Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
The dc clean rivers deep tunnel project is performing civil site work at joint base anacostia bolling. Date: July 21, 2014 Client: Dc Water Dc Water | Applicant: Dc Water Dc Water; Andrew Donnelly; ; Carlton Ray | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400058 | |||||
SCORE 56 6 soil borings advanced with a track mounted geoprobe. Borings will be advanced to a depth of feet. Borings will be abandoned in accordance with doee requirements. Date: October 14, 2015 Client: Na District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600004 | |||||
SCORE 56 The dc clean rivers deep tunnel project is performing civil site work at joint base anacostia bolling. Date: July 21, 2014 Contractor: Dc Water Dc Water Andrew Donnelly Carlton Ray Client: Dc Water Dc Water | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400058 | |||||
SCORE 56 The dc clean rivers deep tunnel project is performing civil site work at joint base anacostia bolling. Date: July 21, 2014 Client: Dc Water Dc Water | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400058 | |||||
SCORE 96 Construction of combined sewer overflow along the potomac river. This project is associated with the dc water clean rivers project division d. The project is associated with civil permit bciv1400058. The project is phase 5 of 7. Date: July 24, 2015 Contractor: Isatu Bradshaw Client: Isatu Bradshaw | Permit type: New building | Permit status: Permit issued | Permit id: B1505700 | |||||
SCORE 96 Demolition of a portion of the dc water potomac outfall sewer, pos, and construction of a wastewater diversion chamber and approach channel. This project is associated with civil permit bciv1400058. The project is phase 4 of 7. Date: July 24, 2015 Contractor: Isatu Bradshaw Client: Dc Water | Permit type: New building | Permit status: Permit issued | Permit id: B1505473 | |||||
SCORE 96 The work is soil borings for installation of 5 utility monitoring points, 1 inclinometer and 1 monitoring well associated with new structures along the dc water clean rivers blue plains tunnel, division d project. The borings are planned to be drilled 8. 5-inch od hollow stem augers. The approximate depths are as follows: utility monitoring points - 15ft, inclinometer - 65ft and, monitoring well - 40ft. This project is associated with civil permit bciv 1400058. The project is phase two of seven. Date: March 27, 2015 Contractor: Isatu Bradshaw Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500177 | |||||
SCORE 56 6 soil borings advanced with a track mounted geoprobe. Borings will be advanced to a depth of feet. Borings will be abandoned in accordance with doee requirements. Date: October 14, 2015 Client: Na District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600004 | |||||
SCORE 71 A total of four 6-inch diameter soil test borings will be drilled using 2. 25-inch continuous hollow stem flight augers. The borings will extend to a maximum depth of feet below current site grades using a truck-mounted drill rig. The samples will be containerized in glass jars for geotechnical classification and laboratory testing. After boring completion the boreholes will be grouted with bentonite slurry 2 lbs of bentonite to 1 gallon of water and the auger cuttings and all other investigation derived waste will be containerized in sealed drums per ddoe permit. Date: July 17, 2015 Contractor: Dmy Capitol Llc Client: Department Of Public Works | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500383 | |||||
SCORE 96 The work is support of excavation associated with new structures along the dc water clean rivers blue plains tunnel, division d project. It is located on the north side of macdill blvd. Sw on jbab private property and associated with civil permit bciv1400058. The project is phase one of six. Date: February 27, 2015 Contractor: Isatu Bradshaw Client: Dc Water | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1500023 | |||||
SCORE 96 Construction of an odor control structure. This structure houses the odor control components associated with the overflow of the combined sewer system. This project is associated with the dc water clean rivers project division d. This project is associated with civil permit bciv1400058. The project is phase 6 of 7. Date: April 11, 2016 Contractor: Isatu Bradshaw Client: Isatu Bradshaw | Permit type: New building | Permit status: Permit issued | Permit id: B1505701 | |||||
SCORE 56 Dc government owned project and building to be raze located at 27 south capitol st, square par, lot 001 owned by dept of public works and currently vacant. This project is part of the dc soccer stadium redevelopment. The vacant building is being razed to make room for the temporary salt facility. Date: April 4, 2016 Contractor: Ian Swain Communet; Swain Client: Dc Government Department Of Public Works | Permit type: Raze | Permit status: Permit issued | Permit id: R1600061 | |||||
SCORE 56 First extension of permit #bciv1400058 to expire 1/21/16. This permit is a renewal of a previously approved civil permit in relation to the dc water clean rivers project division d jbab overflow and diversion structures. Date: July 10, 2015 Contractor: Isatu Bradshaw; J. Tucker Waite; J. Tucker Waite Client: Dc Water | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1500126 | |||||
SCORE 96 Jet grouting associated with the new structures along the dc water clean rivers blue plains tunnel, dvision d project. 66 columns, target depths between and feet. Taget water/cement ratio equals 0. 7, rotary drilling method. The borings are planned to be drilled up to 8 inches od. Date: November 19, 2015 Contractor: Isatu Bradshaw Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500390 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfhi4hzakmzlh0mksl%2fmvsg Date: May 27, 2016 Contractor: Devon Rose; Ahmed Eyow; Jerone Scott Client: Ahmed Eyow | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P95495286 | |||||
SCORE 56 2nd extension to permit #b1400058 to expire 7/21/16. This permit is a renewal of a previously approved civil permit in relation to the dc water clean rivers project division d - jbab overflow and diversion structures Date: February 10, 2016 Contractor: Isatu Bradshaw; J. Tucker Waite; Carlton Ray Client: Carlton Ray - Dc Water | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1600037 |