Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 91 Remove and replace mech room roof Client: City Of Grand Rapids | Permit type: Building permit - commercial renovation (interior & exterior) | Permit status: Closed-admin | Expiration date: January 20, 2003 | Permit id: B02-13561 | |||||
Remove and replace mech room roof Date: July 24, 2002 Value: $424,000 Permit status: Closed-admin | Permit id: B02-13561 | |||||
Rmdl int Date: October 23, 2003 Value: $91,000 Client: City Of Grand Rapids | Permit type: Building permit - commercial renovation (interior & exterior) | Permit status: Closed-admin | Expiration date: April 20, 2004 | Permit id: B03-15939 | |||||
Replace chiller Date: January 26, 2004 Value: $410,000 Client: City Of Grand Rapids | Permit type: Building permit - commercial renovation (interior & exterior) | Permit status: Closed-admin | Expiration date: July 24, 2004 | Permit id: B04-16352 | |||||
Renovate monroe/2nd/3rd floor Date: January 5, 2006 Value: $70,952 Client: City Of Grand Rapids | Permit type: Building permit - commercial renovation (interior & exterior) | Permit status: Closed-use and occupancy | Expiration date: March 5, 2007 | Permit id: B06-20678 | |||||
Ada updates (multiple jobs all under one set of plans 3 monroe Date: March 10, 2008 Value: $682,800 Client: City Of Grand Rapids | Permit type: Building permit - commercial renovation (interior & exterior) | Permit status: Waiting to inspect | Expiration date: September 6, 2008 | Permit id: B08-24980 | |||||
Fuller reconstruction apa Date: June 13, 2006 Permit status: Closed-finaled | Completion date: August 21, 2006 | Permit id: Ldp06-017 | |||||
Reconstruction of south division ave Date: June 13, 2006 Permit status: Closed-finaled | Completion date: December 8, 2006 | Permit id: Ldp06-018 | |||||
Replace the existing bus shelter and maintain. Date: July 3, 1986 Permit status: Closed-issued | Completion date: July 6, 2016 | Permit id: Encr-1986-0114 | |||||
Place 4 cbs with leads, remove and replace road, curb and gutter and sidewalk. Date: June 6, 2007 Permit status: Closed-finaled | Completion date: October 5, 2007 | Permit id: Ldp07-085 | |||||
Watermain replacement on the north side of 33rd st from eastern ave to 13 east of eastern ave. Date: June 7, 2007 Permit status: Closed-finaled | Completion date: August 16, 2007 | Permit id: Ldp07-087 | |||||
Install 72" trunk line sewer and manholes Date: July 13, 2009 Permit status: Closed-finaled | Completion date: January 3, 2011 | Permit id: Ldp09-123 | |||||
Placement of erosion control measures to stabilize drain bottom and slopes Date: July 28, 2009 Permit status: Closed-finaled | Completion date: March 24, 2010 | Permit id: Ldp09-138 | |||||
Resurface scribner ave and turner ave Date: May 12, 2010 Permit status: Monitor | Completion date: September 20, 2010 | Permit id: Ldp10-075 | |||||
Remove west 1 2 of plymouth avenue, install wtermain, replace road. Date: September 19, 2008 Permit status: Closed-finaled | Completion date: June 25, 2009 | Permit id: Ldp08-198 | |||||
Ionia ave reconstruction Date: June 13, 2006 Permit status: Closed-finaled | Completion date: December 21, 2006 | Permit id: Ldp06-024 | |||||
Replace wm in chamberlain, eastbrook & clearbrook Date: April 20, 2010 Permit status: Closed-finaled | Completion date: October 27, 2010 | Permit id: Ldp10-059 | |||||
Replace sidewalk ramps (ada) lower adjust mhs retomill and resurfacing of hall st Date: June 18, 2010 Permit status: Closed-finaled | Completion date: July 22, 2010 | Permit id: Ldp10-094 | |||||
Sewer separation. Water main installation. Road reconstruction. Date: May 8, 2008 Permit status: Closed-finaled | Permit id: Ldp08-091 | |||||
Installation of watermain and storm sewer. Date: April 20, 2009 Permit status: Closed-finaled | Completion date: July 29, 2009 | Permit id: Ldp09-044 | |||||
Curb replacement Date: June 13, 2006 Permit status: Closed-finaled | Completion date: August 23, 2006 | Permit id: Ldp06-026 | |||||
Reconstruction of roadway, sanitary and watermain. Date: July 28, 2008 Permit status: Closed-finaled | Completion date: October 29, 2008 | Permit id: Ldp08-159 | |||||
