Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 This permit is granted to jfk center for installation of lightpole banners on 13 locations directly around the kennedy center to include 25th street, 27th street and va avenue nw . As per approved design ddot standards and specifications. Date: June 9, 2010 Contractor: Sign Concepts Sign Concepts Client: John F. Kennedy Center | Permit type: Fixture; banner(s) | Permit status: Permit expired | Expiration date: October 18, 2010 | Permit id: Pa55931 | |||||
SCORE 67 Total of 45 poles to be used as per plans this permit is for three months only traffic safety devices must be used when posting and removing banners Date: January 9, 2006 Contractor: Wash National Opera Permit status: Permit expired | Expiration date: April 23, 2006 | Permit id: Pa17141 | |||||
SCORE 71 This work consists of the relocation of an existing street light pole from the east side of rock creek parkway to the west side of rock creek parkway. This work is proposed in order to avoid conflict with the future building expansion of the kennedy center for the performing arts. Date: January 25, 2016 Contractor: Noelle Trent Client: Denny Whitten | Permit type: Over head work; streetlight(s) installation | Permit status: Revise and resubmit | Expiration date: May 2, 2016 | |||||
SCORE 73 Call sgt. Schaefer prior to move 202-359-62 - kenworth, lic 454-f55 - move mobile office trailer Date: April 20, 2006 Contractor: Avon Walk For Breast Cancer Permit status: Permit expired | Expiration date: April 30, 2006 | Permit id: Pa19128 | |||||
SCORE 70 As part of the expansion work to the john f. Kennedy performing arts center, the owner and construction team need to relocate a street light along the northbound side of rock creek and potomac parkway to the southbound side. The contractor, davis construction, has informed us that no work will be done within the travel-way or r. O. W. As the existing street light is on the kennedy center property and the proposed relocation is on the national parks property. Date: November 1, 2016 Contractor: Tom Gnecco Client: Thomas Whitaker | Permit type: Over head work; streetlight temporary removal, over head work; streetlight(s) installation | Permit status: Revise and resubmit | Expiration date: December 2, 2016 | |||||
SCORE 59 Fixture; banner(s) Date: August 25, 2010 Contractor: Sign Concepts Sign Concepts Permit status: 8 | Expiration date: October 18, 2010 | Permit id: Pa55931 | |||||
SCORE 56 Roll off debris container Date: November 18, 2010 Contractor: Matt Crea Permit status: Expired | Expiration date: May 20, 2011 | Permit id: Pa10016753 | |||||
SCORE 79 Over head work; pole decor (e. G. Banners) Contractor: The Kennedy Center Permit status: 12 | Expiration date: July 1, 2017 | Permit id: 0 | |||||
SCORE 73 Date: April 20, 2006 Contractor: Avon Walk For Breast Cancer Permit status: 8 | Expiration date: April 30, 2006 | Permit id: Pa19128 | |||||
SCORE 71 Over head work; streetlight(s) installation Contractor: Noelle Trent Permit status: 3 | Expiration date: May 2, 2016 | Permit id: 0 | |||||
SCORE 67 Date: January 13, 2006 Contractor: Wash National Opera Permit status: 8 | Expiration date: April 23, 2006 | Permit id: Pa17141 | |||||
SCORE 79 This is a permit for installation (of brackets) on street poles for the hanging of promotion banners for the kennedy center (the last time we did this was in 2010). We already have the banners and will produce art and pay (our contractor) to put the banners up. Date: February 6, 2017 Contractor: The Kennedy Center Permit type: Over head work; pole decor (e. G. Banners) | Permit status: Assigned | Expiration date: July 1, 2017 | Permit id: 0 | |||||
SCORE 65 Other reserved parking Contractor: Thomas Whitaker Permit status: Rejected | Expiration date: January 21, 2016 | Permit id: 0 | |||||
SCORE 65 Other reserved parking Contractor: Thomas Whitaker Permit status: Withdrawn | Expiration date: January 14, 2016 | Permit id: 0 | |||||
SCORE 72 Construction staging area Contractor: James. G Davis Construction Company Permit status: Notpaid | Expiration date: November 4, 2016 | Permit id: 0 | |||||
SCORE 56 As part of the expansion work to the john f. Kennedy performing arts center, the owner and construction team need to relocate a street light along the northbound side of rock creek and potomac parkway to the southbound side. The contractor, davis construction, has informed us that no work will be done within the travel-way or r. O. W. As the existing street light is on the kennedy center property and the proposed relocation is on the national parks property. Date: May 31, 2017 Contractor: Ryan Linthicum Permit status: Issued | Expiration date: August 22, 2017 | Permit id: Pa185994 | |||||
