Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Connect 3015 12th street, n. E. With underground service by building 15 of service conduit; sidewalk of irving street east of 12th street, n. E. Wr #3382323 tcp #custom cut #27524 stephen j. Park (202) 388-2573 sjpark@pepco. Com this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Date: May 16, 2012 Contractor: Pepco Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: August 17, 2012 | Permit id: Pa72115 | |||||
SCORE 93 Install 1 - 6" pvc sch- sanitary sewer lateral install conduit bank of two - 2" pvc sch- electrical conduit encased in concrete. Total: 1 (70x2) - 2" pvc sch-40 Date: June 14, 2012 Contractor: Muata Belton Client: Casey Trees | Permit type: Excavation; electric ml conduit (trench), excavation; sewer lateral connection over 4" pipe (trench) | Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | |||||
SCORE 95 Connect 3015 12th street, n. E. With underground service by building 15 of service conduit; sidewalk of irving street east of 12th street, n. E. Wr #3382323 tcp #custom cut #27524 stephen j. Park (202) 388-2573 sjpark@pepco. Com this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Date: August 16, 2012 Contractor: Pepco Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: November 18, 2012 | Permit id: Pa72115-R1 | |||||
SCORE 95 Construction staging area Date: September 5, 2012 Contractor: Pepco Holdings Inc Permit status: Expired | Expiration date: October 9, 2012 | Permit id: Pa10071904 | |||||
SCORE 82 Construction staging area Date: June 14, 2012 Contractor: Jim Griffin Permit status: Expired | Expiration date: August 31, 2012 | Permit id: Pa10062763 | |||||
SCORE 93 Excavation; electric ml conduit (trench), excavation; sewer lateral connection over 4" pipe (trench) Contractor: Muata Belton Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 82 Install 1 - 6" pvc sch- sanitary sewer lateral install conduit bank of two - 2" pvc sch- electrical conduit encased in concrete. Total: 1 (70x2) - 2" pvc sch-40 Contractor: Jim Griffin Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 82 Refer to approved traffic control plan (tcp) for permitted hours of work; install 6" pvc sch- sanitary sewer lateral to existing 18" combined sewer main with clean out; abandon remove small sewer service; attached plans and conditions are part of this permit Date: July 31, 2012 Contractor: Jim Griffin Permit status: Permit expired | Expiration date: September 29, 2012 | Permit id: Pa72790 | |||||
SCORE 93 Refer to approved traffic control plan (tcp) for permitted hours of work; install 6" pvc sch- sanitary sewer lateral to existing 18" combined sewer main with clean out; abandon remove small sewer service; attached plans and conditions are part of this permit Date: June 12, 2012 Contractor: Muata Belton Client: Casey Trees | Permit type: Excavation; sewer lateral connection over 4" pipe (trench), excavation; sewer service lateral abandonment, excavation; clean out (sewer) | Permit status: Permit expired | Expiration date: September 29, 2012 | Permit id: Pa72790 | |||||
SCORE 95 Connect 3015 12th street, n. E. With underground service by building 15 of service conduit; sidewalk of irving street east of 12th street, n. E. Wr #3382323 tcp #custom cut #27524 stephen j. Park (202) 388-2573 sjpark@pepco. Com this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Date: June 12, 2012 Contractor: Pepco Permit status: Permit expired | Expiration date: August 17, 2012 | Permit id: Pa72115 | |||||
SCORE 93 Refer to approved traffic control plan (tcp) for permitted hours of work; install 6" pvc sch- sanitary sewer lateral to existing 18" combined sewer main with clean out; abandon/remove small sewer service; attached plans and conditions are part of this permit Date: June 12, 2012 Contractor: Muata Belton Client: Casey Trees | Permit type: Excavation; sewer lateral connection over 4" pipe (trench), excavation; sewer service lateral abandonment, excavation; clean out (sewer) | Permit status: Permit expired | Expiration date: September 29, 2012 | Permit id: Pa72790 | |||||
SCORE 93 Excavation; electric ml conduit (trench), excavation; sewer lateral connection over 4" pipe (trench) Contractor: Muata Belton Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 82 Install 1 - 6" pvc sch- sanitary sewer lateral install conduit bank of two - 2" pvc sch- electrical conduit encased in concrete. Total: 1 (70x2) - 2" pvc sch-40 Contractor: Jim Griffin Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | Permit id: 0 |