Install new sanitary sewer, watermain, storm sewer and road reconstruction. Date: March 21, 2008 Permit status: Closed-finaled | Permit id: Ldp08-035 | |||||
Reconstruct knapp st for the city of grand rapids including water, storm sewer, sanitary sewer road work.. Date: March 24, 2008 Permit status: Closed-finaled | Permit id: Ldp08-033 | |||||
Sesc permit to replace 1,385 ft of watermain and water services to homes. Date: March 19, 2009 Permit status: Closed-finaled | Completion date: July 8, 2009 | Permit id: Ldp09-015 | |||||
Install new watermain, storm sewer, sanitary sewer, remove and replace road. Date: June 21, 2007 Permit status: Closed-finaled | Completion date: December 19, 2007 | Permit id: Ldp07-101 | |||||
Install drainage structures in leonard st alley and install entire alley with concrete. Date: April 18, 2007 Permit status: Closed-finaled | Completion date: May 21, 2007 | Permit id: Ldp07-034 | |||||
Remove existing sidewalk, stairs, site furnishings and replace all walk, install electrical, snow melt and minor storm and water main. Date: September 23, 2008 Permit status: Closed-finaled | Completion date: July 20, 2009 | Permit id: Ldp08-201 | |||||
Curb replacement, crushing and shaping, roto-milling, and paving. Date: April 2, 2008 Permit status: Closed-finaled | Permit id: Ldp08-043 | |||||
Install new sanitary sewer, watermain & minor storm sewer work; remove old road, put back new Date: August 23, 2006 Permit status: Closed-finaled | Completion date: November 30, 2006 | Permit id: Ldp06-058 | |||||
Watermain, street construction, brick pavers, sidewalk, city beautification Date: May 7, 2010 Permit status: Closed-finaled | Completion date: October 27, 2010 | Permit id: Ldp10-069 | |||||
Replacement of watermain sanitary and storm sewers also placement of telecommunication ducts. Date: May 21, 2009 Permit status: Closed-finaled | Completion date: November 25, 2009 | Permit id: Ldp09-070 | |||||
City contract no. 14: install new sanitary, storm, and watermain; road reconstruction Date: May 1, 2009 Permit status: Closed-finaled | Completion date: May 13, 2010 | Permit id: Ldp09-055 | |||||
Reconstruct surface areas and install new underground sanitary sewer and watermain. Date: August 18, 2008 Permit status: Closed-finaled | Completion date: May 7, 2009 | Permit id: Ldp08-169 | |||||
Temporary occupancy of public right-of-way: sidewalk Date: May 13, 2015 Permit status: Issued | Permit id: Top-2015-0202 | |||||
This is a complete reconstruction job for the city including (storm water, sewer, street lighting, concrete and new asphalt). Date: May 6, 2008 Permit status: Closed-finaled | Permit id: Ldp08-081 | |||||
Mdot 0908 612 contract id 41401-104177 madison ave water-sanitary-storm-roadwork-sidewalk reconstruction. Highland to adams & hall, jefferson to madison Date: February 25, 2010 Permit status: Closed-finaled | Completion date: October 12, 2010 | Permit id: Ldp10-018 | |||||
Temporary occupancy of public right-of-way: sidewalk Date: November 21, 2014 Permit status: Closed-finaled | Permit id: Top-2014-0475 | |||||
Bridge and approach repair. Date: April 21, 2008 Permit status: Closed-finaled | Permit id: Ldp08-060 | |||||
Reconstruction of sheldon ave - including underground sanitary storm and water main replacement. Date: August 13, 2009 Permit status: Closed-finaled | Completion date: April 9, 2010 | Permit id: Ldp09-153 | |||||
1. 2 miles of asphalt resurfacing Date: April 15, 2010 Permit status: Closed-finaled | Completion date: June 30, 2010 | Permit id: Ldp10-046 | |||||
Placement of new 21" sanitary sewer along pulic easement (abandoned r r corridor) 31 feet east of elmridge to three mile rd. . 75a in grand rapids and 4. 25a in walker. Date: September 26, 2007 Permit status: Closed-finaled | Permit id: Ldp07-187 | |||||
Remove & replace sanitary storm sewers, water main. Replace curb & gutter and replace asphalt surface. Date: September 11, 2007 Permit status: Closed-finaled | Permit id: Ldp07-181 | |||||