SCORE 79 This is a permit for installation (of brackets) on street poles for the hanging of promotion banners for the kennedy center (the last time we did this was in 2010). We already have the banners and will produce art and pay (our contractor) to put the banners up. Contractor: The Kennedy Center Permit status: Resubmitted | Expiration date: July 1, 2017 | Permit id: 0 | |||||
SCORE 65 Other reserved parking Contractor: Thomas Whitaker Permit status: Withdrawn | Expiration date: January 14, 2016 | Permit id: 0 | |||||
SCORE 65 Other reserved parking Contractor: Thomas Whitaker Permit status: Rejected | Expiration date: January 21, 2016 | Permit id: 0 | |||||
SCORE 72 Construction staging area Contractor: James. G Davis Construction Company Permit status: Not paid | Expiration date: November 4, 2016 | Permit id: 0 | |||||
SCORE 70 As part of the expansion work to the john f. Kennedy performing arts center, the owner and construction team need to relocate a street light along the northbound side of rock creek and potomac parkway to the southbound side. The contractor, davis construction, has informed us that no work will be done within the travel-way or r. O. W. As the existing street light is on the kennedy center property and the proposed relocation is on the national parks property. Date: November 1, 2016 Contractor: Tom Gnecco Client: Thomas Whitaker | Permit type: Over head work; streetlight temporary removal, over head work; streetlight(s) installation, over head work; streetlight damage deposit (office use only) | Permit status: Permit expired | Expiration date: August 22, 2017 | Permit id: Pa185994 | |||||
SCORE 70 As part of the expansion work to the john f. Kennedy performing arts center, the owner and construction team need to relocate a street light along the northbound side of rock creek and potomac parkway to the southbound side. The contractor, davis construction, has informed us that no work will be done within the travel-way or r. O. W. As the existing street light is on the kennedy center property and the proposed relocation is on the national parks property. Date: July 24, 2017 Contractor: Tom Gnecco Client: Thomas Whitaker | Permit type: Over head work; streetlight temporary removal, over head work; streetlight(s) installation, over head work; streetlight damage deposit (office use only) | Permit status: Issued | Expiration date: October 21, 2017 | Permit id: Pa185994-R1 | |||||
SCORE 70 As part of the expansion work to the john f. Kennedy performing arts center, the owner and construction team need to relocate a street light along the northbound side of rock creek and potomac parkway to the southbound side. The contractor, davis construction, has informed us that no work will be done within the travel-way or r. O. W. As the existing street light is on the kennedy center property and the proposed relocation is on the national parks property. Contractor: Tom Gnecco Client: Thomas Whitaker | Permit type: Over head work; streetlight temporary removal, over head work; streetlight(s) installation, over head work; streetlight damage deposit (office use only) | Permit status: Issued | Expiration date: December 20, 2017 | Permit id: Pa185994-R2 | |||||
SCORE 89 Install a 30x6 bikeshare rack along the sidewalk of the kennedy center east of the service entrance on f street. Date: July 20, 2010 Contractor: Chris Holben Permit type: Fixture; bike share station, fixture; bike rack(s) | Permit status: Permit expired | Expiration date: September 30, 2010 | Permit id: Pa56693 | |||||
SCORE 71 Over head work; streetlight(s) installation Contractor: Noelle Trent Permit status: 3 | Expiration date: May 2, 2016 | Permit id: 0 | |||||
SCORE 56 Excavation; under pinning in adjacent row (for buildings) Date: May 20, 2016 Contractor: Nathan Reinhart Client: John F. Kennedy Center For The Preforming Arts | Permit type: Excavation; under pinning in/adjacent row (for buildings) | Permit status: Permit expired | Expiration date: September 15, 2016 | Permit id: Pa158006 | |||||
SCORE 96 Kennedy center - make necessary excavation to connect underground service by installing 479 feet of mainline conduit and miscellaneous equipment, also install 1 manhole; in front of 27 f street n. W, in the sidewalk roadway and islandof f street and e street expressway n. W. As indicated on attached prints. Tcp site specific. Wr #3472166; cut #30395; ward 2; walter altemburger/202-388-2576/waltemburger@pepco. Com (jshorts/raclan) Date: October 26, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; manhole installation, excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: January 12, 2017 | Permit id: Pa185749 | |||||
