Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Date: June 19, 2006 Permit id: 06-06-200 | Parcel: 001010001000 | |||||
Date: March 22, 2007 Permit id: 07-03-121 | Parcel: 046691001000 | |||||
Date: January 22, 2008 Permit id: 08-01-083 | Parcel: 046691001000 | |||||
Date: June 2, 2009 Permit id: 09-06-015 | Parcel: 046691001000 | |||||
Install 3 4" water meter and mxu. New sfd, parlin ranch unit 1a. Temporary water paid for six months from issuance date. Date: June 26, 2006 Permit id: 06-0478 | Parcel: 046691001000 | |||||
SCORE 100 Inground gunite pool, electric run & solar stub. All work shall comply with city standards. Access is limited to site driveway. Soil relocation requires written permission from receiving location. A pre-inspection is required! Final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Engineering inspection request line Date: March 26, 2007 Contractor: Aqua Pool And Spa Permit id: 07-0446 | Parcel: 046691001000 |