Streetscape project placing concrete sidewalk, brick pavers and new street lighting. Date: April 7, 2008 Permit status: Closed-finaled | Permit id: Ldp08-050 | |||||
Watermain replacement and restoration Date: July 15, 2009 Permit status: Closed-finaled | Completion date: October 13, 2009 | Permit id: Ldp09-128 | |||||
Replace curb and driveway approaches Date: September 12, 2006 Permit status: Closed-finaled | Completion date: November 22, 2006 | Permit id: Ldp06-067 | |||||
Temporary occupancy of public right-of-way: traffic lane Date: November 26, 2013 Permit status: Closed-finaled | Permit id: Top-2013-0420 | |||||
Removing pavement, sidewalk, curb and gutter and reconstructing water mains, sanitary sewer, storm sewer, curb and gutter, sidewalks, street lighting and pavement Date: October 24, 2007 Permit status: Closed-finaled | Permit id: Ldp07-209 | |||||
Division ave reconstruction Date: August 7, 2006 Permit status: Closed-finaled | Completion date: August 29, 2006 | Permit id: Ldp05-053 | |||||
Lake mi filtration plant - stand-by power system Date: August 2, 2006 Permit status: Closed-finaled | Completion date: August 23, 2006 | Permit id: Ldp05-059 | |||||
Reconstruct cherry including sanitary, storm, watermain and paving. Date: April 26, 2007 Permit status: Closed-finaled | Completion date: July 13, 2007 | Permit id: Ldp07-033 | |||||
Road reconstruction, sewer, water and street lighting. Date: May 6, 2008 Permit status: Closed-finaled | Permit id: Ldp08-076 | |||||
Install watermain Date: June 10, 2009 Permit status: Closed-finaled | Completion date: June 23, 2010 | Permit id: Ldp09-095 | |||||
Resurfacing of east paris Date: April 15, 2010 Permit status: Closed-finaled | Completion date: July 22, 2010 | Permit id: Ldp10-055 | |||||
Indian mill creek trunk sewer improv Date: June 13, 2006 Permit status: Closed-finaled | Completion date: August 6, 2007 | Permit id: Ldp06-019 | |||||
Transmission watermain - contract 3 Date: June 13, 2006 Permit status: Closed-finaled | Completion date: December 20, 2006 | Permit id: Ldp06-014 | |||||
Road reconstruction, sewer, water, and street lighting. Date: May 6, 2008 Permit status: Closed-finaled | Permit id: Ldp08-077 | |||||
Occupy sidewalk while tearing town retaining walls Date: August 8, 2014 Permit status: Closed-finaled | Permit id: Top-2014-0317 | |||||
Remove sidewalk, install electrical conduits & add 1 lane on winter ave. At lake michigan dr. Date: July 20, 2006 Permit status: Closed-finaled | Completion date: September 29, 2006 | Permit id: Ldp06-043 | |||||
Reconstruct wealthy st. Including sanitary, storm, watermain, street lighting and paving. Date: April 26, 2007 Permit status: Closed-finaled | Completion date: December 12, 2007 | Permit id: Ldp07-035 | |||||
Full street reconstruction - replace watermain, storm sewer, sanitary sewer and install electrical conduit. Date: March 20, 2008 Permit status: Closed-finaled | Permit id: Ldp08-034 | |||||
Reconstruction of goodrich st. From division ave. To lagrave ave. Date: July 11, 2008 Permit status: Closed-finaled | Completion date: September 12, 2008 | Permit id: Ldp08-151 | |||||
A bus shelter to be built and maintained by the rapid brt at 299 monroe, nw. Owner during the encroachment is under contact. The address provided could not be found and 3 monroe was chosen. Date: January 7, 2013 Permit status: Closed-issued | Completion date: August 30, 2016 | Permit id: Encr-2013-0458 | |||||
Tent for tour de cure event. 9 11 16. Date: August 29, 2016 Value: $1,000 Permit status: Closed-finaled | Completion date: October 18, 2016 | Permit id: Bc-Reno-2016-19 | |||||
Underground road construction Date: October 27, 2006 Permit status: Closed-finaled | Completion date: November 7, 2007 | Permit id: Ldp06-092 | |||||
Curb and gutter and sidewalk removal, new installation of curb and gutter, brick pavers, sidewalk, trees and street lighting. Date: May 16, 2007 Permit status: Closed-finaled | Completion date: October 3, 2007 | Permit id: Ldp07-060 | |||||
