Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit ![]() Client: Ajvazi Ismet | Permit status: Completed | Permit id: 538126 | |||||
Alteration permit ![]() Client: Ajvazi Ismet | Permit status: Completed | Permit id: 512055 | |||||
Electrical permit ![]() Client: Ajvazi Ismet | Permit status: Completed | Permit id: 543195 | |||||
Plumbing permit ![]() Client: Ajvazi Ismet | Permit status: Completed | Permit id: 537565 | |||||
Plumbing permit ![]() Client: Ajvazi Ismet | Permit status: Completed | Permit id: 537565 | |||||
Electrical permit ![]() Client: Ajvazi Ismet | Permit status: Completed | Permit id: 543195 | |||||
Alteration permit ![]() Client: Ajvazi Ismet | Permit status: Completed | Permit id: 562772 | |||||
Mechanical permit ![]() Client: Ajvazi Ismet | Permit status: Completed | Permit id: 538126 | |||||
SCORE 100 Installation of 1 hvac unit (including ductwork accessories). ![]() ![]() Client: Ajvazi Ismet | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 11, 2014 | Permit id: 538126 | |||||
SCORE 89 New electric wiring throughout the house with 100amp panel per 2008 nec (sfd) ![]() ![]() Client: Ajvazi Ismet | Permit type: Electrical permit | Permit status: Completed | Completion date: September 27, 2014 | Permit id: 543195 | |||||
Exterior stucco on rear of building and alley. Stucco_-_exterior plaster. Installation of these materials shall be in compliance with astmc926 and astmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Expanded metal or woven wire lath shall be attached with 1-1 2-inch-long (38 mm), 11 gage nails having a 7 16-inch (11. 1 mm) head, or 7 8-inch-long (22. 2 mm), 16 gage staples, spaced at no more than 6 inches (152 mm), or as otherwise approved. Contact inspector at district office for wall inspection prior to starting work. ![]() Client: Ajvazi Ismet | Permit type: Alteration permit | Permit status: Completed | Completion date: October 10, 2014 | Permit id: 562772 | |||||
Interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations. Separate permits required for plumbing, electric and hvac. ![]() Client: Ajvazi Ismet | Permit type: Alteration permit | Permit status: Completed | Completion date: October 10, 2014 | Permit id: 512055 | |||||
SCORE 100 Installation soil and waste piping and water supply piping to fixtures 2 toilets,2 lav,1 bath tub,1 kitchen and 1 laundry (sfd) ![]() ![]() Client: Ajvazi Ismet | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 12, 2015 | Permit id: 537565 |