Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 6 buildings apartment complex (total of 88 units) with ac, fs and 5 detached garages and 1 clubhouse and 2 trash enclosures for lakeview 88 as follow building 3 - 2 story buildings 16 units (8 units per floor) @ 16948 sq ft habitable 4 sq ft landing balconies, 242 sq ft stairs 13 sq ft patios 3 sf storage 2 amp electrical permit per unit and 1 house meter per building solar panels and prefabricated stairs to be deferred submittals notice to permittee temp power shall be inspected prior to framing inspection 5 20 2016 plan change. Change in sqft. See c of a... Ss Permit type: New primary comm structure | Permit status: Issued | Permit id: Pds2016-Compri- | |||||
Rough mechanical Date: March 2, 2017 Permit status: Pass | Permit id: Pds2016-Compri- | |||||
Roof nail Date: December 28, 2016 Permit status: Pass | Permit id: Pds2016-Compri- | |||||
SCORE 93 6 buildings apartment complex (total of 88 units) with ac, fs and 5 detached garages and 1 clubhouse and 2 trash enclosures for lakeview 88 as follow building 3 - 2 story buildings 16 units (8 units per floor) @ 16948 sq ft habitable 4 sq ft landing balconies, 242 sq ft stairs 13 sq ft patios 3 sf storage 2 amp electrical permit per unit and 1 house meter per building solar panels and prefabricated stairs to be deferred submittals notice to permittee temp power shall be inspected prior to framing inspection 5 20 2016 plan change. Change in sqft. See c of a... Ss Permit type: Residential apartment 4+ units | Permit status: Issued | Permit id: Pds2016-Compri- | Parcel: 5056721700 |