Curb and gutter removal and replacement, sidewalk removal and replacement, drive approach removal and replacement, cold milling, manhole and valve box adjustments, and lawn restoration. Date: September 15, 2009 Permit status: Closed-finaled | Completion date: January 5, 2011 | Permit id: Ldp09-176 | |||||
Complete reconstruction of leonard from nixon to collindale, including curb, watermain, storm sewer Date: July 9, 2009 Permit status: Closed-finaled | Completion date: December 2, 2009 | Permit id: Ldp09-124 | |||||
Build and maintain bus shelter. Date: February 22, 1979 Permit status: Closed-issued | Completion date: July 6, 2016 | Permit id: Encr-1979-0115 | |||||
Install 48" san swr in unimproved easement thru wetlands including wetland restoration. Date: March 24, 2010 Permit status: Closed-finaled | Completion date: June 3, 2011 | Permit id: Ldp10-034 | |||||
Replace 14 of 6" watermain; 27 water services Date: June 2, 2008 Permit status: Closed-finaled | Permit id: Ldp08-106 | |||||
Curb and sidewalk improvement. Date: May 8, 2008 Permit status: Closed-finaled | Permit id: Ldp08-084 | |||||
Road reconstruction, sewer, water, and streetlighting. Date: May 2, 2008 Permit status: Closed-finaled | Permit id: Ldp08-075 | |||||
New 48" to 72" swr pipe, abandonment of portion of 21" swr pipe jacking, restoration adn creek crossings. Work in public easement and through wetlands and floodplains within the city of kentwood Date: May 5, 2010 Permit status: Closed-finaled | Completion date: December 15, 2011 | Permit id: Ldp10-067 | |||||
Road recon of jefferson ave incl watermain, sanitary, storm, street lighting, surface improvements Date: March 11, 2009 Permit status: Closed-finaled | Completion date: August 6, 2009 | Permit id: Ldp09-014 | |||||
Renovate monroe 2nd 3rd floor Date: January 5, 2006 Value: $70,952 Client: City Of Grand Rapids | Permit type: Building permit - commercial renovation (interior & exterior) | Permit status: Closed-use and occupancy | Expiration date: March 5, 2007 | Permit id: B06-20678 | |||||
Sanitary sewer mainline (110) with (1) 6" lateral and (1) (1") waterservice with tap. Date: March 20, 2008 Permit status: Closed-finaled | Permit id: Ldp08-023 | |||||
Other Date: May 10, 2012 Permit status: Closed-finaled | Permit id: Top-2012-0123 | |||||
Replace watermain & restore existing condotions.. Top & ep requirements waived per city instructions Date: April 28, 2010 Permit status: Closed-finaled | Completion date: October 12, 2010 | Permit id: Ldp10-066 | |||||
Replacement of existing watermain along 32nd st e of kalamazoo & along kalamazoo s of 32nd st. Date: May 1, 2008 Permit status: Closed-finaled | Permit id: Ldp08-080 | |||||
Total reconstruction of grandville ave. From wealthy st. To cherry st., including sanitary sewer, stormwater, and water Date: March 14, 2007 Permit status: Closed-finaled | Completion date: November 7, 2007 | Permit id: Ldp07-020 | |||||
Remove and replace existing pavement and drive approaches. Date: July 28, 2009 Permit status: Closed-finaled | Completion date: October 28, 2009 | Permit id: Ldp09-142 | |||||
Remove and replace curbs, drives and walks. Rotomill asphalt and adjust casting, topsoil seed and fertilize. Date: September 16, 2008 Permit status: Closed-finaled | Completion date: November 19, 2008 | Permit id: Ldp08-196 | |||||
Reconstruct pub row - curtis paris columia penn union kent hills page spencer - undergrnd sewer, storm sewer & watermain replacement Date: April 27, 2010 Permit status: Closed-finaled | Completion date: July 21, 2011 | Permit id: Ldp10-064 | |||||
Road construction with new sewer and watermain. Date: June 5, 2007 Permit status: Closed-finaled | Completion date: December 7, 2007 | Permit id: Ldp07-080 | |||||
Installation of sanitary sewer. Date: September 8, 2008 Permit status: Closed-finaled | Completion date: August 3, 2009 | Permit id: Ldp08-183 | |||||
Road reconstructon, watermain and stormsewer. Date: March 28, 2008 Permit status: Closed-finaled | Permit id: Ldp08-042 | |||||
Mdot #1005-037 fuller ave - rotomill resurface fuller from knapp to plainfield Date: June 25, 2010 Permit status: Closed-finaled | Completion date: October 28, 2010 | Permit id: Ldp10-095 | |||||
