Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 19, 2013 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: September 6, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 100 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 25, 2015 Contractor: A S I Hastings Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 19, 2013 Contractor: Pure Solar Power Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 6, 2013 | Permit id: Pds2013-Resalt- | |||||
Final Date: September 4, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |