Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: September 27, 2012 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 429761 | |||||
Suppression permit Date: October 15, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 494557 | |||||
Use permit Date: July 17, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 483063 | |||||
Electrical permit Date: January 28, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 450492 | |||||
Zoning permit Date: August 14, 2012 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 419990 | |||||
Alteration permit Date: October 17, 2011 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 361436 | |||||
Administrative permit Date: July 2, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 461785 | |||||
Mechanical permit Date: February 20, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 454432 | |||||
Zoning permit Date: July 5, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 465368 | |||||
Permit for the relocation of lot lines to create two (2) lots from one (1) lot with the following modifications. Lot 1 (2605-07 catharine st) no change to the existing two story single family dwelling, lot 2 (2609 catharine st.) for the erection of new three (3) story single family dwelling with a cellar and roof deck with an accessory access structure for the deck, (size and location to be as shown in the application), as part of single family dwellings Date: May 17, 2013 Client: Blitzer Daniel Blitzer Georgina | Applicant: Michael Mattioni, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: July 1, 2013 | Permit id: 20469 | |||||
Permit for the relocation of lot lines to create two (2) lots from one (1) lot (two (2) deeded lots with one (1) brt account number). For the complete demolition of all existing structures and for the erection of a three (3) story semi-detached structure with cellar 35 high and roof deck with 42" high railing and pilot house not to exceed 48 sq ft maximum high above the roof surface (overall height including pilot house 45) for uses as a one (1) family dwelling on both lots. Date: April 1, 2011 Client: Blitzer Daniel Blitzer Georgina | Applicant: Dawn Tancredi, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 14869 | |||||
Use permit Date: July 17, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 483063 | |||||
Alteration permit Date: October 17, 2011 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 361436 | |||||
Administrative permit Date: July 2, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 461785 | |||||
Mechanical permit Date: February 20, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 454432 | |||||
Suppression permit Date: October 15, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 494557 | |||||
Electrical permit Date: January 28, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 450492 | |||||
Plumbing permit Date: September 27, 2012 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 429761 | |||||
Zoning permit Date: August 14, 2012 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 419990 | |||||
Zoning permit Date: July 5, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit status: Completed | Permit id: 465368 | |||||
Permit for the relocation of lot lines to create two (2) lots from one (1) lot with the following modifications. Lot 1 (2605-07 catharine st) no change to the existing two story single family dwelling, lot 2 (2609 catharine st.) for the erection of new three (3) story single family dwelling with a cellar and roof deck with an accessory access structure for the deck, (size and location to be as shown in the application), as part of single family dwellings Date: May 17, 2013 Client: Blitzer Daniel Blitzer Georgina | Applicant: Michael Mattioni, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: July 1, 2013 | Permit id: 20469 | |||||
Permit for the relocation of lot lines to create two (2) lots from one (1) lot (two (2) deeded lots with one (1) brt account number). For the complete demolition of all existing structures and for the erection of a three (3) story semi-detached structure with cellar 35 high and roof deck with 42" high railing and pilot house not to exceed 48 sq ft maximum high above the roof surface (overall height including pilot house 45) for uses as a one (1) family dwelling on both lots. Date: April 1, 2011 Client: Blitzer Daniel Blitzer Georgina | Applicant: Dawn Tancredi, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 14869 | |||||
Administrative permit to amend a p# 361436 to reflect as built conditions in the field per sealed enginners plan and structural report to add roof deck with stairs access. Include structural report to file. Date: July 2, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit type: Administrative permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 461785 | |||||
SCORE 100 Rough in and complete the following 1st fl kitchen sink 2nd 2 toilets, 2 lavs 2 tub showers (sfd) Date: September 27, 2012 Contractor: Ralph Greenwald Client: Blitzer Daniel Blitzer Georgina | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 6, 2013 | Permit id: 429761 | |||||
New roof deck on the rear of an existing sfd with stairs-sfd Date: August 14, 2012 Client: Blitzer Daniel Blitzer Georgina | Permit type: Zoning permit | Permit status: Completed | Completion date: November 5, 2012 | Permit id: 419990 | |||||
SCORE 100 Install 200a service, new outlets and new fixtures. All work done in accordance with 2008 nec(sfd)(south dist) Date: January 28, 2013 Contractor: Landair Wireless Ltd Client: Blitzer Daniel Blitzer Georgina | Permit type: Electrical permit | Permit status: Completed | Completion date: July 20, 2013 | Permit id: 450492 | |||||
Renovation to an existing two story single family dwelling. See a p # 363996 to comply dangerous case - rebuild rear side collapsed wall. Separate permits required for electric; plumbing and mechanical work. Licensed contractor required. Date: October 17, 2011 Client: Blitzer Daniel Blitzer Georgina | Permit type: Alteration permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 361436 | |||||
SCORE 100 Installation of nfpa 13d sprinkler system served by 1" combined domestic fire service for single family dwelling Date: October 15, 2013 Contractor: B. M. Consulting Services Inc Client: Blitzer Daniel Blitzer Georgina | Permit type: Suppression permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 494557 | |||||
Relocation of lot lines to create (2) lots from (1). Existing (2) story sfd to remain and for the erection of a new three story sfd with cellar and roof deck with roof access structure. Date: July 5, 2013 Client: Blitzer Daniel Blitzer Georgina | Permit type: Zoning permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 465368 | |||||
SCORE 100 Install 3 ton a c, install 100,000. Btu 92% furnace(payne) with related duct work. Date: February 20, 2013 Contractor: Francis Savarese Client: Blitzer Daniel Blitzer Georgina | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 28, 2013 | Permit id: 454432 |