Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: January 22, 2016 Contractor: Breeze Point Heating And Air Conditioning Svc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 96 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: January 22, 2016 Contractor: Breeze Point Heating And Air Conditioning Svc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd w 225a msp upgrade. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 3 10 2017 plan chang upgrade msp to 225a... T. T. Date: January 30, 2017 Contractor: N B Baker Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 3, 2017 | Permit id: Pds2017-Resalt- | |||||
Rough electric Date: March 20, 2017 Permit status: Pass | Permit id: Pds2017-Resalt- |