SCORE 99 12-2374: delta 11 includes restroom changes associated mep. No exterior changes or square footage changes. Field clarification other mep. Field clarification details. Date: March 18, 2015 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 15rev-00166 | |||||
SCORE 99 12000-02374: deferred submittal - light gauge steel trusses Date: February 3, 2015 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 15rev-00059 | |||||
SCORE 99 12000-02374: deferred submittal for storefront Date: February 4, 2015 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 15rev-00063 | |||||
SCORE 99 12000-02374: revisions to adaptable shower configurations at residential units Date: March 10, 2015 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 15rev-00141 | |||||
SCORE 99 12000-02374: reconfiguration of storm drain lateral in page mill rd to avoid (e) utility conflicts Date: February 12, 2015 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 15rev-00083 | |||||
SCORE 99 12000-02374: deferred submittal for four (4) structural stairs. Date: January 28, 2015 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 15rev-00042 | |||||
SCORE 99 12000-02374: bulletin 2 changes which includes: reducing height of windows adjacent to doors leading to balconies, cooling towers on roof changed to condensers, light and vent calcs revised to comply with the 20 codes, changes due to field coordination issues, updates to show accessibility requirements within the units Date: November 5, 2014 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 14rev-00669 | |||||
SCORE 99 12000-02374: revisions to podium drainage and associated structural changes bulletin 1, delta 9 Date: May 19, 2014 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 14rev-00307 | |||||
SCORE 99 12000-02374: foundation only permit issued under original permit. The revision is for the remaining departments approval that still had comments when the foundation only permit was issued. Revision also includes removing a corner of the basement because it was too close to a pg&e gas line. Revise structural details to address the sanitary sewer pipepline passing through the structure . Park plaza is a new three story mixed use building with one level underground parking. Area of underground garage 104,0 sf. Commercial warm shell on the first floor (47,0 sf) and residential on the second and third floor (101,5 sf) 82 residential units. Date: December 10, 2013 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 13rev-00764 | |||||
SCORE 99 2 3 14 temp post on private property Date: December 18, 2013 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 13000-03354 | |||||
SCORE 99 12000-02374: reconfigure sanitary sewer lateral and storm drain line. Date: April 30, 2015 Contractor: Vance Brown Inc Permit status: In plan check | Permit id: 15rev-00250 | |||||
SCORE 99 Park plaza: new three story mixed use building with one level underground parking. Area of underground garage 104,0 sf. Commercial warm shell on the first floor (47,0 sf) and residential on the second and third floor (101,5 sf) 82 residential units. Permit originally issued for foundation only. Remainder of structure under 13rev-00764 and was opened for those departments which still had comments at issuance of foundation only permit. Date: September 20, 2012 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 12000-02374 |