site pending construction operations renovations to create multi-family dwelling high rise. - mock-up units are not to be used as sample units open to the public building. No part of this building including mock-up units is to be open to the public separate application, plans and certificate of occupancy required if and when mock-up units are to be used as sample units open to the public building up to and including the 3rd floor shall have an operational automatic sprinkler system and dedicated mean of egress before mock-up units may be used as sample units open to the public (note: see ap #311184 to comply violation #257760) Date: July 12, 2011 Client: Post Goldtex Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: May 29, 2012 | Permit id: 345634 | |||||
SCORE 100 Install electrical wiring for 163 apts and common areas, install recepts, switches, light fixtures as per 2008 nec (apt bldg w comm) Date: June 26, 2013 Contractor: Vtech Electric Inc Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 2, 2014 | Permit id: 452893 | |||||
SCORE 100 Voice evac fire system panel 28 pulls, 84 smokes, 26 heats 338 speakers and 113 strobes as per 2008 nec & nfpa 72 (apt bldg) Date: December 5, 2012 Contractor: B H Holding Company Client: Post Goldtex Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 3, 2014 | Permit id: 437107 | |||||
SCORE 100 Install 2 new 10" laterals & 2 10" double vent curb traps, install new 10" horizontal line from house side of curb traps to inside foundation walls (apt bldg) pa1 call#2012 262 0537 Date: September 18, 2012 Contractor: Ferman Mc Gee Client: Post Goldtex Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 22, 2013 | Permit id: 427885 | |||||
SCORE 100 Install new bathrms,kitchens,wash machines from 2nd to 10th fl in 167 apts, all new cold & hot water risers, branches & supplies, new vertical, vent stack & stack vents, new waste lines to small plumbing fixtures (apts) Date: September 19, 2012 Contractor: Ferman Mc Gee Client: Post Goldtex Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 8, 2015 | Permit id: 427116 | |||||
Tco for 1 day event on saturday may 25th 2013 from 7pm-11pm for tours of lobby,8th floor units, and roof with a maximum of ten people per tour. Compliance with variance of general application case no. B-0923-05 is required. No other activity to take place within building. Note: this permit does not constitue an approval; the tco will be issued by the building inspector after building has been inspected and approved for occupancy. Date: May 23, 2013 Client: Post Goldtex Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 28, 2013 | Permit id: 473295 |