Content |
---|
Install 3 stop 950lb residential elevator wiring wiring, with 3 hall stations and a 3 stop controller. ![]() Permit status: Complete | Completion date: June 1, 2017 | Permit id: E201611101001 |
SCORE 93 Install 3 stop 950lb residential elevator wiring wiring with 3 hall stations and a 3 stop controller. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201611101001 |
Revision to permit 201511203221, addition of headers on 3rd floor & strongback at roof ![]() ![]() Permit type: Otc alterations permit | Expiration date: August 25, 2016 | Current use: 1 family dwelling | Permit id: 201608256020 |
SCORE 100 Revision to permit 201511203221 addition of headers on 3rd floor & strongback at roof Permit type: Building permit | Expiration date: December 31, 2016 | Current use: 1 family dwelling | Permit id: #201608256020 |
SCORE 93 Work category: 2pb; powder room bidet in master bathroom and relocate pipes in elevator shaft ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160321073 |
Workcategory:2pb;powderroom bidetinmasterbathroomandrelocatepipesinelevatorshaft ![]() Permit status: Issued | Expiration date: March 21, 2016 | Permit id: Pw20160321073 |
Work category: 2pb; powder room, bidet in master bathroom and relocate pipes in elevator shaft ![]() Permit status: Complete | Completion date: December 5, 2016 | Expiration date: March 21, 2016 | Permit id: Pw20160321073 |
SCORE 100 Temp shoring for elevator excavation. Reference application 201511203221 Permit type: Building permit | Current use: 1 family dwelling | Permit id: #201602260630 |
SCORE 98 Elevator circuit and disconnect in garage basement level. Reconfigure wiring switching outlets and lights in basement level-elevator lobby guest suite door guest bath and storage bath first floor-elevator lobby main hall and powder and second floor-master bedroom closet wall and 3 other bedrooms. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201602246439 |
Elevator circuit and disconnect in garage basement level. Reconfigure wiring, switching, outlets and lights in basement level-elevator lobby, guest suite door, guest bath, and storage bath, first floor-elevator lobby, main hall and powder, and second floor-master bedroom closet wall and 3 other bedrooms. ![]() Permit status: Complete | Completion date: December 16, 2016 | Permit id: Ew201602246439 |