Combined sewer overflow contract #2b, buchanan-pleasant-ionia Date: August 2, 2006 Permit status: Closed-finaled | Completion date: October 11, 2006 | Permit id: Ldp05-079 | |||||
Sesc permit for sanitary, watermain, storm, road reconstruction Date: April 14, 2009 Permit status: Closed-finaled | Completion date: October 15, 2009 | Permit id: Ldp09-041 | |||||
Wealthy street reconstruction: franklin reservoir contract #2 Date: May 29, 2007 Permit status: Closed-finaled | Completion date: December 13, 2007 | Permit id: Ldp07-071 | |||||
Installing 6" watermain on russwood from college to borglum ne Date: August 1, 2006 Permit status: Closed-finaled | Completion date: October 13, 2006 | Permit id: Ldp06-047 | |||||
Sanitary sewer, storm sewer & watermain installation; road reconstruction Date: August 22, 2006 Permit status: Closed-finaled | Completion date: January 11, 2007 | Permit id: Ldp06-055 | |||||
Install and maintain a bus passenger shelter site. Date: July 5, 1977 Permit status: Closed-issued | Completion date: June 20, 2016 | Permit id: Encr-1977-0001 | |||||
Construction of a new open-air bus shelter and elevated platform with associated site work Date: March 28, 2013 Permit status: Closed-finaled | Permit id: L-Plan-2013-000 | |||||
Construction of dual 10" dr-7 hdpe pipelines in the same trench between the two plants. Date: December 5, 2007 Permit status: Closed-finaled | Permit id: Ldp07-262 | |||||
Install sanitary sewer system in newberry st alley. Work is being done for city of grand rapids engineering dept. Date: November 25, 2008 Permit status: Closed-finaled | Completion date: May 5, 2009 | Permit id: Ldp08-255 | |||||
Install watermain in west lane of breton ave from burton north to city limits. Mill east lanes and repair entire roadway. Date: August 4, 2009 Permit status: Closed-finaled | Completion date: November 6, 2009 | Permit id: Ldp09-145 | |||||
Installation of new watermains, sanitary sewer, storm sewer and remove and replace road on fuller avenue. Date: March 15, 2007 Permit status: Closed-finaled | Completion date: December 12, 2007 | Permit id: Ldp07-021 | |||||
Lift station bldg construction and forcemain replacement. Date: November 6, 2007 Permit status: Closed-finaled | Permit id: Ldp07-227 | |||||
Complete replacement storm, sanitary, water, curb and sidewalk Date: May 3, 2010 Permit status: Closed-finaled | Completion date: July 14, 2011 | Permit id: Ldp10-065 | |||||
Eastside sewer improvements separation project-contract #19 reconstruction of row bemis baxter diamond dolbee neland. Date: March 2, 2010 Permit status: Closed-finaled | Completion date: November 18, 2010 | Permit id: Ldp10-021 | |||||
Reconstruction of cherry st including watrmain and storm sewer. Date: August 12, 2009 Permit status: Closed-finaled | Completion date: December 30, 2009 | Permit id: Ldp09-152 | |||||
Temporary occupancy of public right-of-way: sidewalk Date: February 22, 2016 Permit status: Issued | Permit id: Top-2016-0057 | |||||
. 68 mi of hot mix asphalt reconstruction paving, curb and gutter, drainage structurers, sanitary and storm sewer, street lighting, pavement markings and landscaping. Date: June 16, 2008 Permit status: Closed-finaled | Permit id: Ldp08-121 | |||||
Install 12,0 of trunk sanitary sewer parallel to indian mill creek. Work is mostly in city of walker. Small area in city of grand rapids. Date: April 16, 2007 Permit status: Closed-finaled | Completion date: August 27, 2008 | Permit id: Ldp07-032 | |||||
Install watermain-sanitary-storm-paving-restoration. Eastside sewer improvements. Date: February 24, 2010 Permit status: Closed-finaled | Completion date: November 23, 2010 | Permit id: Ldp10-019 | |||||
Logan st. Apa - cso 2a Date: June 28, 2006 Permit status: Closed-finaled | Completion date: March 27, 2008 | Permit id: Ldp06-031 | |||||
Ottawa ave. Reconstruction - new storm sewer, watermain, curbs & gutter, paving Date: July 10, 2006 Permit status: Closed-finaled | Completion date: December 8, 2006 | Permit id: Ldp06-038 | |||||
