Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Date: July 26, 2000 Permit status: Closed | Permit id: 99-05449 | |||||
SCORE 99 Comment date: fri mar 17 00:00: est 20 - air comfort responsible for the infloor heating only on this job, see letter. Sbrank. Electrical penalty pd 3-16- cash. Sb. 2nd mech permit created for j & m h Client: Koerber New Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 99-05449 | Parcel: 10433 | |||||
Air comfort responsible for the infloor heating only on this job, see letter. Sbrank. Electrical penalty pd 3-16- cash. Sb. 2nd mech permit created for j & m heating to install a. C. Equip & duct system, lineset, condensate drain, dryer vent & inside gas piping.; additional info. Submitted re: slab - sent for review 4/25; koerber new residence; penalty per jat on 12/2/99; by jsb; call maro slaughter at redacted phone number to schedule inspection.; erosion control measures not shown on plan;plan cannot be approved. I called applicant. Waiting to return my call.; front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. Setbacks also apply to porches, decks, etc.; building review comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made Permit type: Permits - historical | Permit status: Closed | Permit id: 99-05449 | Parcel: 10433 | |||||
Historical Date: July 26, 2000 Value: $34,000 Permit status: Closed | Permit id: 99-05449 | |||||
SCORE 99 Air comfort responsible for the infloor heating only on this job, see letter. Sbrank. Electrical penalty pd 3-16- cash. Sb. 2nd mech permit created for j & m h Client: Koerber New Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 99-05449 | Parcel: 10433 | |||||
SCORE 67 Comment date: fri mar 17 00:00: est 20 - air comfort responsible for the infloor heating only on this job, see letter. Sbrank. Electrical penalty pd 3-16- cash. Sb. 2nd mech permit created for j & m h Client: Koerber New Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 99-05449 | Parcel: 10433 | |||||
SCORE 98 Comment date: fri mar 17 00:00: est 20 - air comfort responsible for the infloor heating only on this job, see letter. Sbrank. Electrical penalty pd 3-16- cash. Sb. 2nd mech permit created for j & m h Client: Koerber New Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 99-05449 | Parcel: 10433 | |||||
SCORE 59 Comment date: fri mar 17 00:00: est 20 - air comfort responsible for the infloor heating only on this job, see letter. Sbrank. Electrical penalty pd 3-16- cash. Sb. 2nd mech permit created for j & m h Client: Koerber New Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 99-05449 | Parcel: 10433 | |||||
SCORE 95 Comment date: fri mar 17 00:00: est 20 - air comfort responsible for the infloor heating only on this job, see letter. Sbrank. Electrical penalty pd 3-16- cash. Sb. 2nd mech permit created for j & m h Client: Koerber New Residence | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 99-05449 | Parcel: 10433 | |||||
Air comfort responsible for the infloor heating only on this job, see letter. Sbrank. Electrical penalty pd 3-16- cash. Sb. 2nd mech permit created for j & m heating to install a. C. Equip & duct system, lineset, condensate drain, dryer vent & inside gas piping.; additional info. Submitted re: slab - sent for review 4 25; koerber new residence; penalty per jat on 12 2 99; by jsb; call maro slaughter at redacted phone number to schedule inspection.; erosion control measures not shown on plan;plan cannot be approved. I called applicant. Waiting to return my call.; front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. Setbacks also apply to porches, decks, etc.; building review comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made Date: July 26, 2000 Permit type: Permits - historical | Permit status: Closed | Permit id: 99-05449 | Parcel: 10433 |