Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Date: August 2, 2011 Permit id: 11-08-019 | Parcel: 045540005000 | |||||
Date: November 1, 2002 Permit id: 93-1010 | |||||
SCORE 94 Pool-1. Access is limited to site driveway. 2. Soil relocation requires written permission from receiving location. 3. Contractor shall install and practice the appropriate strom water bmps. 4. A pre-inspection is required! 5. All work shall comply with city standards and details. 6. Final engineering encroachment inspection is required prior to building permit final inspection. 7. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Pr Date: August 8, 2011 Contractor: Imperial Pools Permit id: 11-0167 | Parcel: 045540005000 |