Hall st. Reconstruction, watermain & sewer Date: July 19, 2006 Permit status: Closed-finaled | Completion date: November 30, 2006 | Permit id: Ldp06-040 | |||||
Rotomilling & resurfacing of kalamazoo ave. Date: July 26, 2006 Permit status: Closed-finaled | Completion date: September 22, 2006 | Permit id: Ldp06-042 | |||||
Install sanitary forcemain by directional drill & open cut Date: June 22, 2009 Permit status: Closed-finaled | Completion date: November 9, 2009 | Permit id: Ldp09-080 | |||||
Install and maintain an aluminum bus passenger shelter. Date: April 20, 1987 Permit status: Closed-issued | Completion date: June 20, 2016 | Permit id: Encr-1987-0003 | |||||
Curb replacement in hancock, temple, college, logan and sigsbee Date: April 8, 2010 Permit status: Closed-finaled | Completion date: September 15, 2010 | Permit id: Ldp10-047 | |||||
Replace watermain in louis st. From monroe to ottawa Date: August 23, 2006 Permit status: Closed-finaled | Completion date: September 8, 2006 | Permit id: Ldp06-057 | |||||
Constructing a bridge over the mid-michigan railroad. Date: May 2, 2008 Permit status: Closed-finaled | Permit id: Ldp08-071 | |||||
Reconstruction of hall st. Including underground sanitary sewer and watermain replacement Date: June 15, 2009 Permit status: Closed-finaled | Completion date: April 9, 2010 | Permit id: Ldp09-090 | |||||
Temporary occupancy of public right-of-way: sidewalk, parking lane, traffic lane Date: June 12, 2015 Permit status: Issued | Permit id: Top-2015-0252 | |||||
Sesc permit for emergency replacement of water main and san sewer in whalen ct. Date: October 31, 2008 Permit status: Closed-finaled | Completion date: June 22, 2009 | Permit id: Ldp08-236 | |||||
Reconstruct madison ave. Incl storm sewer, sanitary sewer, watermain; road reconstruction Date: July 13, 2009 Permit status: Closed-finaled | Completion date: May 12, 2010 | Permit id: Ldp09-122 | |||||
Remove older surface asphalt & replace with new concrete surface; approximately 2 ft long Date: September 7, 2006 Permit status: Closed-finaled | Completion date: September 25, 2006 | Permit id: Ldp06-066 | |||||
Eastside sewer separation project Date: August 4, 2006 Permit status: Closed-finaled | Completion date: November 22, 2006 | Permit id: Ldp05-031 | |||||
Corner improvements: site grading, landscaping, modular block retaining wall, flag poles, irrigation, electrical Date: September 15, 2006 Permit status: Closed-finaled | Completion date: April 18, 2007 | Permit id: Ldp06-070 | |||||
Reconstruction of weston st. And commerce alley Date: August 31, 2009 Permit status: Closed-finaled | Completion date: November 25, 2009 | Permit id: Ldp09-121 | |||||
New sanitary, water main, storm sewer, communication conduits, reconstruction of street and sidewalks Date: June 25, 2009 Permit status: Closed-finaled | Completion date: December 4, 2009 | Permit id: Ldp09-103 | |||||
Installing watermain, sanitary and storm sewer and road reconstruction. Date: August 13, 2009 Permit status: Closed-finaled | Completion date: April 13, 2010 | Permit id: Ldp09-154 | |||||
Roadway reconstruction with new storm and sanitary sewer and water main. Date: April 10, 2007 Permit status: Closed-finaled | Completion date: November 16, 2007 | Permit id: Ldp07-023 | |||||
Reconstruction of alpine ave over indian mill creek including 3 feet each side of bridge along alpine ave Date: April 2, 2007 Permit status: Closed-finaled | Completion date: August 24, 2007 | Permit id: Ldp07-026 | |||||
Site work and preparation for rain garden Date: July 26, 2007 Permit status: Closed-finaled | Permit id: Ldp07-133 | |||||
Bridge reconstruction Date: July 26, 2007 Permit status: Closed-finaled | Permit id: Ldp07-134 | |||||
Soil erosion & sedimentation control for wealthy st. Bridge rehabilitation Date: April 8, 2009 Permit status: Closed-finaled | Completion date: June 2, 2009 | Permit id: Ldp09-027 | |||||
7th floor interior remodel Date: September 10, 2014 Value: $40,000 Permit status: Closed-finaled | Completion date: February 17, 2015 | Permit id: Bc-Int-2014-183 | |||||
