Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
For partial demolition of existing 2 story rear portion (size 12x12 ft) and erection of a rear addition as part of an existing attached structure. Size and location as shown on the application. For use as household living single family dwelling as previously approved. Date: April 24, 2017 Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 24, 2017 | Permit id: 763759 | |||||
SCORE 69 For the erection of 3rd floor addition and 1st and 2nd floor rear addition to an existing 2-story attached building with interior alteration as per approved plan. Date: October 2, 2017 Contractor: Anvil Development Group Permit type: Addition permit | Permit status: Active | Completion date: October 23, 2017 | Permit id: 790060 | |||||
SCORE 69 Make safe permit - for infill of rear wall as per engineer? S report, to resolve case #584347. Abutting sidewalk must be closed with fencing a minimum of 6? In height. Separate streets department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case #584347. Permit received from downstairs Date: August 2, 2017 Contractor: Anvil Development Group Permit type: Alteration permit | Permit status: Completed | Completion date: August 10, 2017 | Permit id: 804886 |