Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 62 Building renovations school renovations to mcdonogh 28 jr, high sch to inc: hvac work, fire alarm system, emergency & exit lighting, caulk, watpro as per plans and specs. Preliminary . Date: August 22, 2002 Contractor: Rene J. Becnel Client: School Board, Orleans Parish | Permit id: B02002347 | |||||
SCORE 89 Electrical reconnect school cleveland francois planned ourage reconnect Date: December 17, 2001 Contractor: Cleveland Francois Client: School Board, Orleans Parish | Permit id: E01009283 | |||||
SCORE 75 General repairs school repairs Date: January 8, 2002 Contractor: James Deane Client: School Board, Orleans Parish | Permit id: E02000192 | |||||
SCORE 82 Electrical rewiring school clinton armand Date: December 26, 2002 Contractor: Clinton Armand Client: School Board, Orleans Parish | Permit id: E02008518 | |||||
SCORE 97 Install mechanical equipment school install (31)- 5-ton hvac system, (14)- 4-ton system and 43-elec warm air furnace. Bernard j lyons 271-3431 Date: August 14, 2003 Contractor: Loucon Inc Client: School Board, Orleans Parish | Permit id: M03005048 | |||||
Install mechanical equipment school install (31)- 5-ton hvac system, (14)- 4-ton system and 43-elec warm air furnace. Bernard j lyons 271-3431 Date: August 13, 2003 Client: School Board, Orleans Parish | Permit id: M03005048 | |||||
SCORE 69 Install mechanical equipment school install (31)- 5-ton hvac system, (14)- 4-ton system and 43-elec warm air furnace. Bernard j lyons 271-3431 Date: August 13, 2003 Contractor: Loucon, Inc Client: School Board, Orleans Parish | Permit id: M03005048 | |||||
SCORE 82 Building renovations school renovations and repairs of existing rest rooms for students and staff at mcdonogh #28,jr high as per plans. //// preliminary ///. Date: December 12, 2001 Contractor: Sada Pethe Client: School Board, Orleans Parish | Permit id: B01004273 |