Renovations to city commission chambers on the 9th floor at city hall. Date: August 14, 2015 Value: $465,475 Permit status: Closed-use and occupancy | Completion date: December 4, 2015 | Permit id: Bc-Int-2015-142 | |||||
Putting up a tent to hold a santa land expo. Date: November 14, 2011 Value: $1,500 Permit status: Closed-no response | Completion date: May 24, 2012 | Permit id: Bc-New-2011-183 | |||||
Tent Date: December 8, 2011 Value: $1,000 Permit status: Closed-no response | Completion date: June 15, 2012 | Permit id: Bc-New-2011-197 | |||||
7 temp tents over 1 sq ft Date: February 8, 2012 Value: $1,000 Permit status: Closed-admin | Permit id: Bc-New-2012-008 | |||||
Tents for the fifth third riverbank run Date: February 9, 2012 Value: $1,000 Permit status: Closed-admin | Permit id: Bc-New-2012-011 | |||||
Tent permit on clader plaza on 3 23 12 Date: March 22, 2012 Value: $500 Permit status: Closed-admin | Permit id: Bc-New-2012-033 | |||||
30x tent special event on ionia Date: May 1, 2012 Value: $400 Permit status: Closed-admin | Permit id: Bc-New-2012-059 | |||||
Construct of a new open-air bus shelter and elevated platform with associated site work Date: March 28, 2013 Value: $350,000 Permit status: Closed-use and occupancy | Completion date: September 10, 2014 | Permit id: Bc-New-2013-004 | |||||
20x canopy Date: June 12, 2013 Value: $1,000 Permit status: Closed-finaled | Completion date: July 22, 2013 | Permit id: Bc-New-2013-092 | |||||
Art prize art project stairs and landing gillett bridge (between ah-hab-aweh park & devos place) Date: September 12, 2013 Value: $6,696 Permit status: Not approved | Permit id: Bc-New-2013-157 | |||||
Building permit for a x tent. Tent is to be secured w water ballast. Occupancy must conform to mbc 2012. Tent must be evacuated if wind speed exceeds 30mph. Date: October 29, 2014 Permit status: Closed-admin | Permit id: Bc-New-2014-225 | |||||
Temporary art piece - art prize entry 4x8 "one sorry enhibit" Date: August 25, 2015 Permit status: Closed-admin | Permit id: Bc-New-2015-176 | |||||
Building a new mechanical room & demolition & replacement of 3 parking deck ramps which include a new hydronic snowmelt tubing system Date: June 15, 2015 Value: $578,957 Permit status: Closed-use and occupancy | Completion date: December 21, 2015 | Permit id: Bc-New-2015-099 | |||||
Temporary public art installation for artprize 2016 on the gillette bridge - as i went over the water, the water went over me. Date: September 8, 2016 Value: $10,000 Permit status: Waiting to inspect | Permit id: Bc-New-2016-164 | |||||
Replace existing single pane glass with double pane. Upgrade structural attachments, clean & recaulk facade. Date: July 22, 2011 Value: $1,300,000 Permit status: Closed-no resonse | Completion date: January 31, 2012 | Permit id: Bc-Reno-2011-10 | |||||
4 tents set up on louis st monroe av mph max wind blow Date: December 27, 2012 Permit status: Closed-finaled | Completion date: February 13, 2013 | Permit id: Bc-Reno-2012-23 | |||||
Erect a x 2 tent on the gillett bridge and 8 x at the mouth of the bridge in ah nab awen park from 05 14 2014 to 05 16 2014 Date: May 7, 2014 Value: $1,000 Permit status: Closed-finaled | Completion date: June 16, 2014 | Permit id: Bc-Reno-2014-06 | |||||
21 tents at riverside park 08 14 2014 to 08 17 2014 Date: August 13, 2014 Value: $1,000 Permit status: Closed-finaled | Completion date: September 15, 2014 | Permit id: Bc-Reno-2014-16 | |||||
Two tents. X and x 30. Date: December 23, 2014 Permit status: Closed-admin | Completion date: May 26, 2015 | Permit id: Bc-Reno-2014-26 | |||||
Two tents for event 1 23 16 - 1 24 16 at rosa parks circle Date: December 30, 2015 Value: $3,000 Permit status: Closed-no resonse | Completion date: July 15, 2016 | Permit id: Bc-Reno-2015-27 | |||||
: installation of saddle tent contingent upon properly sized ballasts are installed in accordance with ctm engineering design specifications and as located as requested per city of grand rapids engineer. We still need to review and approve ballast containers 5 tents for special events Date: May 13, 2016 Permit status: Closed-finaled | Completion date: June 20, 2016 | Permit id: Bc-Reno-2016-09 | |||||
