Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 1, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 16, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 1, 2015 Contractor: Excel Air Corporation Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 16, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 86 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 5, 2017 Contractor: The Green Store Inc Permit type: Addn | Permit status: Completed | Completion date: September 20, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: July 15, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: November 9, 2010 Permit status: Pass | Permit id: Pds2007-1004-20 | |||||
Rough frame Date: September 20, 2007 Permit status: Pass | Permit id: Pds2007-1004-20 |