Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing photovoltaic system on roof Date: August 3, 2015 Contractor: A And R Solar Permit type: Electrical | Permit status: Permit closed | Completion date: September 4, 2015 | Expiration date: August 2, 2016 | Current use: Single family / duplex | Permit id: 6487714 | |||||
SCORE 95 Amp overhead temporary power pole - building project #2503351. Date: June 30, 2005 Contractor: Meridian Center Electric Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: July 27, 2005 | Expiration date: June 30, 2006 | Current use: Single family / duplex | Permit id: 6060770 | |||||
SCORE 95 Installing natural gas furnace in new sfr; bldg permit 75175010 27 05 bew corrected furnace to heat pump Date: October 13, 2005 Contractor: All Ways Air Control Inc Applicant: All Ways Air Control Inc | Permit type: Mechanical | Permit status: Permit finaled | Completion date: November 8, 2005 | Expiration date: April 13, 2007 | Current use: Single family / duplex | Permit id: 6075739 | |||||
SCORE 95 Remodel existing single family residence 10 17 05 bew added items to permit 8 17 06 jnl - expired letter sent Date: September 9, 2005 Contractor: Meridian Center Electric Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: September 8, 2006 | Expiration date: September 9, 2006 | Current use: Single family / duplex | Permit id: 6071836 |