Tents Date: May 31, 2016 Permit status: Closed-admin | Completion date: June 20, 2016 | Permit id: Bc-Reno-2016-11 | |||||
X tent on gillette bridge for naa event Date: July 13, 2016 Permit status: Closed-finaled | Completion date: August 19, 2016 | Permit id: Bc-Reno-2016-15 | |||||
Riverside park - tent for company picnic Date: August 8, 2016 Permit status: Waiting to inspect | Permit id: Bc-Reno-2016-17 | |||||
Set up (2) x tents and (1) x tent (3 fuller av ne) Date: August 22, 2016 Permit status: Waiting to inspect | Permit id: Bc-Reno-2016-18 | |||||
New roof for city hall Date: May 9, 2012 Value: $371,045 Permit status: Closed-no response | Completion date: November 16, 2012 | Permit id: Bc-Rfsd-2012-06 | |||||
Install roof Date: July 22, 2015 Value: $64,000 Permit status: Closed-no response | Completion date: February 2, 2016 | Permit id: Bc-Rfsd-2015-15 | |||||
The structure will be 32l x 21w x 20h, an ellipsoid surface of weathereing steel frustums, attached to an elliptical steel ring base. Date: October 6, 2016 Value: $40,000 Permit status: Waiting to inspect | Permit id: Bc-New-2016-184 | |||||
Install temporary artprize sculpture at 296 lyon st nw (lyon square) Date: September 6, 2016 Value: $25,000 Permit status: Closed-finaled | Completion date: October 25, 2016 | Permit id: Bc-Reno-2016-20 | |||||
X tent on calder plaza for artprize Date: September 20, 2016 Permit status: Waiting to inspect | Permit id: Bc-Reno-2016-21 | |||||
Two x 1 tents for grand rapids on tap Date: July 12, 2016 Permit status: Closed-admin | Permit id: Bc-Reno-2016-15 | |||||
Tent on clader plaza for 2016 hispanic festival x 1 and x tents Date: August 17, 2016 Permit status: Closed-finaled | Completion date: September 26, 2016 | Permit id: Bc-Reno-2016-18 | |||||
Removal relocation of existing walls and doors. Installation of new walls and doors. Installation of new ceiling in 1 room. Repaint all. Date: September 8, 2017 Value: $69,102 Permit status: Waiting to inspect | Permit id: Bc-Int-2017-215 | |||||
Tent on clader plaza for 2016 hispanic festival x 1 and x tents Date: August 17, 2016 Value: $1,000 Permit status: Closed-finaled | Completion date: September 26, 2016 | Permit id: Bc-Reno-2016-18 | |||||
X tent on gillette bridge for naa event Date: July 13, 2016 Value: $50 Permit status: Closed-finaled | Completion date: August 19, 2016 | Permit id: Bc-Reno-2016-15 | |||||
Tents Date: May 31, 2016 Value: $999 Permit status: Closed-admin | Completion date: June 20, 2016 | Permit id: Bc-Reno-2016-11 | |||||
Remove and replace mech room roof Date: July 24, 2002 Value: $424,000 Permit status: Closed-admin | Permit id: B02-13561 | |||||
Improve remodel existing empty room into an office conference room Date: June 8, 2017 Value: $55,606 Permit status: Closed-use and occupancy | Completion date: August 24, 2017 | Permit id: Bc-Reno-2017-11 | |||||
Temporary occupancy of public right-of-way: sidewalk Date: October 24, 2017 Permit status: Issued | Permit id: Top-2017-0490 | |||||
Test test test Date: November 14, 2017 Permit status: Waiting to inspect | Permit id: Sw-Per-2017-014 | |||||
Test test test test Date: November 8, 2017 Permit status: Closed-approved | Completion date: November 8, 2017 | Permit id: Sw-Per-2017-014 | |||||
Sidewalk and traffic closure for crane lift Date: November 27, 2012 Permit status: Closed-finaled | Permit id: Top-2012-0396 | |||||
Temporary occupancy @ 3 monroe ave nw - kent county bldg - of front of bldg for equipment placement for roof replacement. Date: September 2, 2009 Permit status: Closed-finaled | Completion date: September 11, 2009 | Permit id: Ldp09-160 | |||||
Exterior windows to be removed and replaced Date: September 9, 2011 Value: $389,700 Permit status: Closed-no resonse | Completion date: December 18, 2012 | Permit id: Bc-Reno-2011-14 | |||||
New 155 sq ft. Airlock vestibule to be built within the existing lobby on the east side of the plaza level. Date: July 7, 2015 Value: $82,818 Permit status: Closed-no resonse | Completion date: January 21, 2016 | Permit id: Bc-Reno-2015-13 |