Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 19, 2016 Contractor: Solarcity Corporation Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 64 4 amp replacement panel misc electrical Date: September 5, 2017 Contractor: A P E S Access Power Electrical Services Permit type: Addn | Permit status: Completed | Completion date: November 8, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 65 Fire damage repair to include replacing 12 feet of trusses, 15 sqft of drywall repair, sqft of window replacement, re-frame north wall & facia repair, 104 sqft of stucco repair to (e) attached garage . Electrical & re-roof repair to be pulled under seperate permit Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 69 7 sf re-roof. Tile lift and relay - install new osb board and re-install existing tile if a re-roof project is proposed, the following specifications apply. Existing roofing material lift & relay existing weight s tile proposed roofing material lift & relay existing weight s tile manufacturer unknown (lift & relay) brand and model unknown (lift & relay) color (if cool roof required) tan built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: November 8, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: July 20, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Lath/drywall - interior Date: August 9, 2005 Permit status: Pass | Permit id: Pds2004-1003-20 | |||||
Final Date: May 24, 2007 Permit status: Pass | Permit id: Pds2007-1023-20 | |||||
Final Date: October 23, 2006 Permit status: Pass | Permit id: Pds2004-1003-20 |