Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
As built - reroof with lite concrete tile 24 sq ft and replace all windows in house with new tempered glass same net openable area and reset electrical meter and panel replaced, misc plumbing replace fx, relocate wh, and misc mech to replace fau ac for existing sfd 10 26 11 plan change add plumb mech see c of a... Vmd your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: October 21, 2011 Value: $20,040 Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2011-1005-20 | Parcel: 185-090-10-00 | |||||
SCORE 93 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: February 23, 2016 Contractor: Calafata Construction And Electric Inc Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2016-Resalt- |