SCORE 70 As part of the expansion work to the john f. Kennedy performing arts center, the owner and construction team need to relocate a street light along the northbound side of rock creek and potomac parkway to the southbound side. The contractor, davis construction, has informed us that no work will be done within the travel-way or r. O. W. As the existing street light is on the kennedy center property and the proposed relocation is on the national parks property. Date: May 31, 2017 Contractor: Tom Gnecco Client: Thomas Whitaker | Permit type: Over head work; streetlight temporary removal, over head work; streetlight(s) installation, over head work; streetlight damage deposit (office use only) | Permit status: Issued | Expiration date: August 22, 2017 | Permit id: Pa185994 | |||||
SCORE 79 Over head work; pole decor (e. G. Banners) Contractor: The Kennedy Center Permit status: 12 | Expiration date: July 1, 2017 | Permit id: 0 | |||||
SCORE 65 Other reserved parking Contractor: Thomas Whitaker Permit status: Withdrawn | Expiration date: January 14, 2016 | Permit id: 0 | |||||
SCORE 65 Other reserved parking Contractor: Thomas Whitaker Permit status: Rejected | Expiration date: January 21, 2016 | Permit id: 0 | |||||
SCORE 72 Construction staging area Contractor: James. G Davis Construction Company Permit status: Notpaid | Expiration date: November 4, 2016 | Permit id: 0 | |||||
SCORE 96 Kennedy center - make necessary excavation to connect underground service by installing 479 feet of mainline conduit and miscellaneous equipment, also install 1 manhole; in front of 27 f street n. W, in the sidewalk roadway and islandof f street and e street expressway n. W. As indicated on attached prints. Tcp site specific. Wr #3472166; cut #30395; ward 2; walter altemburger 202-388-2576 waltemburger@pepco. Com (jshorts raclan) Date: December 13, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; manhole installation, excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: March 13, 2017 | Permit id: Pa185749-R1 | |||||
SCORE 79 This is a permit for installation (of brackets) on street poles for the hanging of promotion banners for the kennedy center (the last time we did this was in 2010). We already have the banners and will produce art and pay (our contractor) to put the banners up. Contractor: The Kennedy Center Permit status: Assigned | Expiration date: July 1, 2017 | Permit id: 0 | |||||
SCORE 96 Kennedy center - make necessary excavation to connect underground service by installing 479 feet of mainline conduit and miscellaneous equipment, also install 1 manhole; in front of 27 f street n. W, in the sidewalk roadway and islandof f street and e street expressway n. W. As indicated on attached prints. Tcp site specific. Wr #3472166; cut #30395; ward 2; walter altemburger 202-388-2576 waltemburger@pepco. Com (jshorts raclan) Date: February 13, 2017 Contractor: Potomac Electric Power Company Permit type: Excavation; manhole installation, excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: May 12, 2017 | Permit id: Pa185749-R2 | |||||
SCORE 87 Construction staging area Date: August 2, 2016 Contractor: James G. Davis Construction Permit status: Permit expired | Expiration date: December 27, 2016 | Permit id: Pa10310140 | |||||
SCORE 65 Other reserved parking Contractor: Thomas Whitaker Permit status: Rejected | Expiration date: January 21, 2016 | Permit id: 0 | |||||
SCORE 65 Other reserved parking Contractor: Thomas Whitaker Permit status: Withdrawn | Expiration date: January 14, 2016 | Permit id: 0 | |||||
SCORE 72 Construction staging area Date: October 14, 2016 Contractor: James. G Davis Construction Company Permit status: Permit expired | Expiration date: December 1, 2016 | Permit id: Pa10335708 | |||||
SCORE 72 Construction staging area Contractor: James. G Davis Construction Company Permit status: Not paid | Expiration date: November 4, 2016 | Permit id: 0 | |||||
SCORE 72 Other work related occupancy Date: January 19, 2017 Contractor: Arman Fahmian Permit status: Permit expired | Expiration date: February 28, 2017 | Permit id: Pa10370143 | |||||
SCORE 72 Construction staging area Date: March 28, 2017 Contractor: James. G Davis Construction Company Permit status: Permit expired | Expiration date: April 28, 2017 | Permit id: Pa10379517 |