Construct alterations to the first floor of existing townhouse, per plan. Date: September 28, 2015 Value: $5,881 Applicant: Floyd, Stan | Permit type: Construction | Permit status: Permit issued | Current use: Multifamily | Permit id: 6480844 | |||||
SCORE 56 Add 3 circuits to new mudroom constructed within garage. Main electrical panel located on same floor roughly 40ft from room. Dedicated 20a circuit to power point-of-use water heater for sink. Two additional circuits to power lighting (15a) and receptacles (20a). Date: March 20, 2016 Contractor: Floyd Joseph Permit type: Electrical | Permit status: Permit issued | Expiration date: March 20, 2017 | Current use: Multifamily | Permit id: 6524911 | |||||
SCORE 100 Install gas furnace - sylvan heights Date: June 2, 2008 Contractor: Air 1 Heating Inc Applicant: Air 1 Heating, Inc. | Permit type: Mechanical | Permit status: Permit issued | Expiration date: December 2, 2009 | Current use: Single family / duplex | Permit id: 6182154 | |||||
SCORE 56 Add 3 circuits to new mudroom constructed within garage. Main electrical panel located on same floor roughly 40ft from room. Dedicated 20a circuit to power point-of-use water heater for sink. Two additional circuits to power lighting (15a) and receptacles (20a). Date: March 20, 2016 Contractor: Floyd, Joseph Permit type: Electrical | Permit status: Permit issued | Expiration date: March 20, 2017 | Current use: Multifamily | Permit id: 6524911 | |||||
SCORE 100 Install gas furnace - sylvan heights Date: June 2, 2008 Contractor: Air 1 Heating, Inc Applicant: Air 1 Heating, Inc. | Permit type: Mechanical | Permit status: Permit issued | Expiration date: December 2, 2009 | Current use: Single family / duplex | Permit id: 6182154 |