Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 92 Replace x 8 of sheetrock and 2 of r-13 insulation. Sub-contracted the mold removal with a remediation company. Per mike reynolds, post remediation clearance report required before final inspection. Permit type: Residential addition-alteration | Permit status: Finaled | Current use: Residential | Permit id: B17-1873 | Parcel: 041180006 |