Building Permits at 29802 Spearhead Trl Valley Center Ca 92082


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 29802 Spearhead Trl Valley Center Ca 92082 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
82
Roof mount residential solar pv for existing sfd (no meter upgrade). 03-30-15 plan change: derated to 150amps..... New load calcs... Main centerfed... See coa tlh persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof.
Date:  March 9, 2015
Contractor: Rich Vallee

Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: April 9, 2015 | Permit id: Pds2015-Resalt-
2015/03/0908229802 Spearhead Trl Valley Center Ca 92082Rich Vallee
22 sf hra re-roof for existing sfd. (removal of existing asphalt shingles and replacement with asphalt shingles esr-1647.) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection.
Date:  June 20, 2014
Value:   $13,046

Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: July 3, 2014 | Permit id: Pds2014-Resalt-
2014/06/20130469529802 Spearhead Trl Valley Center Ca 92082
Connect 2 amp electrical meter panel
Date:  December 18, 2013

Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: February 13, 2014 | Permit id: Pds2013-Resalt-
2013/12/1809529802 Spearhead Trl Valley Center Ca 92082
Roof mount residential solar pv for existing sfd (no meter upgrade). 03-30-15 plan change derated to 150amps..... New load calcs... Main centerfed... See coa tlh persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof.
Date:  March 9, 2015

Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 9, 2015 | Permit id: Pds2015-Resalt-
2015/03/0909529802 Spearhead Trl Valley Center Ca 92082
22 sf re-roof for existing sfd. (removal of existing asphalt shingles and replacement with asphalt shingles esr-1647.) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection.
Date:  June 20, 2014
Value:   $13,046

Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 3, 2014 | Permit id: Pds2014-Resalt-
2014/06/20130469529802 Spearhead Trl Valley Center Ca 92082
SCORE
100
Roof mount residential solar pv for existing sfd (no meter upgrade). 03-30-15 plan change derated to 150amps..... New load calcs... Main centerfed... See coa tlh persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof.
Date:  March 9, 2015
Contractor: Solare Energy Inc

Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 9, 2015 | Permit id: Pds2015-Resalt-
2015/03/09010029802 Spearhead Trl Valley Center Ca 92082Solare Energy Inc
SCORE
99
22 sf re-roof for existing sfd. (removal of existing asphalt shingles and replacement with asphalt shingles esr-1647.) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection.
Date:  June 20, 2014
Value:   $13,046
Contractor: Baynes Roofing Inc

Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 3, 2014 | Permit id: Pds2014-Resalt-
2014/06/20130469929802 Spearhead Trl Valley Center Ca 92082Baynes Roofing Inc
Final
Date:  April 7, 2015

Permit status: Pass | Permit id: Pds2015-Resalt-
2015/04/0709529802 Spearhead Trl Valley Center Ca 92082
Final
Date:  July 1, 2014

Permit status: Pass | Permit id: Pds2014-Resalt-
2014/07/0109529802 Spearhead Trl Valley Center Ca 92082
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.